Original NH Catenary Replacement Progress

Discussion relating to the operations of MTA MetroNorth Railroad including west of Hudson operations and discussion of CtDOT sponsored rail operations such as Shore Line East and the Springfield to New Haven Hartford Line

Moderators: GirlOnTheTrain, nomis, Jeff Smith, FL9AC

fl9m2004
Posts: 1301
Joined: Thu Apr 11, 2013 10:52 am

Re: Catenary (Wire) Project Next Phase Fairfield to Bridgepo

Post by fl9m2004 » Fri Apr 12, 2013 4:39 pm

Are they still working on track 3 from Cp248-255

runningwithscalpels
Posts: 705
Joined: Thu Feb 23, 2012 6:01 pm
Location: Waterbury Branch MP 22.0

Re: Catenary (Wire) Project Next Phase Fairfield to Bridgepo

Post by runningwithscalpels » Fri Apr 12, 2013 11:53 pm

fl9m2004 wrote:Are they still working on track 3 from Cp248-255
Yes - I was just at Fairfield Metro today.
Change at Bridgeport for service to Derby-Shelton, Ansonia, Seymour, Beacon Falls, Naugatuck and Waterbury

fl9m2004
Posts: 1301
Joined: Thu Apr 11, 2013 10:52 am

Re: Catenary (Wire) Project Next Phase Fairfield to Bridgepo

Post by fl9m2004 » Sat Apr 13, 2013 11:11 pm

They where still there this morning and afternoon
Wonder what's going on with Devon bridge track 4
All eastbound traffic is on one while westbound is 3-2

runningwithscalpels
Posts: 705
Joined: Thu Feb 23, 2012 6:01 pm
Location: Waterbury Branch MP 22.0

Re: Catenary (Wire) Project Next Phase Fairfield to Bridgepo

Post by runningwithscalpels » Sat Apr 13, 2013 11:27 pm

It's an extended thing - not going to be done in a week. The temporary platforms were there last summer though not in use.
Change at Bridgeport for service to Derby-Shelton, Ansonia, Seymour, Beacon Falls, Naugatuck and Waterbury

fl9m2004
Posts: 1301
Joined: Thu Apr 11, 2013 10:52 am

Re: Catenary (Wire) Project Next Phase Fairfield to Bridgepo

Post by fl9m2004 » Sat Apr 13, 2013 11:40 pm

Okay thanks
Is Milford track 4 platform getting a new track 4 wired?
Same thing happened except engineer over ran temporary platforms
Had to reverse

twropr
Posts: 687
Joined: Tue Dec 29, 2009 6:26 pm

Re: Catenary (Wire) Project Next Phase Fairfield to Bridgepo

Post by twropr » Wed Apr 17, 2013 5:46 am

Understand there was some kind of a wire problem on Fri. the 12th near CP 241. Delays were very slight considering there was single TK CP 241-248 and the single tracking lasted only about 1.5 hrs. Was there a wire train right there that had been working on TK 1 to go over and fix the problem on tracks 2 and 4?

Andy

fl9m2004
Posts: 1301
Joined: Thu Apr 11, 2013 10:52 am

Re: Catenary (Wire) Project Next Phase Fairfield to Bridgepo

Post by fl9m2004 » Wed Apr 17, 2013 6:59 am

That's really strange
Because on my scanner
I heard district f talking to
Eastbound trains

DutchRailnut
Posts: 22257
Joined: Thu Mar 11, 2004 8:02 pm
Location: released from Stalag 13

Re: Catenary (Wire) Project Next Phase Fairfield to Bridgepo

Post by DutchRailnut » Wed Apr 17, 2013 11:09 am

how convenient as tracks 2 and 4 are generaly the eastbound tracks.
If Conductors are in charge, why are they promoted to be Engineer???

Retired Triebfahrzeugführer. I am not a moderator.

fl9m2004
Posts: 1301
Joined: Thu Apr 11, 2013 10:52 am

Re: Catenary (Wire) Project Next Phase Fairfield to Bridgepo

Post by fl9m2004 » Thu Apr 18, 2013 8:41 pm

That's true about 2-4 being eastbound tracks
Was on an Amtrak Sunday
We used 2 from Cp235-255

ThirdRail7
Posts: 4090
Joined: Sat Oct 01, 2011 7:07 pm

Re: Catenary (Wire) Project Next Phase Fairfield to Bridgepo

Post by ThirdRail7 » Sat Apr 20, 2013 12:16 am

fl9m2004 wrote:That's true about 2-4 being eastbound tracks
Was on an Amtrak Sunday
We used 2 from Cp235-255
Shows how much I know. I didn't know 2 track had anything to do with CP 235. :)
I want my road foreman!

fl9m2004
Posts: 1301
Joined: Thu Apr 11, 2013 10:52 am

Re: Catenary (Wire) Project Next Phase Fairfield to Bridgepo

Post by fl9m2004 » Sat Apr 20, 2013 7:50 am

Meant from 241-255
As we had to follow 6514

Jeff Smith
Site Admin
Posts: 8512
Joined: Tue Nov 07, 2006 9:28 am
Location: MP 67.2 Georgia Southern Railway

Re: Catenary (Wire) Project Next Phase Fairfield to Bridgepo

Post by Jeff Smith » Sat Jun 01, 2013 5:42 pm

cleanup aisle 67 thread hijack in progress. this is the train to the thread on the catenary. if you're going to Fordham, transfer at Stamford, Greenwich, and Harrison.
Next stop, Willoughby
~Jeff Smith (fka "Sarge") :: RAILROAD.NET Site Administrator/Co-Owner

lirr42
Posts: 2726
Joined: Thu Dec 29, 2011 6:16 pm
Location: Montauk, NY (MP 115.8)

Re: Catenary (Wire) Project Next Phase Fairfield to Bridgepo

Post by lirr42 » Sat Jun 01, 2013 8:11 pm

Jeff Smith wrote:if you're going to Fordham, transfer at Stamford, Greenwich, and Harrison.
if I'm going to Fordham I have to transfer at Stamford, Greenwich, and Harrison! That's three transfers. Who's the brightloght that came up with that? :wink:

NH2060
Posts: 1518
Joined: Thu Feb 25, 2010 4:44 pm

Re: Catenary (Wire) Project Next Phase Fairfield to Bridgepo

Post by NH2060 » Sun Sep 15, 2013 2:15 pm

Work to start next year on replacing the South Norwalk-Greens Farms and East Bridgeport-Stratford wires. Only one track will be out at a time for this phase of the project.
http://www.westport-news.com/news/artic ... 814405.php" onclick="window.open(this.href);return false;
Perhaps we should start separate threads for each sections when the time comes?

fl9m2004
Posts: 1301
Joined: Thu Apr 11, 2013 10:52 am

Re: Catenary (Wire) Project Next Phase Fairfield to Bridgepo

Post by fl9m2004 » Sat Dec 07, 2013 10:21 pm

Any updates on the wire project between Fairfield and Bridgeport
Saw catenary maintance trucks Sunday early pm time on track 3 near where the derailment happened