Re: Better NYC Access

 by Thomas ¦  Sat Jun 07, 2014 10:16 am ¦  Forum: General Discussion - Passenger Rail: High Speed and Heavy and Light Rail Systems ¦  Topic: Better NYC Access ¦  Replies: 10 ¦  Views: 3706

The NY subway system will never go interstate, simply not happening and impossible to fund.[/quote] I do not think that the Seven Extension to Secaucus is impossible to fund. You could prefer the 7 Extension on the grounds that it's better than nothing, and ARC was worth nothing from the beginning -...

Re: M-8 Cars

 by Thomas ¦  Sat Jun 07, 2014 10:12 am ¦  Forum: MTA Metro-North Railroad and CtRail Passenger Rail (SLE, Hartford, Extensions) ¦  Topic: M-8 Cars - Delivery and Acceptance ¦  Replies: 3101 ¦  Views: 527538

What is the height of the M-8 Car above the rails?

How high above the M-8 is the catenary?

Re: Amtrak Gateway Tunnels

 by Thomas ¦  Sat Jun 07, 2014 10:10 am ¦  Forum: New York City Area Wide Rail Transit Issues (Cross-Agency) ¦  Topic: Amtrak Gateway Tunnels ¦  Replies: 2328 ¦  Views: 526883

Yes, probably so. The extraction point for the TBM would be in the SE quadrant of 12th Ave and W. 30th Street, approximately 300 feet from the end of the concrete casing (don't call it a "tunnel box"). Then what would be the construction method in the 300 foot distance from the extraction...

Re: Better NYC Access

 by Thomas ¦  Fri Jun 06, 2014 12:15 pm ¦  Forum: General Discussion - Passenger Rail: High Speed and Heavy and Light Rail Systems ¦  Topic: Better NYC Access ¦  Replies: 10 ¦  Views: 3706

DutchRailnut wrote:neither one, as both are not happening.
Which makes Gateway more likely to occur...

Better NYC Access

 by Thomas ¦  Thu Jun 05, 2014 6:45 pm ¦  Forum: General Discussion - Passenger Rail: High Speed and Heavy and Light Rail Systems ¦  Topic: Better NYC Access ¦  Replies: 10 ¦  Views: 3706

Suppose we had to choose between ARC and Seven Extension to Secaucus, which of the two would be the best way to meet future travel needs?

Re: Amtrak Gateway Tunnels

 by Thomas ¦  Thu Jun 05, 2014 1:33 pm ¦  Forum: New York City Area Wide Rail Transit Issues (Cross-Agency) ¦  Topic: Amtrak Gateway Tunnels ¦  Replies: 2328 ¦  Views: 526883

Suppose that a TBM is necessary for part of the Manhattan segment. How shallow (close to street/surface level), can the TBM be used/bore? There is no blanket answer to that. It depends on lots of things - geology, soil (grain size distribution), the types of structures located on the ground surface...

Re: Amtrak Gateway Tunnels

 by Thomas ¦  Wed Jun 04, 2014 4:33 pm ¦  Forum: New York City Area Wide Rail Transit Issues (Cross-Agency) ¦  Topic: Amtrak Gateway Tunnels ¦  Replies: 2328 ¦  Views: 526883

jlr3266 wrote:Shallow TBM drives will not be an issue. They have to pass under the river and come up in a reasonable grade for the trains.
I was wondering about the segment under 12th Avenue and perhaps under 30th street in Manhattan.

Re: Amtrak Gateway Tunnels

 by Thomas ¦  Wed Jun 04, 2014 11:51 am ¦  Forum: New York City Area Wide Rail Transit Issues (Cross-Agency) ¦  Topic: Amtrak Gateway Tunnels ¦  Replies: 2328 ¦  Views: 526883

may sound dumb, but had any tbm construction been started for njt's cancelled tunnels? I mean it was cancelled when they were already working on building the overpass for 1&9 and work on the cliff face was probably a year out. I'd imagine a tbm takes several years to design and build so one sho...

Re: Amtrak Gateway Tunnels

 by Thomas ¦  Tue Jun 03, 2014 4:31 pm ¦  Forum: New York City Area Wide Rail Transit Issues (Cross-Agency) ¦  Topic: Amtrak Gateway Tunnels ¦  Replies: 2328 ¦  Views: 526883

Thus, one can infer that the Hudson tunnel's EIS and engineering should have begun recently... They haven't....... When will they begin, and how long will the study take to complete? Should start soon, I think. Its just a matter of the contracts being signed..... Will you be one of the people worki...

Re: Amtrak Gateway Tunnels

 by Thomas ¦  Mon Jun 02, 2014 5:35 pm ¦  Forum: New York City Area Wide Rail Transit Issues (Cross-Agency) ¦  Topic: Amtrak Gateway Tunnels ¦  Replies: 2328 ¦  Views: 526883

Don31 wrote:Should start soon, I think. Its just a matter of the contracts being signed.....
Cool. What is a realistic amount of time that the study can be completed?

Do you think that the Gateway Project can be completed by 2027/2028?

Re: Amtrak Gateway Tunnels

 by Thomas ¦  Mon Jun 02, 2014 3:33 pm ¦  Forum: New York City Area Wide Rail Transit Issues (Cross-Agency) ¦  Topic: Amtrak Gateway Tunnels ¦  Replies: 2328 ¦  Views: 526883

Don31 wrote:
Thomas wrote:
Thus, one can infer that the Hudson tunnel's EIS and engineering should have begun recently...
They haven't.......

When will they begin, and how long will the study take to complete?

Re: Amtrak Gateway Tunnels

 by Thomas ¦  Fri May 30, 2014 4:31 pm ¦  Forum: New York City Area Wide Rail Transit Issues (Cross-Agency) ¦  Topic: Amtrak Gateway Tunnels ¦  Replies: 2328 ¦  Views: 526883

(an EIS doesn't even have funding yet) As far as I am concerned, Amtrak is planning to begin the EIS and engineering for the new tunnels this year. In fact, in the link below, it states "Gateway Program Development Study (26 mos.): Starting in May 2014, this study will focus on development of ...

Re: Amtrak Gateway Tunnels

 by Thomas ¦  Thu May 29, 2014 10:57 am ¦  Forum: New York City Area Wide Rail Transit Issues (Cross-Agency) ¦  Topic: Amtrak Gateway Tunnels ¦  Replies: 2328 ¦  Views: 526883

We are probably 6-7 years away from anything being done with the space saver. The bit in manhattan will likely be constructed before the actual new tunnels, because they plan to connect to the existing tracks. It is also easier to build on land vs under a river. This means the penn station south tr...

Re: Amtrak Gateway Tunnels

 by Thomas ¦  Wed May 28, 2014 9:58 pm ¦  Forum: New York City Area Wide Rail Transit Issues (Cross-Agency) ¦  Topic: Amtrak Gateway Tunnels ¦  Replies: 2328 ¦  Views: 526883

Why isn't Amtrak's Tunnel Box being connected to Penn Station's Throat soon?

Re: New Crossovers at Hudson (NJ)

 by Thomas ¦  Wed May 28, 2014 9:57 pm ¦  Forum: Amtrak ¦  Topic: New Crossovers at Hudson (NJ) ¦  Replies: 18 ¦  Views: 3078

What does the new Hudson Crossover have to do with the Harrison Fourth Track Project?

Does anyone have any pictures of the new crossover?

  • 1
  • 3
  • 4
  • 5
  • 6