Re: M9 Cars Design Delivery and Acceptance

Postby Fan Railer » Sat Nov 07, 2015 10:55 pm

Jeff Smith wrote:So why the single designation? And a separate designation for LIRR for a second order M9-A. Doesn't make any sense.

Again, the "A" designation on the M9 order is simply to distinguish between the Federally funded cars and the locally funded cars. They are SUPPOSED to be nearly identical (if not completely identical), and be interoperable.
Fan Railer
 
Posts: 2156
Joined: Wed Sep 03, 2008 9:32 pm

Re: M9 Cars Design Delivery and Acceptance

Postby Penn Central » Wed Apr 06, 2016 8:42 pm

Jeff Smith wrote:Thinking VERY long-term, if MNRR ever gets to it, if you ran Hudson branch trains into Penn (part of the PSAS plan, not currently funded) you might want through running trains. That would require over/under. Or, say you have fleet issues on either side of the sound due to an incident such as Sandy, flat-spotting (remember when the 7a's first came out?), etc., it would be nice to be able to rotate in and out as needed.


As there is no third rail from 36 St to CP 12 (almost 10 miles) this suggestion makes absolutely no sense at all unless you think NY State is going to pay to add third rail to the entire Empire Branch. That is never going to happen.
User avatar
Penn Central
 
Posts: 466
Joined: Wed Dec 15, 2004 8:19 pm

Re: M9 Cars Design Delivery and Acceptance

Postby Jeff Smith » Thu Apr 07, 2016 8:17 am

Agreed; merely postulating the possibilities out loud, even if far-fetched. We've talked about this both here, the PSA thread, and the Empire Connection thread. Sometimes it just takes a while to get there :wink: . At the Empire thread, even the subject of catenary was being discussed.
Next stop, Willoughby
~Jeff Smith (fka "Sarge") :: RAILROAD.NET Site Administrator
Jeff Smith
Site Admin
 
Posts: 7356
Joined: Tue Nov 07, 2006 9:28 am
Location: MP 67.2 Georgia Southern Railway

Re: M9 Cars Design Delivery and Acceptance

Postby DutchRailnut » Thu Apr 07, 2016 10:11 am

wait till you know who trows in his fantasies of Rohr Turboliners and the BB&T rr gets tracking rights..
If Conductors are in charge, why are they promoted to be Engineer???

Retired Triebfahrzeugführer
User avatar
DutchRailnut
 
Posts: 21125
Joined: Thu Mar 11, 2004 8:02 pm
Location: released from Stalag 13

Re: M9 Cars Design Delivery and Acceptance

Postby Ridgefielder » Mon Apr 10, 2017 7:14 am

What is the width of the aisles on the M7-8's and future M-9s? Can't seem to find the info anywhere online.
Ridgefielder
 
Posts: 2281
Joined: Sat Aug 02, 2008 7:22 pm
Location: Harlem Division MP 15

Previous

Return to MTA Metro-North Railroad and CtDOT Passenger Rail

Who is online

Users browsing this forum: No registered users and 4 guests