Re: Post-PTC Deadline: What Happens Next?

Postby dbperry » Tue Apr 26, 2016 9:08 am

Ahhh...

I think the 330 towers they are talking about needing are needed for the data link to the trains. All the PTC systems I've seen require a radio data link between the trains and the 'shore-side' control computers / network.

So fiber gets the signal to/from the towers, but you still need radios on towers on all the lines to communicate with the trains.
Known to Keolis and the MBTA as "Twitter Dave"
Frequently posting about the MBTA Framingham-Worcester line on Twitter: https://twitter.com/FramWorMBTA
Owner of Framingham-Worcester Blog: http://FramWorMBTA.weebly.com/
Maintainer of MBTA schedule archive: http://www.dbperry.net/MBTA/
User avatar
dbperry
 
Posts: 793
Joined: Mon Mar 27, 2006 9:28 pm
Location: Suburbs of Boston

Re: Post-PTC Deadline: What Happens Next?

Postby F-line to Dudley via Park » Tue Apr 26, 2016 11:26 am

dbperry wrote:Ahhh...

I think the 330 towers they are talking about needing are needed for the data link to the trains. All the PTC systems I've seen require a radio data link between the trains and the 'shore-side' control computers / network.

So fiber gets the signal to/from the towers, but you still need radios on towers on all the lines to communicate with the trains.


Amtrak hasn't needed long-distance radio towers to run ACSES on the NEC for the last 15 years. But the NEC is strung up with fiber all along its length.
F-line to Dudley via Park
 
Posts: 7218
Joined: Fri Mar 11, 2005 7:26 pm
Location: North Cambridge

Re: Post-PTC Deadline: What Happens Next?

Postby sery2831 » Thu Apr 28, 2016 8:01 pm

The North Side is going to be PTC with existing way side signals. No cabs. No need to change the signal system that's in place currently.
Moderator: MBTA Rail Operations
User avatar
sery2831
 
Posts: 5136
Joined: Fri Mar 12, 2004 2:15 pm
Location: Manchester, NH

Commuter Rail Disruption Spring 2017?

Postby charlesriverbranch » Wed Aug 03, 2016 12:37 pm

I heard a story on the radio this morning to the effect that there will be major disruptions to commuter rail service next spring due to some sort of upgrade (PTC?). Does anyone have any more information?
charlesriverbranch
 
Posts: 32
Joined: Thu Mar 05, 2015 6:53 am

Re: Commuter Rail Disruption Spring 2017?

Postby dbperry » Wed Aug 03, 2016 9:54 pm

Details on PTC are in presentations to FMCB (which is what generated news stories).

This old one has some (but not much more) details about weekend work, but does lay out the sequencing in general:
http://www.mbta.com/uploadedfiles/About ... 110215.pdf

This recent presentation details the financing:
http://www.mbta.com/uploadedfiles/About ... 8-1-16.pdf
Known to Keolis and the MBTA as "Twitter Dave"
Frequently posting about the MBTA Framingham-Worcester line on Twitter: https://twitter.com/FramWorMBTA
Owner of Framingham-Worcester Blog: http://FramWorMBTA.weebly.com/
Maintainer of MBTA schedule archive: http://www.dbperry.net/MBTA/
User avatar
dbperry
 
Posts: 793
Joined: Mon Mar 27, 2006 9:28 pm
Location: Suburbs of Boston

Re: Post-PTC Deadline: What Happens Next?

Postby dbperry » Wed Aug 03, 2016 9:58 pm

Funding for the PTC for Commuter Rail was discussed at the 8/1/16 FMCB meeting. Presentation here:
http://www.mbta.com/uploadedfiles/About ... 8-1-16.pdf

State House News Service article here:
http://newbostonpost.com/2016/08/03/cos ... sruptions/
Known to Keolis and the MBTA as "Twitter Dave"
Frequently posting about the MBTA Framingham-Worcester line on Twitter: https://twitter.com/FramWorMBTA
Owner of Framingham-Worcester Blog: http://FramWorMBTA.weebly.com/
Maintainer of MBTA schedule archive: http://www.dbperry.net/MBTA/
User avatar
dbperry
 
Posts: 793
Joined: Mon Mar 27, 2006 9:28 pm
Location: Suburbs of Boston