M9 and M9A Procurement & Acceptance

Discussion of the past and present operations of the Long Island Rail Road.

Moderator: Liquidcamphor

hrfcarl
Posts: 524
Joined: Tue Jun 26, 2007 9:35 pm

Re: LIRR M9 Procurement Information

Post by hrfcarl » Fri Sep 20, 2013 9:19 pm

DutchRailnut wrote:No they are coupled between two pair as in A car- B car -single car - A car - B car so they need Automatic couplers.
I did not read your other post carefully - Not between a pair of M-8s but "The cars will couple between two pair of M-8's"...doh

So if they have automatic couplers, will they have shoes for their own power needs (HVAC & lights)?

lirr42
Posts: 2726
Joined: Thu Dec 29, 2011 6:16 pm
Location: Montauk, NY (MP 115.8)

Re: LIRR M9 Procurement Information

Post by lirr42 » Fri Sep 20, 2013 9:48 pm

hrfcarl wrote:So if they have automatic couplers, will they have shoes for their own power needs (HVAC & lights)?
I believe they will. I image the other M8's would not be able to provide power for both their needs and the single, and I think there is some sort of FRA rule that does not allow power to be passed between cars except in the case of permanently married pairs.

DutchRailnut
Posts: 22266
Joined: Thu Mar 11, 2004 8:02 pm
Location: released from Stalag 13

Re: LIRR M9 Procurement Information

Post by DutchRailnut » Fri Sep 20, 2013 9:53 pm

yes each single will have a Pantograh and third rail shoes for lights and HVAC.
The Automatic couplers only connect control circuits and battery at either 32 or 64 volts
If Conductors are in charge, why are they promoted to be Engineer???

Retired Triebfahrzeugführer. I am not a moderator.

F-line to Dudley via Park
Posts: 7355
Joined: Fri Mar 11, 2005 7:26 pm
Location: North Cambridge

Re: LIRR M9 Procurement Information

Post by F-line to Dudley via Park » Sat Sep 21, 2013 11:55 am

DutchRailnut wrote:yes each single will have a Pantograh and third rail shoes for lights and HVAC.
The Automatic couplers only connect control circuits and battery at either 32 or 64 volts
If the singlets are taking their power straight off the wire/3rd rail, what do they need in terms of a transformer setup vs. a married pair? Do they have to lug around electrical equipment similar in heft to what the powered pairs do?


If that were the case it would best explain why the price difference between powered vs. unpowered is so meager.

DutchRailnut
Posts: 22266
Joined: Thu Mar 11, 2004 8:02 pm
Location: released from Stalag 13

Re: LIRR M9 Procurement Information

Post by DutchRailnut » Sat Sep 21, 2013 12:02 pm

they need a smaller transformer , a transfer group, and inverter to produce AC of third rail for lights and HVAC, they need batteries for emergency lighting and charger.
the huge price for this is, the design of only 25 cars
If Conductors are in charge, why are they promoted to be Engineer???

Retired Triebfahrzeugführer. I am not a moderator.

truck6018
Posts: 966
Joined: Sat Jul 26, 2008 1:31 pm

Re: LIRR M9 Procurement Information

Post by truck6018 » Mon Sep 23, 2013 1:16 pm

DutchRailnut wrote:The 25 single car's ordered in the M-8 order will NOT be spliced in a pair and form triplets.
The cars will couple between two pair of M-8's and form a 5 car set.
and correct those cars have no cabs, no propulsion, no dynamic brake, no toilet, just seats HVAC and lights
What's you opinion on how well the singles will play with the other cars as there is no propulsion or dynamic braking?

Head-end View
Posts: 2659
Joined: Thu Mar 11, 2004 10:00 pm
Location: The second row on a SEPTA Silverliner V

Re: LIRR M9 Procurement Information

Post by Head-end View » Mon Sep 23, 2013 6:11 pm

I can't believe in this day and age they're going to buy UNpowered trailers. Won't that cause the train to be underpowered with predictable loss in acceleration and top speed?

inthebag
Posts: 147
Joined: Thu May 02, 2013 8:50 am

Re: LIRR M9 Procurement Information

Post by inthebag » Mon Sep 23, 2013 10:56 pm

They always need to make the multi-million dollar mistake before they can rule it out for the future.

ACeInTheHole
Posts: 2786
Joined: Fri May 07, 2010 10:31 pm

Re: LIRR M9 Procurement Information

Post by ACeInTheHole » Thu Sep 26, 2013 12:45 pm

If you have a car with blended brakes and a car without in the same set wont that make a mess of the train handling when it comes time to stop the train?
Last edited by ACeInTheHole on Thu Sep 26, 2013 12:49 pm, edited 1 time in total.

DutchRailnut
Posts: 22266
Joined: Thu Mar 11, 2004 8:02 pm
Location: released from Stalag 13

Re: LIRR M9 Procurement Information

Post by DutchRailnut » Thu Sep 26, 2013 12:47 pm

no Amtrak does it all time
If Conductors are in charge, why are they promoted to be Engineer???

Retired Triebfahrzeugführer. I am not a moderator.

BuddCar711
Posts: 416
Joined: Sun May 01, 2011 12:13 pm

Re: LIRR M9 Procurement Information

Post by BuddCar711 » Thu Sep 26, 2013 7:08 pm

beanbag wrote:If you have a car with blended brakes and a car without in the same set wont that make a mess of the train handling when it comes time to stop the train?
SEPTA did it all the time with the Silverliner II/III (no dynamics) and IV (has dynamics). It did take a little longer to stop, but still better than a loco-hauled train.

EM2000
Posts: 196
Joined: Mon Jun 06, 2011 8:43 pm

Re: LIRR M9 Procurement Information

Post by EM2000 » Fri Sep 27, 2013 2:27 am

Of course train handling will be horrible, but who cares about that?

DutchRailnut
Posts: 22266
Joined: Thu Mar 11, 2004 8:02 pm
Location: released from Stalag 13

Re: LIRR M9 Procurement Information

Post by DutchRailnut » Fri Sep 27, 2013 3:56 am

no it won't, with or without the braking rate of each car or engine is about equal
If Conductors are in charge, why are they promoted to be Engineer???

Retired Triebfahrzeugführer. I am not a moderator.

EM2000
Posts: 196
Joined: Mon Jun 06, 2011 8:43 pm

Re: LIRR M9 Procurement Information

Post by EM2000 » Fri Sep 27, 2013 8:26 pm

Umm no. Whens the last time you ran an M7 with a pair on air and the rest of the consist in blend?

lirr42
Posts: 2726
Joined: Thu Dec 29, 2011 6:16 pm
Location: Montauk, NY (MP 115.8)

Re: LIRR M9 Procurement Information

Post by lirr42 » Fri Sep 27, 2013 8:42 pm

I listened to the most recent LIRR committee meeting in full for the first time in my life yesterday and it was quite comical at points It was funny to hear the board members talk about articulated trains and 14 car M7's. The video's on YouTube if you wanted to listen to it in full.