Re: Metro-North Penn Station Access Study (PSAS)

Postby jlr3266 » Wed Oct 31, 2018 8:56 am

There has been no work within Sunnyside Yard itself.
jlr3266
 
Posts: 534
Joined: Thu Mar 18, 2004 7:32 am

Re: Metro-North Penn Station Access Study (PSAS)

Postby Backshophoss » Mon Nov 05, 2018 10:33 pm

Sunnyside Yard is owned by Amtrak,shared with NJT,and is tangled with parts of the ESA project.
Former Yard A is now the layup yard for ESA and Arch st Shop(LIRR),used as a materials site for ESA.
Backshophoss
 
Posts: 5697
Joined: Mon Mar 05, 2012 7:58 pm

Metro North - Amtrak issues for Penn Station Access?

Postby roysmith » Tue Dec 11, 2018 8:38 pm

I was at a workshop this evening to talk about the new Metro North stations in The Bronx (https://www1.nyc.gov/site/planning/plan ... north.page). The people there were mostly city planners who were interested in the design of the stations themselves, not railroad people, so I wasn't able to find out what I wanted to know.

I gather the last big stumbling block is negotiations between Amtrak and Metro North about the use of the Amtrak trackage between New Rochelle and Sunnyside, but I was unable to find out what the issues are that are holding things up. Amtrak feels there's insufficient track capacity for both the existing NorthEast Corridor service and the new Metro North service. A third track will need to be built to handle the added load. Are there any fundamental technical issues here, or is it just a matter of who comes up with the cash to pay for the upgrade?

From what I can see, it looks like there used to be four tracks and two were torn up some time ago. So, I assume it's just a matter of relaying the track. Yeah, I know, that's not cheap, but at least the right-of-way already exists. The choke point looks like it'll be the Pelham Bay Bridge, which is only two tracks wide.
roysmith
 
Posts: 35
Joined: Thu Jan 21, 2016 2:52 pm

Re: Metro North - Amtrak issues for Penn Station Access?

Postby DutchRailnut » Tue Dec 11, 2018 8:40 pm

one of big upgrades is Amtrak besides that 3th track wants MTA to built a new Pelham Bay drawbridge of higher capacity.
If Conductors are in charge, why are they promoted to be Engineer???

Retired Triebfahrzeugführer. I am not a moderator.
User avatar
DutchRailnut
 
Posts: 21929
Joined: Thu Mar 11, 2004 8:02 pm
Location: released from Stalag 13

Re: Metro North - Amtrak issues for Penn Station Access?

Postby Backshophoss » Wed Dec 12, 2018 2:20 am

Does the Con-Ed feed West Farms substation need an upgrade for this service??
Backshophoss
 
Posts: 5697
Joined: Mon Mar 05, 2012 7:58 pm

Re: Metro North - Amtrak issues for Penn Station Access?

Postby ATK » Thu Dec 13, 2018 12:50 pm

Have they extended the over-running 3rd rail out to the 60Hz/25Hz change-over area yet? M8's will not operate on a 25Hz system.
ATK
 
Posts: 237
Joined: Thu Mar 11, 2004 10:46 pm
Location: Defected to the red side

Re: Metro North - Amtrak issues for Penn Station Access?

Postby DutchRailnut » Thu Dec 13, 2018 5:45 pm

no and no , West farms has nothing to do with 60 hz or M-8's and no the third rail can't be extended unless a new substation/breaker house is put in service to feed at mile of track.
in fact no money has been allocated.
If Conductors are in charge, why are they promoted to be Engineer???

Retired Triebfahrzeugführer. I am not a moderator.
User avatar
DutchRailnut
 
Posts: 21929
Joined: Thu Mar 11, 2004 8:02 pm
Location: released from Stalag 13

Re: Metro North - Amtrak issues for Penn Station Access?

Postby Backshophoss » Thu Dec 13, 2018 8:47 pm

West Farms Substation is what remains of the New Haven's Van Nest Power Generator Complex and vast Electric Backshop for the New Haven
and NYW&B RR's that existed ages ago.

LIRR Might need to expand 1 of the Port Washington Branch Substations to power the LIRR style 3rd from Harold to 1 mile past CP Gate
on Amtrak's Hellgate line.
Backshophoss
 
Posts: 5697
Joined: Mon Mar 05, 2012 7:58 pm

Re: Metro North - Amtrak issues for Penn Station Access?

Postby DutchRailnut » Thu Dec 13, 2018 8:58 pm

ehh no the track from Gate to were third rail now tails will need an entire substation and breaker house.
and the feed would not come from west farms as it needs a 60 Hz feed .
If Conductors are in charge, why are they promoted to be Engineer???

Retired Triebfahrzeugführer. I am not a moderator.
User avatar
DutchRailnut
 
Posts: 21929
Joined: Thu Mar 11, 2004 8:02 pm
Location: released from Stalag 13

MNCR to NYP for real or just more talk?

Postby hrfcarl » Tue Jan 22, 2019 12:54 pm

I was under the impression NYP is at or near capacity, so is this assuming ESA is finished and Amtrak gets new tunnels/Moynihan Station? Or just talk?

https://www.nbcnewyork.com/news/local/M ... cCnEUhI6IU
hrfcarl
 
Posts: 518
Joined: Tue Jun 26, 2007 9:35 pm

Re: Metro-North Penn Station Access Study (PSAS)

Postby Jeff Smith » Tue Jan 22, 2019 1:18 pm

Apparently it’s real; Amtrak agrees: https://www.nbcnewyork.com/news/local/M ... 97292.html

...
Amtrak confirmed the deal in a statement.
"We are pleased to have reached a preliminary agreement that will allow for MTA to advance for design and construction of improvements on Amtrak's Hell Gate Line, for the eventual operation of new Metro-North commuter rail service into New York Penn Station and construction of four new stations along the line," Amtrak Senior Executive Vice President Stephen Gardner said.
...
Next stop, Willoughby
~Jeff Smith (fka "Sarge") :: RAILROAD.NET Site Administrator
Jeff Smith
Site Admin
 
Posts: 8013
Joined: Tue Nov 07, 2006 9:28 am
Location: MP 67.2 Georgia Southern Railway

Re: Metro-North Penn Station Access Study (PSAS)

Postby hrfcarl » Tue Jan 22, 2019 2:05 pm

lol, that is the same link and I did read that. It was the "preliminary" that made me ask how real this is and look for additional info - I should have searched instead of scrolling, as I missed this thread. Thanks for adding my post to this thread.
hrfcarl
 
Posts: 518
Joined: Tue Jun 26, 2007 9:35 pm

Re: Metro-North Penn Station Access Study (PSAS)

Postby Jeff Smith » Tue Jan 22, 2019 2:19 pm

Yeah, I missed your link in a rush to post!
Next stop, Willoughby
~Jeff Smith (fka "Sarge") :: RAILROAD.NET Site Administrator
Jeff Smith
Site Admin
 
Posts: 8013
Joined: Tue Nov 07, 2006 9:28 am
Location: MP 67.2 Georgia Southern Railway

Re: Metro-North Penn Station West Side Access

Postby EuroStar » Tue Jan 22, 2019 3:55 pm

Any idea what exactly NYState/MTA agreed to pay for in order to secure Amtrak's approval?
EuroStar
 
Posts: 588
Joined: Fri Oct 19, 2012 8:26 pm
Location: Middle of Nowhere

Re: Metro-North Penn Station West Side Access

Postby DutchRailnut » Tue Jan 22, 2019 3:57 pm

retracted , see following posts.
Last edited by DutchRailnut on Tue Jan 22, 2019 5:34 pm, edited 1 time in total.
If Conductors are in charge, why are they promoted to be Engineer???

Retired Triebfahrzeugführer. I am not a moderator.
User avatar
DutchRailnut
 
Posts: 21929
Joined: Thu Mar 11, 2004 8:02 pm
Location: released from Stalag 13

PreviousNext

Return to MTA Metro-North Railroad and CtDOT Passenger Rail

Who is online

Users browsing this forum: No registered users and 5 guests