But my question is whether changing gauge would mean shutting down the entire network for conversion. If new rolling stock bought for the light rail were standard gauge, there would need to be dual gauge track wherever the new rolling stock shares tracks with the existing fleet. In fact, the section of tracks shared between two different routes would need to be dual gauge.
Also known as Myrtonos