Pawtuckett/Central Fall train station status.

Discussion relating to commuter rail, light rail, and subway operations of the MBTA.

Moderators: CRail, sery2831

Pawtuckett/Central Fall train station status.

Postby braves » Fri Jul 13, 2018 9:22 am

Has construction begun on building the new Pawtuckett/Central Falls train station.

If so, what year will this train station open.
braves
 
Posts: 295
Joined: Sat Aug 28, 2004 2:31 pm

Re: Pawtuckett/Central Fall train station status.

Postby jonnhrr » Fri Jul 13, 2018 2:09 pm

There were plans to build the station and RI applied for a received a TIGER grant.

Latest news I saw was that the project went over budget and is being scaled back

http://www.providencejournal.com/news/20180302/plans-for-pawtucket-central-falls-rail-station-scaled-down-delayed

Rhode Island is slimming down the planned Pawtucket-Central Falls commuter rail station as the estimated cost of the project swelled beyond its $40-million budget.

The changes will likely set the start of work back six months as the R.I. Department of Transportation rebids the project using a new design no longer including two new sets of track. Work is now slated to begin at the end of the year instead of this summer.

Stephen Devine, chief of the DOT’s transit office, said the change was spurred by federal railroad officials concluding that building a new set of tracks for the Pawtucket station off the busy Northeast Corridor main line was not necessary.

“They own the Northeast Corridor and wanted to try to scale down the amount or track-side infrastructure that was going to drive up the cost of the project,” Devine said. “This gives us a great opportunity to make it a much simpler station with less infrastructure.”

Devine said the estimated cost of the original design was nearing the $50-million mark, but getting rid of the siding tracks and associated switches, signals and other systems should keep it within the $40-million budget.
Avatar Photo - P&W local from Gardner to Worcester at Morgan Rd., Hubbardston
User avatar
jonnhrr
 
Posts: 1077
Joined: Sun May 30, 2004 5:58 pm
Location: Sabattus ME USA

Re: Pawtuckett/Central Fall train station status.

Postby eubnesby » Fri Jul 13, 2018 11:37 pm

I can't believe they're going to restrict the NEC to 2 tracks in that area for the foreseeable future, with local trains stopping on the main line...what a disaster. I expect they won't even future proof it, necessitating a complete rebuild in future...
eubnesby
 
Posts: 51
Joined: Fri Jul 01, 2016 4:40 pm

Re: Pawtuckett/Central Fall train station status.

Postby nomis » Sat Jul 14, 2018 1:23 am

You mean like they do at South Attleboro, Mansfield, Sharon, Canton Jct and Rte 128 with those local trains in two track territory.
Moderator: Metro-North (with CDOT), Photography & Video

Avatar: An overnight trip on Girard Ave. stumbles upon 6 PCC's and an LRV stuck within two blocks.
User avatar
nomis
 
Posts: 2075
Joined: Fri Jan 02, 2009 1:52 pm
Location: MRS 43 (was QA 9 & QB 2)

Re: Pawtuckett/Central Fall train station status.

Postby Trinnau » Sat Jul 14, 2018 6:39 am

The proximity to Providence and South Attleboro along with lower track speeds means it actually makes sense to not waste the money here. The original plan was really just to have short station tracks - nothing promoting an overtake scenario like is done at Attleboro. Lots of pricey infrastructure for zero benefit.

I also don't think it would completely preclude future 3 or 4 track operation in this area, as the same real-estate is required no matter which side of the platforms the track goes on. There is already a 3rd track in this area but it is freight only and is not immediately adjacent to the other two tracks. My guess is one of the platforms will go in the gap between, already setting up a scenario for 3-track operation with that platform accessing two tracks.
Trinnau
 
Posts: 421
Joined: Thu Sep 16, 2010 7:27 pm

Re: Pawtuckett/Central Fall train station status.

Postby BandA » Sat Jul 14, 2018 6:38 pm

So, future-proofing the design just involves a longer pedestrian bridge to accommodate additional future track(s), right?
User avatar
BandA
 
Posts: 2294
Joined: Thu Oct 11, 2012 11:47 am

Re: Pawtuckett/Central Fall train station status.

Postby eubnesby » Sat Jul 14, 2018 7:57 pm

nomis wrote:You mean like they do at South Attleboro, Mansfield, Sharon, Canton Jct and Rte 128 with those local trains in two track territory.


You must be aware that it has been planned to build passing tracks at all those stations. One step forward, two steps back. Will simply mean more money spent later.
eubnesby
 
Posts: 51
Joined: Fri Jul 01, 2016 4:40 pm

Re: Pawtuckett/Central Fall train station status.

Postby Rockingham Racer » Sun Jul 15, 2018 6:04 am

eubnesby wrote:
nomis wrote:You mean like they do at South Attleboro, Mansfield, Sharon, Canton Jct and Rte 128 with those local trains in two track territory.


You must be aware that it has been planned to build passing tracks at all those stations. One step forward, two steps back. Will simply mean more money spent later.


No, I wasn't. Could you point me to the document that outlines those plans, if possible? TIA!

There used to be a plan posted [couldn't find it just now] that had some triple tracking, but don't have a recollection about by-pass tracks [Kingston, excepted].
User avatar
Rockingham Racer
 