PTC Project 2017 - 2018 Positive Train Control homestretch

Post by Arlington »

This seems worth its own thread (sorry if duplicative: I could not find one with PTC or Positive in its thread title): The T has published a weekend shutdown schedule for pretty much the entire PTC rollout:

Commuter Rail Positive Train Control (PTC) Program
2017 Weekend train service is projected to be suspended for:
  • The Newburyport/Rockport Line starting the weekend of July 8, 2017 through the weekend of September 30, 2017.
  • The Lowell Line starting the weekend of August 5, 2017 through the weekend of September 30, 2017.
  • The Needham Line starting the weekend of September 23, 2017 through the weekend of November 25, 2017.
  • The Haverhill Line starting the weekend of September 23, 2017 through the weekend of December 2, 2017.
  • The Fairmount Line starting the weekend of November 18, 2017 through the weekend of December 23, 2017.
  • 2018 PTC weekend shutdowns will be finalized by late 2017/early 2018 in order to start back up in Spring of 2018, and will impact the
    • Franklin,
    • Fitchburg, and
    • Worcester Commuter Rail lines.
  • No weekend shutdowns are required on the Greenbush, Middleborough, Providence/Stoughton, and Kingston/Plymouth Commuter Rail lines.
[bolds and some formatting mine]

By finishing the work in Spring/Summer of 2018, they've done a nice job of meeting the December 31, 2018 federal deadline.
"Trying to solve congestion by making roadways wider is like trying to solve obesity by buying bigger pants."--Charles Marohn

johnpbarlow
Posts: 2164
Joined: Fri Mar 12, 2004 12:50 pm

Re: PTC Project 2017 - 2018 Positive Train Control homestret

Post by johnpbarlow »

Q: when each MBTA line's PTC gear installation work is complete after the weekend shutdowns, will PTC be immediately operational on each line? Or is there another date where all lines will be cut-in at one time once all lines' installations are completed in 2018? If the former, I'm guessing that a few PAR locomotives will need to be made PTC operational this year?

User avatar
StefanW
Posts: 545
Joined: Wed Aug 18, 2004 8:27 pm
Location: Lynn, MA / MP 11.53

Re: PTC Project 2017 - 2018 Positive Train Control homestret

Post by StefanW »

From reading the most recent presentation to the FMCB, it sounds to me like only Lowell and Stoughton are going to be online by the end of 2018.

See pages 2 and 6:
http://www.mbta.com/uploadedfiles/About_the_T/Board_Meetings/PTC%20Update%206-26-17%20FOR%20POSTING.pdf

Everything else is going to be online in 2019 and 2020.
The Blue Line is good for Lynn, and Lynn is good for the Blue Line.

My live MBTA real-time mapping apps:
https://sites.harvard.edu/~wuensch/T/subway-map.html
https://sites.harvard.edu/~wuensch/T/commuter-rail-map.html

RenegadeMonster
Posts: 590
Joined: Tue Mar 07, 2017 9:19 am

Re: PTC Project 2017 - 2018 Positive Train Control homestret

Post by RenegadeMonster »

If this is true I'm guessing it's because of all the PAR engines that need to be upgraded as well?

User avatar
BostonUrbEx
Posts: 3838
Joined: Thu Dec 03, 2009 9:55 pm
Location: Winn to MPT 8, Boston to MPN 38, and Hat to Bank

Re: PTC Project 2017 - 2018 Positive Train Control homestret

Post by BostonUrbEx »

No, it is because they need to have one new, working demonstration on both North and South sides by the deadline. PAR operates on the Lowell Line, so they'd definitely need to have some compliant equipment by then.

sery2831
Posts: 5138
Joined: Fri Mar 12, 2004 2:15 pm
Location: Manchester, NH

Re: PTC Project 2017 - 2018 Positive Train Control homestret

Post by sery2831 »

RenegadeMonster wrote:If this is true I'm guessing it's because of all the PAR engines that need to be upgraded as well?
There is an agreement for a limited amount of PAR locos to get the PTC set up, not all of them.
Moderator: Massachusetts Bay Transportation Authority

octr202
Posts: 4160
Joined: Fri Mar 12, 2004 8:13 am
Location: In the land of the once and future 73 trackless trolley.

Re: PTC Project 2017 - 2018 Positive Train Control homestret

Post by octr202 »

T Alerts are announcing that weekend busing on the Eastern Route will go through August 27th, so looks like the PTC weekend closures will end about a month earlier than originally expected.

T Press Release - work will start on Needham Branch first weekend in September:

http://www.mbta.com/about_the_mbta/news ... 6442458458" onclick="window.open(this.href);return false;
Wondering if I'll see the Haverhill double-tracking finished before I retire...
Photo: Melbourne W7 No. 1019 on Route 78, Bridge & Church Streets, Richmond, Victoria. 10/21/2010

chrisf
Posts: 369
Joined: Sat Apr 24, 2004 9:35 pm

Re: PTC Project 2017 - 2018 Positive Train Control homestret

Post by chrisf »

As with Newburyport/Rockport, the PTC install on the Needham Line is wrapping up a month early, with Saturday service resuming on October 28.
https://www.mbta.com/news/3057" onclick="window.open(this.href);return false;

User avatar
BostonUrbEx
Posts: 3838
Joined: Thu Dec 03, 2009 9:55 pm
Location: Winn to MPT 8, Boston to MPN 38, and Hat to Bank

Re: PTC Project 2017 - 2018 Positive Train Control homestret

Post by BostonUrbEx »

Does anyone know if the PTC transponders mounted to the ties will present a problem for the flanger? Or do they have a low profile that wouldn't impact flanging? I haven't taken a close look at one, so I'm not sure. I also haven't noticed if they put up those warning markers which indicate raising the flanger blade.

MBTA3247
Posts: 2750
Joined: Tue Jul 11, 2006 6:01 pm
Location: Milton

Re: PTC Project 2017 - 2018 Positive Train Control homestret

Post by MBTA3247 »

From the photos posted in one of the Needham Line threads a few months ago, it looks like the transponders are sufficiently low-profile to not impact the flangers, which only go an inch or 2 below the railhead. Worst case scenario, they have to install warning signs on either side of the transponders like they do with switches and grade crossings.
"The destination of this train is [BEEP BEEP]" -announcement on an Ashmont train.

harshaw
Posts: 133
Joined: Thu Jan 02, 2014 4:17 pm

Re: PTC Project 2017 - 2018 Positive Train Control homestret

Post by harshaw »

It looks like some of the PTC work being done involved on the worcester line involves putting up wood poles at various places. It looks a bit.... dated

RenegadeMonster
Posts: 590
Joined: Tue Mar 07, 2017 9:19 am

Re: PTC Project 2017 - 2018 Positive Train Control homestret

Post by RenegadeMonster »

I think they added the wood poles on pretty much every line.

I would assume because it's cheaper and faster than burying it?

Arlington
Posts: 4156
Joined: Wed Jun 02, 2004 7:51 am
Location: Medford MA (was Arlington MA and Arlington VA)

Re: PTC Project 2017 - 2018 Positive Train Control homestret

Post by Arlington »

I believe PTC works by GPS and Radio, both of which like the height
"Trying to solve congestion by making roadways wider is like trying to solve obesity by buying bigger pants."--Charles Marohn

dieciduej
Posts: 618
Joined: Tue May 09, 2006 9:37 am

Re: PTC Project 2017 - 2018 Positive Train Control homestret

Post by dieciduej »

RenegadeMonster wrote:I think they added the wood poles on pretty much every line.

I would assume because it's cheaper and faster than burying it?
They have put up metal ones at Reading Jct (MP 1.8) and CP Foley St. (MP 2.2). One other thing I noticed is they seem to be hinged so they can be rotated from vertical to horizontal for maintenance.

JoeD
JoeD

Member of IEEE, BSRA, ERA, BERA, SPH&TS, SFRH&MS, RGM&HS, UPHS, NHRHTA, NE PRRT&HS and PRRT&HS

This message was sent from a DEC VT100!

harshaw
Posts: 133
Joined: Thu Jan 02, 2014 4:17 pm

Re: PTC Project 2017 - 2018 Positive Train Control homestret

Post by harshaw »

Well, by having these poles & wires above ground these will be the first things that fail when we have trees fall on the right of way. And after last year, we can guarantee that will happen.