 #1423555  by J.D. Lang
 
As Dutch has said there is nothing that is going to happen until you deal with HRRC. I'd be curious to know if the state has even approached them about a sale. I know that the state is broke put I wish they would get off of their study after study and go after purchasing the Maybrook & Berkshire lines from them. The state needs to put those lines under their belt because they are of strategic value for the passenger extension and to restore the Maybrook for G&W and as an alternate route for equipment moves for MN. The super 7 extension has helped a bit to get around Brookfield but rush hour is still a mess. This whole thing should be a priority because I think you would have good patronage from New Milford. Screw the electrification.
J.L.
 #1425607  by Jeff Smith
 
Bustitution: http://web.mta.info/mnr/pdf/DanburyBusing032017.pdf" onclick="window.open(this.href);return false;

Why service is being changed:
This is to support the grade crossing work at
this location: TOPSTONE
 #1427164  by Metzger
 
Jeff's post about the grade crossing work has gotten me thinking: to what extent would it be possible to grade-separate the Danbury Branch? How much time savings would they get if CDOT were able to do this? Does the curvy nature of the line make it pointless or would you see real gains?
 #1427181  by F-line to Dudley via Park
 
Geometry's a schedule limiter much more than grade crossings. And traffic levels on a branch will never be high enough that you'd need to grade separate here or New Caanan no matter how much car traffic sucks around the busiest crossings. (Waterbury has few crossings to begin with, and no bad ones).

For CDOT's money they need to get on with zapping another half-dozen Shoreline crossings in New London County pronto, and pluck off more Springfield Line ones between North Haven and Hartford to keep pace with high-speed train traffic that's going to increase at breakneck pace over next 2 decades. Those mainline ones do make a big difference on speeds, traffic management, and safety much moreso than the branches (stupid CT drivers be damned). Lots of SLE growth to be had Waterford-New London to make cutting Miner Ln. and the closing the small riverwalk parking lot crossing in NLN high priorities, leaving only the two downtown ferry terminal un-eliminables (negligible concern because of the station stop and new ADA ped overpass). And they'll need to whack the one in Groton and 3 public crossings in Stonington (Latimer Point Rd., Wamphassuc Rd., Palmer St.) for the New London-Westerly extension, leaving only the 2 adjacent boat landing un-eliminables and brutal-difficulty Mystic Station as outliers. For Springfield Line they've got isolated public crossings in North Haven (Sackett Point Rd.), Wallingford (Toelles Rd.), West Hartford (Oakwood Ave.), and Hartford (Hamilton Ave.) to pick off, plus another 2-3 private industrial driveways that can be outright closed by re-snaking access away from the tracks. That tidy-up clears out all of HFD-NHV except for the megaproject-level downtown Wallingford and Meriden clusters that are too big to swallow for the medium future, plus a couple private driveway un-eliminables of least-concern.
 #1427182  by GirlOnTheTrain
 
The only time grade crossings operationally hamper the Danbury branch is when they have to constantly stop and warn with mass malfunctions like they were experiencing a few years ago because of poor drainage shorting out the components in the system or whatever the problem actually was. (Jaap can and will correct me as to what the actual problem was, I'm sure ;) )
 #1430670  by fredmcain
 
The proposal to re-electrify the Danbury Branch may have been pushed off into the "long-term" category but it is by no means dead. The latest news that I could find dates to a little over a week ago from April 30th here:

http://www.shorelinetimes.com/news/conn ... ff6b3.html" onclick="window.open(this.href);return false; You have to scroll WAY down to find it. Scroll down to "Success on the rails". I will copy and paste the pertinent part of it here:
Success on the rails

One of the state’s most highly touted transportation programs has been Metro-North, which has expanded service, adding 405 new M8 trains since 2011 at a cost of $1.1 billion, according to DOT spokesman Judd Everhart. Connecticut’s share was $745.9 million; New York state paid $359.82 million. Sixty more M8s, costing $232.3 million, will start going into service in September 2019, Everhart said, and the state has an option for 34 more.

Redeker said on-time performance this year has hit 96 percent, with 500,000 miles between repairs. Connecticut has also built “a state-of-the-art maintenance facility built for these cars” in the New Haven rail yard, Redeker said.

“The state can certainly do more,” Cutrufo said. “Governor Malloy has talked about turning the New Haven Line into a quasi-rapid transit service, having two express tracks and two local tracks, and that’s a way to run trains more frequently, provide better service.”

Besides reducing traffic jams, investment in trains and buses suits the needs of younger professionals who prefer to live in cities and get around without a car, said Cohen of ConnPIRG. She called Metro-North “one of the most successful commuter rail lines in the country” but said its weak link is the branch lines, especially the Danbury branch, which is still running on diesel fuel.

“A 2013 study estimated that the electrification of the Danbury branch line and expansion of service would reduce trip times by 19 percent and it would increase ridership by 46 percent by 2030,” Cohen said.

Redeker said “Let’s Go CT!” includes “electrifying the Danbury branch. Way out in the future it could provide a direct connection to New York,” eliminating the need to transfer in South Norwalk.

Another long-term goal is expanding Shore Line East, which runs east of New Haven, into Rhode Island, he said.

Meanwhile, the Hartford Line, between New Haven and Springfield, Massachusetts, is “still running on schedule and within budget for opening next year,” Redeker said. “This spring should be the big push on the Hartford Line.”
You'll also notice that there are long-term plans to completely restore the NYNH&H's four-track mainline. Unlike some other people on our list, I remain optimistic that these plans will eventually come to fruition. It's just that we might not live to see them. :(

Regards,
Fred M. Cain
 #1431056  by Patrick A.
 
Fred, thanks for sharing the article. I am glad to see that there are some thoughtful ideas about increasing the reliability and usability of MNRR as a transit option, however the big issue will be how to fund all of the necessary infrastructure improvements which must be made.

The movable bridges as well as finishing up the constant tension centenary work are the key pieces for the mainline. Get those nagging issues out of the way and you can have a serious discussion about restoring the 4th track through Milford or having island platforms at key intermediate stations to allow for more express track usage by MNRR, or quite frankly extending all platforms to at least an 8 car length to shorten approach and dwell times.

Hopefully the Hartford line Phase 1 is ready to go in January and has a successful 2018, which could provide some added momentum to continue the improvements across CT's railroads.
 #1431080  by fredmcain
 
Patrick,

You hit the nail on the head. They want to do these things, they really do but the issue is $. Donald Trump keeps talking about a *HUGE* "infrastructure" plan (and talking and talking and talking) but we *STILL* don't know what's going to be in it. Will there be funds for transit and inter-city rail? Possibly, but if so, how much? I e-mailed the lady (Gail Lavielle) who has been really pushing the Danbury re-electrification project and asked her about a possible Trump infusion of funds. Could federal funding for Danbury be included somehow? She did not respond. Probably she simply does not have time to respond to people from outside her district which would include me since I live in Indiana.

Regards,
 #1470985  by Jeff Smith
 
<cough> dust <cough>

https://www.newstimes.com/local/article ... 876201.php" onclick="window.open(this.href);return false;

The relevant portion? A connection between Danbury and the Harlem Line. It was part of the original study going back, what, 30 something years? We all know the obstacles, of course. Reverse moves, removal of a connection at IGA in Brewster, and so on. I'm curious as to why they think Housy "iced" this out, when it was Housy who was pushing their own service?
City officials have had preliminary discussions with HARTransit, Metro-North, the state and Eversource about the proposal and will develop next steps in the coming months, Calitro said.

In the meantime, city officials are pitching to the groups the possibility of extending Metro-North service from Danbury to the Harlem Line, just across the New York State border.

The idea had long been iced out by the Housatonic Railroad Co., which owns the tracks in that direction, but a thaw could be on the way, Calitro said.

The new route could cut 40 minutes off the commute to New York City and Danbury. Officials said they assume there is ridership demand for the service. They hope to quantify that in a rider study of the two train lines this summer before officially completing the transit-oriented development study.
Cut off 40m? Probably not on that track; by the time you cross over, you're losing any time gained over the branch to GCT. I think it would be more useful in getting traffic off 84/684 the Saw Mill and Bronx River, as perhaps White Plains and Purchase (Pepsico) might be destinations.

Hat tip: Dutch for posting the link in his group.
 #1471038  by Train322
 
What would the cost be for:

1) Add a second lane to the 684 to 84 east ramp and a third lane to the CT state line from 684 on Rt 84
or...

2) Upgrade with a sharp U turn the east west line, for diesel service from Southeast? For appropriate class for passenger (Class IV or III?) -
a) Add a second track as needed for hourly head-ways and more frequent peak.
Also-extend to the east end of Danbury.
b) Have Connecticut permit third rail and add third rail (with appropriate fence)
c) Add new rail station at Danbury Fair.
d) Operating cost.
e) Equipment cost/insurance.

thanks
 #1471042  by DutchRailnut
 
non of what you fantasize about is in the proposal .
 #1471063  by Backshophoss
 
What was CP Fairgrounds passing siding on the Maybrook is now a SWAMP,and may have become "protected wetlands" since the HRRC takeover,
and has been allowed to rot in place,there will some NMBY's that will fight any reactivation of that part of the Maybrook line. :( :( :(
 #1471102  by Jeff Smith
 
Yup; AFAIK, HRRC has left west of Danbury to rot since there's no online business. The only time it's been used in recent memory was the Danbury washout move. I think there was some talk about a new customer around Chuck's Steakhouse (is that still there?) in the area of Route 7.

The original study included most of this, if not all, including an extension to Newtown. None of it showed promise. And nothing will happen until broke CT can find the money to purchase the remaining ROW from Danbury west to state line, and north to New Milford, the most logical extension, since that's the last stretch of the Berkshire that's HRRC owned.
 #1471226  by Train322
 
Just saying - wouldn't widening a lane on 84 and having express bus service be cheaper than resurrecting a rail line?

The problem is money. I thought that the US would invest in infrastructure.
The lane widening would actually need to be in NY state.
 #1471294  by NaugyRR
 
Jeff Smith wrote:Yup; AFAIK, HRRC has left west of Danbury to rot since there's no online business. The only time it's been used in recent memory was the Danbury washout move. I think there was some talk about a new customer around Chuck's Steakhouse (is that still there?) in the area of Route 7.

The original study included most of this, if not all, including an extension to Newtown. None of it showed promise. And nothing will happen until broke CT can find the money to purchase the remaining ROW from Danbury west to state line, and north to New Milford, the most logical extension, since that's the last stretch of the Berkshire that's HRRC owned.
Chuck's is still there, Jeff
http://www.chucksdanbury.com/
I haven't been in a few years, but the food's always been pretty good.

Personally I would like to see the DRM get access to the trackage out behind the mall. I think short excursions would do wonders for them, and maybe working with the mall to provide shuttle trains from the center of town.