Being that the Pt. Washington Line is one of the most busiest LIRR lines in the system, I am surprised that there is still single track between just east of Great Neck and just west of Pt. Washington. Why is that? It seems that the Pt. Washington Line would be a great candidate for having double track the rest of the way from Great Neck to Pt. Washington. This would help provide more reverse peak service on the Pt. Washington Branch. It would probably also help the trains run a little more on time. I was doing a lot of railfanning today out there and saw that multiple trains were a little behind schedule but nothing too bad.
njt/mnrrbuff
 
Posts: 3324
Joined: Thu Sep 30, 2004 9:33 pm

Re: Double Tracking the Entire Pt. Washington Line

Postby R36 Combine Coach » Tue May 07, 2019 9:20 pm

The Manhasset Viaduct (Long Island's highest railroad trestle) is part of the original 1898 line and would be very costly to build a second twin span. Plandome station (also from 1898*, elevated 1913) is also only single track.

*Station rebuilt 1990 after fire based on original
Since my friend continues to chain smoke nonstop, she is probably an Alco.
User avatar
R36 Combine Coach
 
Posts: 5342
Joined: Mon Jun 09, 2008 8:51 pm

Re: Double Tracking the Entire Pt. Washington Line

Postby njt/mnrrbuff » Wed May 08, 2019 6:20 am

Eventually the Manhasset trestle will probably have to be replaced but I guess that it’s not a top priority. Another concern about double tracking east of Great Neck will probably be also resident opposition and cutting down a lot of trees. Even if this project can’t get done, at least, the MTA can let LIRR run a few more reverse peak trains as far as Great Neck. It seems that there is a big gap between Trains # 406 and 408 and then between 300 and 410. There are so many offices within walking distance of Great Neck Station. Yesterday, I noticed that many passengers boarded each westbound reverse peak train at Great Neck.
njt/mnrrbuff
 
Posts: 3324
Joined: Thu Sep 30, 2004 9:33 pm

Re: Double Tracking the Entire Pt. Washington Line

Postby MattAmity90 » Wed May 08, 2019 11:24 am

It's not just cutting down trees, they actually said it would be impossible. Here's why:

-Cutting trees.
-relocating Plandome.
-Changing the topography along the ROW.
-Manhasset is similar to being in a ditch, and floods if heavy rain moves through.
-Manhasset has a retaining wall with power lines next to it.
-They will have to relocate the power lines at Plandome, since it is similar to Manhasset.

I could go on and on, but eventually the Manhassett Viaduct will have to be rebuilt. I would build on site the new span, and sway the tracks like a chicane.
This station is Babylon, this is the train to Penn Station. Stopping at: Lindenhurst, Copiague, Amityville, Massapequa Park, Massapequa, Seaford, Wantagh, Bellmore, Merrick, Freeport, Baldwin, Rockville Centre, Lynbrook, Valley Stream, Jamaica, Kew Gardens, Forest Hills, Woodside, Penn Station.
User avatar
MattAmity90
 
Posts: 809
Joined: Sat Apr 21, 2012 4:46 pm
Location: Easton, PA

Re: Double Tracking the Entire Pt. Washington Line

Postby berlintransit » Wed May 08, 2019 3:34 pm

While double-tracking of the whole stretch from Great Neck to Port Washington is a complicated thing, timetabling and operations could be a lot more flexible with an interlocked loop from out of Plandome Station to Port Washington. This could begin after turning east north of Plandome and incorporate the existing Pt Wash drill track. Interlocking at least the switches leading into the Port Washington station tracks would also be helpful, I guess, so a westbound train can depart sooner after a terminating train has arrived. This would enable 4 trains per hour and direction to be timetabled for peak service (half of which should skip Plandome for stabilization).
For ESA preparation, the LIRR is also extending a couple of tracks in Port Wash 'yard' to store more trains. The money would certainly be invested in a wiser way if put into improvements supporting more reverse peak service. Indeed, the Port Washington branch is the 'shortest' LIRR branch meaning a continuous operation in both directions is the way more sensible and efficient option compared to getting trains out of the yard in the suburbs and back into the yard in NYC, even for the peak of the peak.
berlintransit
 
Posts: 39
Joined: Sun Aug 14, 2016 2:36 pm

Re: Double Tracking the Entire Pt. Washington Line

Postby njt/mnrrbuff » Wed May 08, 2019 6:48 pm

Yes, the topography along the right of way once you get east of Great Neck. That is true about Manhasset and Plandome Stations having the power lines right next to the right of way. Yes, Manhasset is in a ditch.
Whenever the Manhasset viaduct is replaced and if it ever gets replaced with a double track viaduct, I don't know how much that would help increase reverse peak service on the branch, especially east of Great Neck.

What is an interlocked loop?

As for ESA, I think the Pt. Washington Line will have very high ridership on the trains heading to Grand Central Terminal. It seems that many people who live along the branch and work in Manhattan have their offices closer to Grand Central Terminal than Penn Station.

As for reverse peak service, people might not only be commuting to jobs in Great Neck. There are probably many people who might work in parts of Queens like Bayside and definately Flushing. I know that it might not always be easy to turn a reverse peak deadhead train into an actual revenue move but if they can do that, that would close the gaps in the schedule. The trains don't even have to make every single stop on the schedule. For instance, it seems that Murray Hill doesn't need to have every reverse peak train stopping. It's close enough to either Flushing-Main Street or Broadway.
njt/mnrrbuff
 
Posts: 3324
Joined: Thu Sep 30, 2004 9:33 pm

Re: Double Tracking the Entire Pt. Washington Line

Postby Commuter X » Fri May 17, 2019 9:36 am

Not a chance
Too may projects and not enough money to expand service

I'll bet the AirTrain from Shea/Flushing to LGA is built first
Commuter X
 
Posts: 333
Joined: Thu Jul 22, 2010 10:04 pm
Location: Stuck on a train somewhere ...

Re: Double Tracking the Entire Pt. Washington Line

Postby njt/mnrrbuff » Fri May 17, 2019 5:48 pm

I don't think it's in the short term to double track the entire Pt. Washington Line. Even for the sake of reverse commuting, it seems that Great Neck is where much of the reverse commuting ends. I'm not saying that there probably aren't reverse commuters who might use the train to head east of Great Neck but it seems that many of the downtown offices aren't located within any immediate areas of Manhasset, Plandome, and Pt. Washington Stations. I could be wrong though. I know that Northern Blvd is located pretty close to the Manhasset Station and there are plenty of offices in Manhasset along Northern Blvd not too far from the train station. I was in Manhasset a few weeks ago and walked from the station down to the Macy's.
njt/mnrrbuff
 
Posts: 3324
Joined: Thu Sep 30, 2004 9:33 pm

Re: Double Tracking the Entire Pt. Washington Line

Postby NIMBYkiller » Tue May 21, 2019 12:30 pm

Double tracking the entirety of the line from east of Great Neck to Port would physically be challenging at best for the reasons already mentioned (viaduct, trench), but from north of the Webster Av bridge, through Plandome, to the end of the drill track is certainly doable. From Webster Av to just north of Plandome you have space on the west side of the ROW. Those power lines could easily by put underneath as part of the project or could be moved over, they don't take up much space. Between Plandome and the end of the drill track you have a creek and a strip of woodland along the east side of the ROW that absolutely has enough space for a 2nd track (I know this area very well, my friends and I used to go off roading there or drinking 40s in those woods all the time). That ought to buy you more than enough flexibility to avoid the majority of the delays on WB departures from Port caused by EB trains, and to extend the one reverse peak train that terminates at Great Neck in the morning (that gap is brutal, I used to work overnight in Great Neck at the hotel across the street from the train and get off at 7am. I would pray the AM shift would come in 5 mins early and marathon sprint to catch that train to Port. If I missed it I was stuck taking the bus). Manhasset you've got some offices, and Port you've got the industrial park on West Shore Road that NICE serves now from PW as well as St Francis Hospital which is accessed via the N23 from Port. It's not a huge driver of ridership, so I'm not so sure how worth it this project would be. I'd file this between "nice to have" and "reliability improvement"
NIMBYkiller
 
Posts: 1447
Joined: Fri Mar 12, 2004 6:24 pm
Location: Port Washington

Re: Double Tracking the Entire Pt. Washington Line

Postby R36 Combine Coach » Tue May 21, 2019 6:46 pm

At the very last, could a passing siding be installed one of those areas for reverse peak trains?
Since my friend continues to chain smoke nonstop, she is probably an Alco.
User avatar
R36 Combine Coach
 
Posts: 5342
Joined: Mon Jun 09, 2008 8:51 pm


Return to Long Island Rail Road (LIRR)

Who is online

Users browsing this forum: No registered users and 10 guests