 #866453  by bingdude
 
Saw crews cutting in a switch on the west side of the Hudson Line just north of University Heights. It isn't connected to anything yet. Is this a new team track or is a customer (the cement company) going to use it?
 #866780  by BobLI
 
Is that the area with a few abandoned tracks almost buried in the dirt?
 #866787  by DutchRailnut
 
Area is the n ew tracks (two years??) at location of old salt pile, oposite switch for BN yard.
 #866980  by Otto Vondrak
 
Butler Lumber is out, but there is talk about salt traffic.

Technically, a "team track" is a freight siding assigned to no customer, a public siding that anyone can pull up to and transload freight (so called from the days when teams of horses pulled wagons). If this siding has a specific purpose or customer, then it would be called a customer siding... or something...
 #867000  by Travelsonic
 
BobLI wrote:Is that the area with a few abandoned tracks almost buried in the dirt?
You mean the area with the NY Central Putnam Division remains/track?
 #867001  by DutchRailnut
 
nope other side , track 4 side
 #867717  by bingdude
 
As of Yesterday Am it's just a switch with a derail that ends. Since its next to a road and there are no buildings near, it could be either a team track or a customer siding. It looks like it might eventually be cut into the old sidings on that property, but right now there is a telephone pole that might need to be moved on the river side.

Maybe this is another siding to off-load debris from the East Side Access excavation?
 #891819  by Railfan-2
 
This switch does not serve the East Side Access (ESA) project. All ESA activity is in BN Yard on the east side of the mainline.
 #891913  by ajp
 
off topic but did i notice a caboose in the BN yard. I saw a cupola as i was driving down the Deegan.
 #899210  by MNR's #1 Conductor
 
I was under the understanding that that new siding is going to be used for rock salt deliveries for DOT/Sanitation usage. Last time I was up that way on the Hudson, the track was just completed, but nothing on the site otherwise.
 #899453  by freightguy
 
That's interesting alot of NYC salt used to make it's way to LIRR team yard where the Arch St Shop now stands. In Yard A there was even a track in the yard known as the Salt Lead. This business dried up in the early to mid 90's. I remember one the freight marketing managers saying how tough it was to get a permit for that stuff to store. Probably would of been some business if the switch was ready to go for this winter.
 #899729  by MNR's #1 Conductor
 
freightguy wrote:That's interesting alot of NYC salt used to make it's way to LIRR team yard where the Arch St Shop now stands. In Yard A there was even a track in the yard known as the Salt Lead. This business dried up in the early to mid 90's. I remember one the freight marketing managers saying how tough it was to get a permit for that stuff to store. Probably would of been some business if the switch was ready to go for this winter.
I thought it would have been ready too. I mean the land is an empty lot, and the switch and spur seemed ready well before the winter started.
 #899888  by railmason357
 
Went by the other day and saw a bunch of vests and hardhats there. Few had CSX on them. I heard it was going to be for stone, not salt.