MBTA F40PH-2C Overhaul Program

Discussion relating to commuter rail, light rail, and subway operations of the MBTA.

Moderators: CRail, sery2831

MBTA F40PH-2C Overhaul Program

Postby Fan Railer » Thu May 12, 2016 3:30 pm

http://www.bostonglobe.com/metro/2016/0 ... nt=event25

The article is fairly vague with specific details. I presume the prime mover remains a 645? Discuss away :wink:
Fan Railer
 
Posts: 2157
Joined: Wed Sep 03, 2008 9:32 pm

Re: MBTA F40PH-2C Overhaul Program

Postby diburning » Thu May 12, 2016 5:49 pm

I don't think anything was changed internally besides replacement/refurbishment of worn parts.
User avatar
diburning
 
Posts: 2975
Joined: Sat Feb 09, 2008 7:37 pm
Location: Practicing safe CSX by using Three-Step Protection

Re: MBTA F40PH-2C Overhaul Program

Postby GP40MC1118 » Thu May 12, 2016 7:29 pm

I doubt it got a new block up in Waterville. Needed HEP work when it got back
to BET.

The 1056 went south on the Readville Switcher last night, so I guess it'll break in
down there instead of the Northside.

D
GP40MC1118
 
Posts: 3314
Joined: Thu Mar 11, 2004 8:06 pm


Return to Massachusetts Bay Transportation Authority (MBTA)

Who is online

Users browsing this forum: Google Feedfetcher and 10 guests