Amtrak to overhaul 12 CDOT P40DC's

Discussion relating to the operations of MTA MetroNorth Railroad including west of Hudson operations and discussion of CtDOT sponsored rail operations such as Shore Line East and the Springfield to New Haven Hartford Line

Moderators: GirlOnTheTrain, nomis, FL9AC, Jeff Smith

nomis
Posts: 2175
Joined: Fri Jan 02, 2009 1:52 pm
Location: MRS 20 (was QA 9 & QB 2)

Re: Amtrak to overhaul 12 CDOT P40DC's

Post by nomis »

Hey, at lease 3 of the 4 ex-NJT units have the new and upgraded air compressor. :-)
Moderator: Metro-North (with CDOT), Photography & Video

Avatar: An overnight trip on Girard Ave. stumbles upon 6 PCC's and an LRV stuck within two blocks.

Traingeek3629
Posts: 172
Joined: Sun Feb 18, 2018 9:00 am

Re: Amtrak to overhaul 12 CDOT P40DC's

Post by Traingeek3629 »

I'm praying the poor P40s get a new paint job rather than someone throwing a Connecticut Commuter Rail sticker on them.

Although the discussion of the Constitution Liners is old and off-topic, I'd like to add that I saw them today, there were 10-12 of them on Track 6.
TRAIN APPROACHING, PLEASE REMAIN BEHIND THE YELLOW LINE

Backshophoss
Posts: 6448
Joined: Mon Mar 05, 2012 7:58 pm

Re: Amtrak to overhaul 12 CDOT P40DC's

Post by Backshophoss »

They will get the"Butt Ugly" ConnDOT "X-Box" scheme when rebuilt. :( :( :(
The Land of Enchantment is not Flyover country!

DutchRailnut
Posts: 22353
Joined: Thu Mar 11, 2004 8:02 pm
Location: released from Stalag 13

Re: Amtrak to overhaul 12 CDOT P40DC's

Post by DutchRailnut »

nomis wrote:Hey, at lease 3 of the 4 ex-NJT units have the new and upgraded air compressor. :-)
like that would make difference on 3 car trains ?
If Conductors are in charge, why are they promoted to be Engineer???

Retired Triebfahrzeugführer. I am not a moderator.

njt/mnrrbuff
Posts: 3611
Joined: Thu Sep 30, 2004 9:33 pm

Re: Amtrak to overhaul 12 CDOT P40DC's

Post by njt/mnrrbuff »

The new paint scheme doesn't look that bad. It will serve it's purpose-demonstrating that the scheme is for intended use on any CDOT owned motive power. The days of the old McGinnis paint scheme are over, pretty much, and in general, it would be good for the rolling stock to have a paint scheme representing what the current true colors really mean.

User avatar
GirlOnTheTrain
Posts: 587
Joined: Mon May 25, 2015 7:19 pm

Re: Amtrak to overhaul 12 CDOT P40DC's

Post by GirlOnTheTrain »

Butt ugly Coke Zero/XBox is still an improvement over the mismatched krylon, bondo and stickers these things are currently sporting.
"I am no longer just a girl on the train, going back and forth without point or purpose."

Moderator: Amtrak, MTA Metro-North, MTA New York City Subway/PATH/NYC Area Light Rail

Traingeek3629
Posts: 172
Joined: Sun Feb 18, 2018 9:00 am

Re: Amtrak to overhaul 12 CDOT P40DC's

Post by Traingeek3629 »

Are any of them in the NH yard yet post-overhaul? I'd love to get down and see them.
TRAIN APPROACHING, PLEASE REMAIN BEHIND THE YELLOW LINE

nomis
Posts: 2175
Joined: Fri Jan 02, 2009 1:52 pm
Location: MRS 20 (was QA 9 & QB 2)

Re: Amtrak to overhaul 12 CDOT P40DC's

Post by nomis »

If the contract was just awarded, and it is for 1,100 days. There will be 11 units ready in 1,000 days ;-)
Moderator: Metro-North (with CDOT), Photography & Video

Avatar: An overnight trip on Girard Ave. stumbles upon 6 PCC's and an LRV stuck within two blocks.

Traingeek3629
Posts: 172
Joined: Sun Feb 18, 2018 9:00 am

Re: Amtrak to overhaul 12 CDOT P40DC's

Post by Traingeek3629 »

So we've got a couple of months before the first is in.
TRAIN APPROACHING, PLEASE REMAIN BEHIND THE YELLOW LINE

Backshophoss
Posts: 6448
Joined: Mon Mar 05, 2012 7:58 pm

Re: Amtrak to overhaul 12 CDOT P40DC's

Post by Backshophoss »

If Beech Grove is doing the rebuilds,is the plan to add a ConnDOT unit at Springfield to the Lake Shore Ltd for the ferry move west?
Or have CSX Drag them in a 1 shot move to Beech Grove??
The Land of Enchantment is not Flyover country!

User avatar
BandA
Posts: 2924
Joined: Thu Oct 11, 2012 11:47 am

Re: CDOT sends out RFP for overhaul of 12 P40DC's

Post by BandA »

jdb wrote:Contract Award Posted.

https://biznet.ct.gov/SCP_Documents/Res ... -25-18.pdf" onclick="window.open(this.href);return false;
159 page PDF IMAGES! Not searchable.

DutchRailnut
Posts: 22353
Joined: Thu Mar 11, 2004 8:02 pm
Location: released from Stalag 13

Re: Amtrak to overhaul 12 CDOT P40DC's

Post by DutchRailnut »

problem must be on your end, no problem seeing the PDF pages of contract.
If Conductors are in charge, why are they promoted to be Engineer???

Retired Triebfahrzeugführer. I am not a moderator.

User avatar
GirlOnTheTrain
Posts: 587
Joined: Mon May 25, 2015 7:19 pm

Re: Amtrak to overhaul 12 CDOT P40DC's

Post by GirlOnTheTrain »

Yeah, you can see the PDF but you can't actually search it.
"I am no longer just a girl on the train, going back and forth without point or purpose."

Moderator: Amtrak, MTA Metro-North, MTA New York City Subway/PATH/NYC Area Light Rail

ConstanceR46
Posts: 443
Joined: Tue Feb 28, 2017 10:57 pm

Re: Amtrak to overhaul 12 CDOT P40DC's

Post by ConstanceR46 »

if anyone's interested in specout it begins at pg.66
china does trains better
nationalize the class 1s

jdb
Posts: 18
Joined: Wed Nov 25, 2015 10:51 am

Re: Amtrak to overhaul 12 CDOT P40DC's

Post by jdb »

First 5 P40's sent out for rebuild.

Here is a link to Wide World of Trains video.
https://www.youtube.com/watch?v=5P_V4AtYD1k&t=32s" onclick="window.open(this.href);return false;