Portageville Bridge Replacement, Future Tier Traffic

Pertaining to all railroading subjects, past and present, in New York State.

Moderator: Otto Vondrak

Re: Portageville Bridge Replacement, Future Tier Traffic

Postby CPSmith » Mon Aug 20, 2018 12:56 pm

You could be correct - I don't really know other than to say that's a lot of power in a small space. I'll make that point and leave it at that, because I just don't know. If they were FPs, I probably wouldn't question it, but having tramped though a number of Fs in my career, I'm skeptical, but hey, who knows. Steam generators were (in general) more high than wide, so I guess you could build a HEP unit in the same manner. I doubt anyone would use the one in the photo and mount it transversely as you still need to get out the rear door, but nothing says you can't re-design it for a more up-and-down configuration.

The Southern constructed at least one power car out of an old baggage car and used a pair of 6-cylinder Detroit Diesels mounted length-wise, of roughly the same configuration as in the photo. I imagine NS 39 has a similar story.

Now I'm waiting for some meet-and-greet where I can take a walk through.
peddle your shorts
CPSmith
 
Posts: 408
Joined: Wed Jun 27, 2007 10:15 am

Re: Portageville Bridge Replacement, Future Tier Traffic

Postby thebigham » Sun Sep 02, 2018 1:23 pm

The park wanted to re-open the Portageville entrance for Labor Day, but there's a problem with the pavement on the new road (or with the parking lot) so it has been delayed. Grrr....
thebigham
 
Posts: 3595
Joined: Fri Mar 12, 2004 2:27 pm
Location: Arcade, NY

Re: Portageville Bridge Replacement, Future Tier Traffic

Postby el3625 » Sat Sep 22, 2018 6:07 pm

Well, is it open yet? I am going camping soon in NY and have every intention of going to see the new bridge.

Bruce
el3625
 
Posts: 23
Joined: Thu May 05, 2011 4:04 pm

Re: Portageville Bridge Replacement, Future Tier Traffic

Postby thebigham » Mon Sep 24, 2018 9:24 am

^Not yet! Any day now...
thebigham
 
Posts: 3595
Joined: Fri Mar 12, 2004 2:27 pm
Location: Arcade, NY

Re: Portageville Bridge Replacement, Future Tier Traffic

Postby thebigham » Sun Sep 30, 2018 11:45 am

Possibly, Monday October 1st.
thebigham
 
Posts: 3595
Joined: Fri Mar 12, 2004 2:27 pm
Location: Arcade, NY

Re: Portageville Bridge Replacement, Future Tier Traffic

Postby charlie6017 » Mon Oct 01, 2018 6:48 am

thebigham wrote:Possibly, Monday October 1st.


Yep, according to a post from John Kucko on Twitter, the Portageville entrance is now open.

Charlie
~Charlie Ricker
User avatar
charlie6017
 
Posts: 3101
Joined: Thu Mar 11, 2004 9:42 pm
Location: Rochester, New York

Re: Portageville Bridge Replacement, Future Tier Traffic

Postby thebigham » Mon Oct 01, 2018 12:08 pm

^Yes. The Portageville entrance closed on December 17, 2015.

I'm going over now to take pics.
thebigham
 
Posts: 3595
Joined: Fri Mar 12, 2004 2:27 pm
Location: Arcade, NY

Re: Portageville Bridge Replacement, Future Tier Traffic

Postby thebigham » Mon Oct 01, 2018 2:49 pm

Pics taken Oct. 1, 2018
Attachments
100_4293.JPG
100_4291.JPG
thebigham
 
Posts: 3595
Joined: Fri Mar 12, 2004 2:27 pm
Location: Arcade, NY

Re: Portageville Bridge Replacement, Future Tier Traffic

Postby charlie6017 » Mon Oct 01, 2018 3:46 pm

Great shots, Chris! 😎
~Charlie Ricker
User avatar
charlie6017
 
Posts: 3101
Joined: Thu Mar 11, 2004 9:42 pm
Location: Rochester, New York

Re: Portageville Bridge Replacement, Future Tier Traffic

Postby Old & Weary » Mon Oct 01, 2018 5:31 pm

In a few short years growing trees, which apparently have been planted with a view of blocking off the "offensive" tracks will ruin any photography from this location.
Old & Weary
 
Posts: 121
Joined: Tue Feb 21, 2006 7:21 am

Re: Portageville Bridge Replacement, Future Tier Traffic

Postby thebigham » Wed Nov 21, 2018 1:55 pm

Recent Kohn Kucko pics...
Attachments
letchworth400.jpg
letchworth500.jpg
thebigham
 
Posts: 3595
Joined: Fri Mar 12, 2004 2:27 pm
Location: Arcade, NY

Re: Portageville Bridge Replacement, Future Tier Traffic

Postby thebigham » Sun Dec 30, 2018 7:07 pm

Here are some Then ( 2014/2015) & Now (2018) pics.

West bank in September 2014: http://photos.greatrails.net/s/?p=219449
On March 19, 2015: http://photos.greatrails.net/s/?p=222721
On March 28, 2015: http://photos.greatrails.net/s/?p=222934
On October 1, 2018: http://photos.greatrails.net/s/?p=246251 - the pier is where the tress were cut

Bridge over the park road in August 2014: http://photos.greatrails.net/s/?p=217761
On March 28, 2015: http://photos.greatrails.net/s/?p=222940
On October 1, 2018: http://photos.greatrails.net/s/?p=246250 - bridge now over the circular stone wall

East bank in September 2014: http://photos.greatrails.net/s/?p=219452 and http://photos.greatrails.net/s/?p=219451
On March 28, 2015: http://photos.greatrails.net/s/?p=222941
On Sept. 23, 2018: http://photos.greatrails.net/s/?p=246958

Location of new bridge in September 2014: http://photos.greatrails.net/s/?p=219447
On March 28, 2015: http://photos.greatrails.net/s/?p=222932
On october 1, 2018: http://photos.greatrails.net/s/?p=247859

West bank in September 2014: http://photos.greatrails.net/s/?p=219448
On March 19, 2015: http://photos.greatrails.net/s/?p=222723
On March 28, 2015: http://photos.greatrails.net/s/?p=222933
On October 1, 2018: http://photos.greatrails.net/s/?p=246216

Some of these match up. Some don't.

The Portageville entrance is now closed for the winter (I'm so mad.) so you can only hike in to the new bridge.
thebigham
 
Posts: 3595
Joined: Fri Mar 12, 2004 2:27 pm
Location: Arcade, NY

Re: Portageville Bridge Replacement, Future Tier Traffic

Postby dgvrengineer » Sun Dec 30, 2018 8:50 pm

Nice article in February Trains magazine on the bridge and its construction.
dgvrengineer
 
Posts: 151
Joined: Tue Mar 08, 2011 10:22 am

Re: Portageville Bridge Replacement, Future Tier Traffic

Postby 1Loran » Fri Jan 25, 2019 9:33 am

MACTRAXX wrote:Everyone: Good to know about the fully completed status of the Genesee Arch Bridge.
The picture by John Kucko of the NS Office Car train on the bridge shows off the structure well...

Has there been any trespasser problems concerning the GAB this year now that we are more than
half way through Summer 2018? Is the bridge being watched by NYS State Park and/or NS Police?

If there are any special NO TRESPASSING signs in evidence around the vicinity of the bridge can
someone post a picture of one? Back when the GAB was being designed and built was there any
consideration about adding a secured walkway on one side alongside the track or was even that
deemed to be too much of a danger risk? MACTRAXX


We were up there in late October, and there were a lot of folks in the park and around the bridge. There were even a handful of cars on the east side of the bridge. Kucko reported that several arrests were made on the bridge during the Fall Fest weekend. I was surprised that the bridge has no area to walk for employees, the ballast covers the entire deck making footing problematic. Personally, I would never consider going out on the bridge. In addition to being illegal, the speed limit is much higher and you cannot hear east bound trains in dynamic braking approaching the bridge. There would be no chance to get off the bridge like in the old days. The bridge is well posted and fenced, but open to trespassers who are determined to be idiots.
1Loran
 
Posts: 15
Joined: Thu Mar 29, 2012 12:02 pm

Re: Portageville Bridge Replacement, Future Tier Traffic

Postby thebigham » Tue Jan 29, 2019 10:43 am

^The problem is that they put up inferior fencing.

If NS and Letchworth were serious about trespassing, they would have put up industrial fencing.

The first time I saw it, I knew it would not prevent trespassing on the bridge.
thebigham
 
Posts: 3595
Joined: Fri Mar 12, 2004 2:27 pm
Location: Arcade, NY

PreviousNext

Return to New York State Railfan

Who is online

Users browsing this forum: No registered users and 4 guests