Dwell times are not the only reason to electrify. The post you reply to mentions another reason - reliability. DMs are more failure prone by design because they need to have both a diesel and an electric, and the fleet is smaller so it is harder to handle failure.

MattW
Posts: 594
Joined: Thu May 13, 2010 8:00 pm
Location: Atlanta, GA (ATL)

Re: Metro-North Hudson Line Electrification

Post by MattW »

andrewjw wrote:
Thu Aug 22, 2019 4:56 pm
Dwell times are not the only reason to electrify. The post you reply to mentions another reason - reliability. DMs are more failure prone by design because they need to have both a diesel and an electric, and the fleet is smaller so it is harder to handle failure.
Plus environmental concerns, noise and exhaust.

DutchRailnut
Posts: 22425
Joined: Thu Mar 11, 2004 8:02 pm
Location: released from Stalag 13

Re: Metro-North Hudson Line Electrification

Post by DutchRailnut »

Betya commercial power might be more polluting than newer generation diesels.
natives are really not looking favorable at sight pollution with poles and wires and 12,5 KV hanging within 18 feet of ground .
If Conductors are in charge, why are they promoted to be Engineer???

Retired Triebfahrzeugführer. I am not a moderator.

nkloudon
Posts: 22
Joined: Sat Jul 13, 2019 3:54 pm

Re: Metro-North Hudson Line Electrification

Post by nkloudon »

>>A lot of substations admittedly, but less of an issue with NIMBYs objecting to wires.

I would think the NIMBY's would be more opposed to third rail. After all, there is the danger of electrocution to children playing on the tracks!

Backshophoss
Posts: 6636
Joined: Mon Mar 05, 2012 7:58 pm

Re: Metro-North Hudson Line Electrification

Post by Backshophoss »

3rd rail beyond Croton North,forgetaboutit!!! Not worth the $$$$$$$$ to install.
The Harlem line to B north was hard enough to pull off.
The Land of Enchantment is not Flyover country!

User avatar
Rockingham Racer
Posts: 3696
Joined: Wed Mar 17, 2004 9:25 pm

Re: Metro-North Hudson Line Electrification

Post by Rockingham Racer »

Tom, I remember the EP-5s [the Jets] rolling by JO tower in Woodlawn in the late 60's. I believe only a few rush hour trains were run throughs. The rest of the day people changed at South Norwalk, IIRC.

Riverduckexpress
Posts: 59
Joined: Fri Jan 23, 2015 2:28 pm
Location: Brooklyn

Re: Metro-North Hudson Line Electrification

Post by Riverduckexpress »

The MTA's newest capital program includes a proposal to re-electrify some or all of the currently un-electrified segments of track 1 (the northbound express track) between Hastings-on-Hudson and Croton-Harmon. https://new.mta.info/sites/default/file ... Report.pdf Details on pages 29 and 128 of the PDF (which are listed as pages 27 and 126 by the document itself). Amazing how much time, effort and money transit agencies spend or consider spending just to restore infrastructure removed in decades past.

DutchRailnut
Posts: 22425
Joined: Thu Mar 11, 2004 8:02 pm
Location: released from Stalag 13

Re: Metro-North Hudson Line Electrification

Post by DutchRailnut »

guaranteed the cost to restore is less than the 30 years maintenance they saved.
If Conductors are in charge, why are they promoted to be Engineer???

Retired Triebfahrzeugführer. I am not a moderator.

njt/mnrrbuff
Posts: 3660
Joined: Thu Sep 30, 2004 9:33 pm

Re: Metro-North Hudson Line Electrification

Post by njt/mnrrbuff »

It would be great if all four tracks from Croton Harmon Station to CP13 had third rail. It would help provide flexibility, especially for the Croton-Harmon super expresses being able to go around another local train.

User avatar
Rockingham Racer
Posts: 3696
Joined: Wed Mar 17, 2004 9:25 pm

Re: Metro-North Hudson Line Electrification

Post by Rockingham Racer »

What's a "Croton Harmon super express"?

njt/mnrrbuff
Posts: 3660
Joined: Thu Sep 30, 2004 9:33 pm

Re: Metro-North Hudson Line Electrification

Post by njt/mnrrbuff »

These trains often run express from 125th Street to Tarrytown. They run during the week and during the rush hours-heading south in the am and north in the pm.

ExCon90
Posts: 4615
Joined: Thu Sep 18, 2008 1:22 pm

Re: Metro-North Hudson Line Electrification

Post by ExCon90 »

DutchRailnut wrote:
Sat Sep 21, 2019 4:19 pm
guaranteed the cost to restore is less than the 30 years maintenance they saved.
Absolutely. On the PRR the rule of thumb was that if a track was expected to be out of service for more than one year it was cheaper to tear it up and then put it back later if necessary.

Jeff Smith
Site Admin
Posts: 8696
Joined: Tue Nov 07, 2006 9:28 am
Location: If it's Tuesday, It Must Be Belgium

Re: Metro-North Hudson Line Electrification

Post by Jeff Smith »

Same deal as the Tracks You Want Back thread except here is where we can discuss Hudson electrification, and I'm guilty of it as well, let's leave Danbury out of it.
Next stop, Willoughby
~el Jefe ("Jeff Smith Rules") :: RAILROAD.NET Site Administrator/Co-Owner

NHRRJOHN
Posts: 3
Joined: Tue Nov 05, 2019 10:57 pm

Re: Metro-North Hudson Line Electrification

Post by NHRRJOHN »

Before thinking of going to overhead electrification, you need to check the clearances on the bridges, etc. along the Hudson Line. The amount of clearance required is actually very significant.

User avatar
Rockingham Racer
Posts: 3696
Joined: Wed Mar 17, 2004 9:25 pm

Re: Metro-North Hudson Line Electrification

Post by Rockingham Racer »

There's a tunnel or two to be concerned about as well.