Postby MADDOG » Wed Aug 01, 2018 2:38 pm

From OBRM
Folks, for those of you who seem confused as to why all the steelwork on #398 is being repaired when we received these "overhauled" units years ago, here is the reason.
The batteries were removed from insde the cab but the interior walls were mostly removed as scrap except the back wall which will need to be removed .
All of the wall "studs" were rotted off at the bottom where they meet the floor and only the exterior steel was holding the cab together.
So, the decision was made to replace all of the rotted stell with new and to re-hab the interior/exterior of the cab. When we finish, we plan on watering the unit to find any and all leaks which will be repaired so no more water intrusion into the cab.
Then a brand new BICENTENNIAL paint job like 105!!
Only kidding.
Yellow-as delivered
MADDOG
MADDOG
 
Posts: 281
Joined: Thu May 18, 2006 10:22 pm
Location: SOUTH SHORE LI

Re: **LONG ISLAND PRESERVATION NEWS**

Postby MADDOG » Sun Aug 12, 2018 11:59 am

OBRM update-
As of yesterday, Saturday August 11th, the insurance underwriters inspection for the electrical service was completed and we were given the approval to proceed with the PSE&G hookup. PSE&G visited the site on Thursday and will come back to hook us up within the next couple of weeks.
Our meter pan was given the pan plug in preparation for the meter install.
This is excellent news as after this is hooked up, we now have full yard power to test the turntable's motor.

Asplundh will return to tighten up the guy wires which hold the collector box steady on top of the turntable's bridge so it doesn't move.
Then the wiring will move forward to electrify the control stand, resistor bank and motor.
Railroad Construction corporation, a LIRR contractor, will install track on top of the turntable bridge an adjust the ring rail for proper operation.
If all continues to move forward with no hiccups, we cold see the turntables operation by the Oyster Festival in October.

As for GE 25 ton #398, John has been continuing the re-welding of the cab walls and installation of new steel wall studs along the bottom of the walls where they meet the floor. These had all but rotted away. The Fireman's side wall has been completed along with the front door and engineers side. He is just finishing up the back wall and will finish up the job by cutting out and installing a new threshold to the cab under the engineers door.

Since yesterdays volunteer work session was called off due to the very heavy rain which actually flooded the yard somewhat, we weren't able to tune up our welder/generator or continue to repair the tender.
MADDOG
MADDOG
 
Posts: 281
Joined: Thu May 18, 2006 10:22 pm
Location: SOUTH SHORE LI

Re: **LONG ISLAND PRESERVATION NEWS**

Postby MADDOG » Tue Sep 04, 2018 2:45 pm

Another OBRM Update-
Well, at the last notice we were ready to work on our generator and a couple of weeks ago finally got the tune-up kits and went to town on our 10+year old Lincoln Ranger 8 generator/welder. When finished almost an hour later, we had changed the oil, plugs gas/oil/air filters and cleaned out the carburetor. Now it works like it did when brand new. Maintenance is the key for everything.
At the same time, we spent more time on the electrical service to get it ready for inspection before PSE&G came in to power us up and after a couple of weeks, I am very Happy to report that we now have both 240 and 120 service in the yard for our tools and welder.
We used this service to power up our tools so we could add security railings around the back of both the DE/DM and M7 simulators so we could keep our guests safer.
It also helps us to not have parts lying around, having put them to good use!
We were also able to lay out our trench templates for the 3 new conduits which will need to be buried underground.
1 will allow us to send 200 amp service to our engine house while another will allow us to send 60 amps to the front gate for future power needs.
The third conduit will allow us to pull a 120/20amp and a 240/50amp circuit (for welding and tool use) out to the Ping Pong Coach and Tender which is undergoing major steel replacement.
Once Asplundh returns to lift and re-set the guide wires for the Turntable collector box, we can start hooking up the wiring on top of the collector box and finally, to the resistor bank and motor. We have hired Railroad Construction Corp to lower and tie together all of the ring rail as well as lay rails on top of the turntable deck. We are waiting on a quote for a piece of panel track approximately 40 feet long. With over 100 foot of track with the panel track , we will finally be able to move the GE 25 ton Dinky on top of the turntable and be able to spin her around.
Go to our Facebook page to see the progress at the display yard and also at the Historic Presidential RR Station of President Theodore Roosevelt.
There has been a ton of woodwork and brickwork being done on the west end and we also had all 6 windows restored and installed, so, after almost 75 years, the lower 3 windows are able to be seen and seen through!!
MADDOG
MADDOG
 
Posts: 281
Joined: Thu May 18, 2006 10:22 pm
Location: SOUTH SHORE LI

Re: **LONG ISLAND PRESERVATION NEWS**

Postby hondajohn » Fri Sep 28, 2018 8:09 am

Members of the Oyster Bay Railroad Museum have made further progress on the rust repairs in LIRR 398's cab. The bottom 6 inches of the cab had suffered severe rust damage, and the worst was the back wall. At some point, the LIRR had attempted to repair the structural integrity by welding a piece of replacement steel on top of the damage, but neglected to remove the rusty metal underneath. This trapped moisture and caused further rust in the replacement piece.

IMG_20180927_205255_01.jpg


IMG_20180927_204725_01.jpg


We started by removing panels of original sheetmetal, exposing the LIRR repair beneath. (Light gray is original GE metal, dark gray is LIRR patch panel). Then, we welded the original structural ribs to the replacement metal, properly bonding the two layers together and removing the empty space between.

38750940_10155367824937331_5087191193616384_n.jpg
hondajohn
 
Posts: 42
Joined: Thu Sep 29, 2011 8:21 pm

Re: **LONG ISLAND PRESERVATION NEWS**

Postby hondajohn » Fri Sep 28, 2018 8:16 am

In addition to the vertical ribs, we discovered that the patch panel had never been welded to the floor of the cab. We completed the weld and replaced the missing lower portions of several ribs.

IMG_20180927_205310_01.jpg


With the left side of the back wall stable, we turned our attention to repairs on the fireman's side wall. It was necessary to replace the strut at the rear left corner, as well as 18 inches of lower sheetmetal.

IMG_20180927_205322_01.jpg


IMG_20180927_205327_01.jpg
hondajohn
 
Posts: 42
Joined: Thu Sep 29, 2011 8:21 pm

Re: **LONG ISLAND PRESERVATION NEWS**

Postby hondajohn » Fri Oct 05, 2018 2:45 pm

Work continues at Oyster Bay! With the completion of the fireman's side of the rear wall, we're now moving to the engineer's side. Repairs on that portion will include replacement of the bottom of the door frame. Here are comparison shots of the two halves:

IMG_20181005_084227_01[1].jpg


IMG_20181005_084227_02[1].jpg
hondajohn
 
Posts: 42
Joined: Thu Sep 29, 2011 8:21 pm

Re: **LONG ISLAND PRESERVATION NEWS**

Postby RGlueck » Fri Oct 05, 2018 4:55 pm

Quite commendable work. Getting ahead of the corrosion is 90% or the battle.
RGlueck
 
Posts: 609
Joined: Sat Oct 01, 2011 3:59 pm

Re: **LONG ISLAND PRESERVATION NEWS**

Postby hondajohn » Fri Oct 19, 2018 9:19 am

Fall weather has finally arrived, and the volunteers at Oyster Bay are pressing forward with rust repairs inside 398's cab. All four corners of the cab have now been completely rebuilt, the remaining details will be sorted before the winter, and bodywork and repainting will occur next Spring. Here are some progress shots of the back corner of the engineer's side:

IMG_20181019_101259_01[1].jpg


IMG_20181016_175939725[1].jpg


IMG_20181018_204506551[1].jpg
hondajohn
 
Posts: 42
Joined: Thu Sep 29, 2011 8:21 pm

Re: **LONG ISLAND PRESERVATION NEWS**

Postby MADDOG » Tue Nov 06, 2018 4:37 pm

A short update on the Oyster Bay RR Museum-
This past Saturday was a breakthrough day for the volunteers. After removing so much of the Ping Pong coach, it was finally time to start the reconstruction. Mind you, it will go slowly as our car "was rode hard and put away (very) wet"!!
Our first piece installed tied together the south-west bulkhead wall to the frame which will allow us to install the bathroom cross members. Hopefully, we can get all 4 of these welded in next Saturday. Then the toilet flange will be installed and finally we can start installing the previously fabricated cross beams to tie the entire floor together.
Our future plans are to get the corrugated steel floor installed, then the heater covers and finally the seat frames get bolted in. Finally, we can pour a concrete floor after sealing all of the holes.
Even though the Museum will be closed throughout the winter, many of the volunteers will work through it to push this project along.
MADDOG
MADDOG
 
Posts: 281
Joined: Thu May 18, 2006 10:22 pm
Location: SOUTH SHORE LI

Re: **LONG ISLAND PRESERVATION NEWS**

Postby MADDOG » Sat Nov 10, 2018 5:01 pm

A brief update from the Oyster Bay RR Museum for Saturday 11/10/18
It was very windy but our volunteers came out to assist our master fabricator/welder, Fred Rubin install steel under the bathroom in our ping pong coach #7433.
These 2 pieces were already fabricated and installation went well allowing us to place the toilet flange that Fred fabricated a few months ago.
With a bit of oversized holes to bolt to the toilet itself, the flange was placed over the newly installed floor braces and the toilet installed (temporarily).
At this time, we placed all of the previously fabbed cross members inside the coach for future installation after we level the car.
Next week, we plan on fabricating 2 more cross members to tie the toilet braces into the floor assembly. Tedious work, but Fred makes it look so easy. The hard part is putting up with us novices.
Photos will be available on our Facebook page for the Museum.
We are planning on working through the winter to keep the momentum going on the Ping restoration.
MADDOG
MADDOG
 
Posts: 281
Joined: Thu May 18, 2006 10:22 pm
Location: SOUTH SHORE LI

Previous

Return to Long Island Rail Road (LIRR)

Who is online

Users browsing this forum: No registered users and 4 guests