LIRR Mainline Third Track Project

Discussion of the past and present operations of the Long Island Rail Road.

Moderator: Liquidcamphor

LB
Posts: 486
Joined: Fri Sep 07, 2007 12:13 pm
Location: Callaway, MD

Re: LIRR Mainline Third Track Project

Post by LB »

Will the existing Passenger Station / Waiting Room building be demolished?

User avatar
MattAmity90
Posts: 905
Joined: Sat Apr 21, 2012 4:46 pm
Location: Easton, PA

Re: LIRR Mainline Third Track Project

Post by MattAmity90 »

It's been 10 days since New Hyde Park Road closed to traffic, and two weeks since a train went through it. As soon as the clock struck midnight, they got right on it. Already the concrete has been ripped out, signals ripped out, the road has been fenced off, and they have dug deep on the South side.
As for the station, all the mushroom light heads have been removed :( I WANT ONE! The platforms are now being demolished with the tracks receiving ballast. My guess is that the bridge will be constructed to the South in an eventual pit. Here's a snapshot taken on February 5th just two days after the road closed.
Screenshot (491).png
You do not have the required permissions to view the files attached to this post.
This station is Babylon, this is the train to Penn Station. Stopping at: Lindenhurst, Copiague, Amityville, Massapequa Park, Massapequa, Seaford, Wantagh, Bellmore, Merrick, Freeport, Baldwin, Rockville Centre, Lynbrook, Valley Stream, Jamaica, Kew Gardens, Forest Hills, Woodside, Penn Station.