JamesRR wrote:Work is, and will be, ongoing. There is much more to do. People were falsely led to believe the summer work was all that was needed - but in reality, it hasn't scratched the surface yet.
JoeG wrote:. Presumably when this project is finally done, there will be a reduction in NYP traffic and maybe that will make repairs easier. And maybe with a big reduction in LIRR traffic some of the LIRR west side yard capacity could be used by NJT and therefore maybe one of the East River tubes at a time could be rebuilt. But of course, without Gateway, the time bomb threat continues. If the money for Gateway is somehow forthcoming, anyone have a notion of how long it would take to build the new tunnels?
EuroStar wrote:It appears to me that over the past month or so yard track 5A has been pulled up. The rail is gone and the ties are a disorderly mess. For the uninitiated, this was the yard track between the Empire Main and the south most of the 6 tracks that merge into the Hudson River Tunnels. I do not recall that track being ever used for mid-day storage of NJT equipment, but it was frequently used for storage of maintenance of way equipment. Does anyone know what is going on? What is the purpose of all this?
STrRedWolf wrote:They may be getting all of that ready for the two new Gateway tunnels. Latest documents say that they would come in though there.
Users browsing this forum: Gilbert B Norman, gokeefe, SouthernRailway and 18 guests