Metro-North Penn Station Access Study (PSAS)

Discussion relating to the operations of MTA MetroNorth Railroad including west of Hudson operations and discussion of CtDOT sponsored rail operations such as Shore Line East and the Springfield to New Haven Hartford Line

Moderators: GirlOnTheTrain, nomis, Jeff Smith

Re: Metro-North Penn Station Access Study (PSAS)

Postby jlr3266 » Wed Oct 31, 2018 8:56 am

There has been no work within Sunnyside Yard itself.
jlr3266
 
Posts: 534
Joined: Thu Mar 18, 2004 7:32 am

Re: Metro-North Penn Station Access Study (PSAS)

Postby Backshophoss » Mon Nov 05, 2018 10:33 pm

Sunnyside Yard is owned by Amtrak,shared with NJT,and is tangled with parts of the ESA project.
Former Yard A is now the layup yard for ESA and Arch st Shop(LIRR),used as a materials site for ESA.
Backshophoss
 
Posts: 5675
Joined: Mon Mar 05, 2012 7:58 pm

Metro North - Amtrak issues for Penn Station Access?

Postby roysmith » Tue Dec 11, 2018 8:38 pm

I was at a workshop this evening to talk about the new Metro North stations in The Bronx (https://www1.nyc.gov/site/planning/plan ... north.page). The people there were mostly city planners who were interested in the design of the stations themselves, not railroad people, so I wasn't able to find out what I wanted to know.

I gather the last big stumbling block is negotiations between Amtrak and Metro North about the use of the Amtrak trackage between New Rochelle and Sunnyside, but I was unable to find out what the issues are that are holding things up. Amtrak feels there's insufficient track capacity for both the existing NorthEast Corridor service and the new Metro North service. A third track will need to be built to handle the added load. Are there any fundamental technical issues here, or is it just a matter of who comes up with the cash to pay for the upgrade?

From what I can see, it looks like there used to be four tracks and two were torn up some time ago. So, I assume it's just a matter of relaying the track. Yeah, I know, that's not cheap, but at least the right-of-way already exists. The choke point looks like it'll be the Pelham Bay Bridge, which is only two tracks wide.
roysmith
 
Posts: 35
Joined: Thu Jan 21, 2016 2:52 pm

Re: Metro North - Amtrak issues for Penn Station Access?

Postby DutchRailnut » Tue Dec 11, 2018 8:40 pm

one of big upgrades is Amtrak besides that 3th track wants MTA to built a new Pelham Bay drawbridge of higher capacity.
If Conductors are in charge, why are they promoted to be Engineer???

Retired Triebfahrzeugführer. I am not a moderator.
User avatar
DutchRailnut
 
Posts: 21898
Joined: Thu Mar 11, 2004 8:02 pm
Location: released from Stalag 13

Re: Metro North - Amtrak issues for Penn Station Access?

Postby Backshophoss » Wed Dec 12, 2018 2:20 am

Does the Con-Ed feed West Farms substation need an upgrade for this service??
Backshophoss
 
Posts: 5675
Joined: Mon Mar 05, 2012 7:58 pm

Re: Metro North - Amtrak issues for Penn Station Access?

Postby ATK » Thu Dec 13, 2018 12:50 pm

Have they extended the over-running 3rd rail out to the 60Hz/25Hz change-over area yet? M8's will not operate on a 25Hz system.
ATK
 
Posts: 237
Joined: Thu Mar 11, 2004 10:46 pm
Location: Defected to the red side

Re: Metro North - Amtrak issues for Penn Station Access?

Postby DutchRailnut » Thu Dec 13, 2018 5:45 pm

no and no , West farms has nothing to do with 60 hz or M-8's and no the third rail can't be extended unless a new substation/breaker house is put in service to feed at mile of track.
in fact no money has been allocated.
If Conductors are in charge, why are they promoted to be Engineer???

Retired Triebfahrzeugführer. I am not a moderator.
User avatar
DutchRailnut
 
Posts: 21898
Joined: Thu Mar 11, 2004 8:02 pm
Location: released from Stalag 13

Re: Metro North - Amtrak issues for Penn Station Access?

Postby Backshophoss » Thu Dec 13, 2018 8:47 pm

West Farms Substation is what remains of the New Haven's Van Nest Power Generator Complex and vast Electric Backshop for the New Haven
and NYW&B RR's that existed ages ago.

LIRR Might need to expand 1 of the Port Washington Branch Substations to power the LIRR style 3rd from Harold to 1 mile past CP Gate
on Amtrak's Hellgate line.
Backshophoss
 
Posts: 5675
Joined: Mon Mar 05, 2012 7:58 pm

Re: Metro North - Amtrak issues for Penn Station Access?

Postby DutchRailnut » Thu Dec 13, 2018 8:58 pm

ehh no the track from Gate to were third rail now tails will need an entire substation and breaker house.
and the feed would not come from west farms as it needs a 60 Hz feed .
If Conductors are in charge, why are they promoted to be Engineer???

Retired Triebfahrzeugführer. I am not a moderator.
User avatar
DutchRailnut
 
Posts: 21898
Joined: Thu Mar 11, 2004 8:02 pm
Location: released from Stalag 13

Previous

Return to MTA Metro-North Railroad and CtDOT Passenger Rail

Who is online

Users browsing this forum: No registered users and 3 guests