And I believe the Loram rail grinder has reached Rigby
Railroad Forums
Moderator: MEC407
BM6569 wrote:The 2nd rail train was being unloaded at MP 1 in Keag yesterday. Probably filling in the last spots of stick rail east of NMJI was up there this weekend, no rail has been dumped through Mattawamkeag or Winn, or through downtown Lincoln although they have dropped some OTM in those areas for future installation of CWR.
MaineRailfan wrote: ↑Mon Oct 14, 2024 1:15 am Those might be for EMR. There is another TR gon at Mattawamkeag with a pile of ties unloaded next to it on the EMR side.Looks like those same 5 were on the headpin of today's NBSR 120 out of McAdam.
BM6569 wrote: ↑Mon Oct 14, 2024 7:41 am...should be covered by the next rail train whenever that is. 0-4, 12-14 and 29-35Looks like the W020 was tacked on M426-15, should be through Chester soon.
MaineRailfan wrote: ↑Mon Oct 07, 2024 7:13 pm GBI Right of ways has a few excavators and a bulldozer at Mattawamkeag and it appears they will be installing new switches on the main up there soon.Further west to extend the sidings?
bostontrainguy wrote: ↑Tue Oct 15, 2024 10:27 amNegative, they are doing the main line switches off of Track 3 and Track 11 and possibly the one for 15 and 19. I think I counted 6 switch panels, so everything would add up correct for that. They are also installing switches for Track 4 in Lincoln.MaineRailfan wrote: ↑Mon Oct 07, 2024 7:13 pm GBI Right of ways has a few excavators and a bulldozer at Mattawamkeag and it appears they will be installing new switches on the main up there soon.Further west to extend the sidings?