Hoosac Tunnel Discussion & News

Guilford Rail System changed its name to Pan Am Railways in 2006. Discussion relating to the current operations of the Boston & Maine, the Maine Central, and the Springfield Terminal railroads (as well as the Delaware & Hudson while it was under Guilford control until 1988). Official site can be found here: PANAMRAILWAYS.COM.

Moderator: MEC407

J.D. Lang
Posts: 193
Joined: Fri May 30, 2014 7:55 am
Location: Between the Housy and Naugy

Re: Hoosac Tunnel Discussion & News

Post by J.D. Lang »

It must be incredibly difficult to work on repairing this. Hope they stay safe and can get it back open soon.
J. Lang

roberttosh
Posts: 1040
Joined: Wed Mar 16, 2005 7:21 pm

Re: Hoosac Tunnel Discussion & News

Post by roberttosh »

Probably easier said than done, but I wonder why they don’t use one of those corrugated metal culvert type things you see under roads. Much less likely to fail or crumble if it’s one piece and those things, while somewhat flimsy, are designed to withstand or divert a tremendous amount of weight, similar to the concept of how an eggshell has so much strength. Guessing it all comes down to designing and getting it through the tunnel as it would obviously be a tight squeeze.

GP40MC1118
Posts: 3701
Joined: Thu Mar 11, 2004 8:06 pm

Re: Hoosac Tunnel Discussion & News

Post by GP40MC1118 »

This is the company involved in the tunnel project:

https://lrlconstruction.com/

edbear
Posts: 504
Joined: Fri Mar 04, 2011 4:44 pm

Re: Hoosac Tunnel Discussion & News

Post by edbear »

The Hoosac Tunnel's weak spots have been lined with Armco Steel liner plate. There was a program in the early 1960s before there were any major collapses. Some more was installed after the collapse in 1973. Some might have been placed under the 4R program late 1970s.

CN9634
Posts: 2361
Joined: Fri Jul 09, 2004 5:50 pm

Re: Hoosac Tunnel Discussion & News

Post by CN9634 »

Backshophoss wrote:
Mon Feb 17, 2020 12:33 am
This is not going to be a quick fix,the underground stream needs to be rerouted away from the tunnel.
Seems to date back to when the tunnel was built.
Might be "cheaper" to Daylight the tunnel
Funny story, I heard today that might be the plan... not the whole thing but the impacted area.

J.D. Lang
Posts: 193
Joined: Fri May 30, 2014 7:55 am
Location: Between the Housy and Naugy

Re: Hoosac Tunnel Discussion & News

Post by J.D. Lang »

For those that may be interested here is a video that IMR films took from the back of the Amtrak Autumn Special back in 2015. It's shot in infrared red showing what the tunnel looks like inside on the trip thru.

https://www.youtube.com/watch?v=PFjZJet_9VQ

I find it interesting but to some it may be a bit (well you know what I mean). Anyway Thanks IMR for posting the video on you tube. It does look like t a lot of liner replacement over the years especially on the west end.
J. Lang

newpylong
Posts: 4352
Joined: Thu Jun 28, 2007 12:32 pm
Location: NH

Re: Hoosac Tunnel Discussion & News

Post by newpylong »

CN9634 wrote:
Tue Feb 18, 2020 9:43 pm
Backshophoss wrote:
Mon Feb 17, 2020 12:33 am
This is not going to be a quick fix,the underground stream needs to be rerouted away from the tunnel.
Seems to date back to when the tunnel was built.
Might be "cheaper" to Daylight the tunnel
Funny story, I heard today that might be the plan... not the whole thing but the impacted area.
I am not sure who started that rumor (there have been a number of people on Facebook agitating it) but it is 100% false - direct from the horse's mouth.

CN9634
Posts: 2361
Joined: Fri Jul 09, 2004 5:50 pm

Re: Hoosac Tunnel Discussion & News

Post by CN9634 »

I was told through a professionally means in person (IE from a non-railfan source at work) if that sheds light. I kind of wrote it off as a I guess we’ll see but it got published in ANR&P the day after which I thought was interesting.

Take that for what it’s worth too, but in reading the ANR&P post, which looks pretty thorough, I think it’s at the least a very possible/feasible option at this point and less of just a Railfan rumor. Kind of makes sense too— essentially that top 50’ swath for the first 1000’ is just a muddy sink hole and since more of it has collapsed, the top has also moved downward as well. A running trench at this point is just a matter of removing layers until you find the tracks. We’ll know in 2 months (which the timeline of a 2 month closure sounds feasible too for a project of that scope)
Last edited by MEC407 on Wed Feb 19, 2020 7:08 pm, edited 1 time in total.
Reason: unnecessary quoting

newpylong
Posts: 4352
Joined: Thu Jun 28, 2007 12:32 pm
Location: NH

Re: Hoosac Tunnel Discussion & News

Post by newpylong »

Their chief engineer said point blank it is not even being considered. This is a classic case where some Woodward and Bernstein hears a whisper or an offhanded comment and it becomes reality. I have my hunches who helped put the wind in the sails of this one.

I don't think people realize what the obstacles for "daylighting" would be. This is a type of project that would takes years to engineer and complete. You would have the Army Corps of Engineers involved, the EPA, likely local and state agencies will try to get their fingers in it. You would need to stage FAR more equipment than is currently working on site well ahead of time, methodically remove all of that earth without destroying the hillside, build some type of retaining wall, cast and build a new portal, move all of the track circuits, fiber optics, communications lines, and all of this done with poor site access. And that is oversimplifying it.

NRGeep
Posts: 1103
Joined: Tue Sep 28, 2004 9:33 pm

Re: Hoosac Tunnel Discussion & News

Post by NRGeep »

newpylong wrote:
Thu Feb 20, 2020 9:06 am
Their chief engineer said point blank it is not even being considered. This is a classic case where some Woodward and Bernstein hears a whisper or an offhanded comment and it becomes reality.

The only difference being Woodward and Bernstein were professional investigative journalists and luckily for them 'Deep Throat' wasn't the young Roger Stone; but Mark Felt, whose true whispers ultimately brought down Amtrak creator and Watergate cover up artist RMN's presidency. Flakebook rumors disguised as "news" is another can of worms...

newpylong
Posts: 4352
Joined: Thu Jun 28, 2007 12:32 pm
Location: NH

Re: Hoosac Tunnel Discussion & News

Post by newpylong »

Tunnel expected sometime next week to re-open.

CN9634
Posts: 2361
Joined: Fri Jul 09, 2004 5:50 pm

Re: Hoosac Tunnel Discussion & News

Post by CN9634 »

I'm confident you know who the source is for sure at IHP that perpetuated the daylighting idea. I logged onto AccessNS today and all it says is reopening on Saturday, so I guess we'll see what the update is tomorrow

GU1001
Posts: 55
Joined: Thu Feb 09, 2017 1:28 pm

Re: Hoosac Tunnel Discussion & News

Post by GU1001 »

Found some drone footage on YouTube of the current situation, credit IMR Films...
https://m.youtube.com/watch?v=mn7BeBUcLpA
To me this seems to reinforce the idea that this is a repair effort & not a daylighting.

jaymac
Posts: 3941
Joined: Wed Mar 04, 2009 1:08 pm

Re: Hoosac Tunnel Discussion & News

Post by jaymac »

Per a 1420/02-21-2020 viewing of the NS Service Alert, the tunnel will remain OOS until at least the end of the month.
"A gray crossover is not company transportation."

newpylong
Posts: 4352
Joined: Thu Jun 28, 2007 12:32 pm
Location: NH

Re: Hoosac Tunnel Discussion & News

Post by newpylong »

No surprise, they're saying a couple more weeks.