New Metro North locos

Discussion relating to the operations of MTA MetroNorth Railroad including west of Hudson operations and discussion of CtDOT sponsored rail operations such as Shore Line East and the Springfield to New Haven Hartford Line

Moderators: GirlOnTheTrain, nomis, Jeff Smith

New Metro North locos

Postby UpperHarlemLine4ever » Thu Jan 25, 2018 8:24 pm

Are there a rumblings about new engines yet for Metro North? If so, are there any bidders yet?
User avatar
UpperHarlemLine4ever
 
Posts: 419
Joined: Fri Mar 12, 2004 10:29 am
Location: N White Plains, NY

Re: New Metro North locos

Postby Backshophoss » Thu Jan 25, 2018 10:43 pm

A possible variant of the SC-44 Charger,part of a Joint order with Amtrak and LIRR,a dual mode model running on 3rd rail(770 VDC) and Diesel.
Backshophoss
 
Posts: 5419
Joined: Mon Mar 05, 2012 7:58 pm

Re: New Metro North locos

Postby DutchRailnut » Fri Jan 26, 2018 8:41 am

how can there be bidders when a RFP has not been issued yet.
currently several manufacturers have been approached on their take on providing new Dual mode locomotives.
it would be a combined order for LIRR - MN - Amtrak (NYS) specifications can be found here :
http://www.highspeed-rail.org/Pages/DocsSpecs.aspx
If Conductors are in charge, why are they promoted to be Engineer???

Retired Triebfahrzeugführer
User avatar
DutchRailnut
 
Posts: 21699
Joined: Thu Mar 11, 2004 8:02 pm
Location: released from Stalag 13

Re: New Metro North locos

Postby Tadman » Sat Jan 27, 2018 12:37 pm

DutchRailnut wrote:how can there be bidders when a RFP has not been issued yet.


Usually before the RFP, there is an RFI - Request for Information - or RFQ - Request for Qualifications. Those serve to find and narrow down a pool of prospective bidders. At the time the RFP is issued on a major project, there is usually a set pool of bidders out there already. Technically, there aren't officially bidders until the RFP closes, because you don't submit a bid the day the RFP is issued. Usually there's a 90 day window to prepare the bid, and it's not turned in until the last day to keep information from leaking out.

But I'm sure you knew that.
Tadman
 
Posts: 8824
Joined: Wed Sep 01, 2004 10:21 am

Re: New Metro North locos

Postby DutchRailnut » Sat Jan 27, 2018 3:24 pm

there is going to be a lot of negotiations not only with manufacturers but also between the 3 railroads. as all 3 will get same Dual mode unit.
If Amtrak requires a toilet, all will get it.
If MN needs a nose egress then even the LIRR and Amtrak units will get it.

cost will be all for NY state and under PRII requirement it will be a combined design.
If Conductors are in charge, why are they promoted to be Engineer???

Retired Triebfahrzeugführer
User avatar
DutchRailnut
 
Posts: 21699
Joined: Thu Mar 11, 2004 8:02 pm
Location: released from Stalag 13

Re: New Metro North locos

Postby SecaucusJunction » Sat Jan 27, 2018 5:33 pm

I'd think the WOH engine fleet would be a higher priority. They're not dual mode and consistency break Down.
I think it may be possible that NJ Transit might not be the perfect, infallible organization that most people assume it is.
SecaucusJunction
 
Posts: 3053
Joined: Mon Apr 26, 2004 9:40 pm
Location: NS Watchdog

Re: New Metro North locos

Postby DutchRailnut » Sat Jan 27, 2018 6:33 pm

they were just rebuild , not likely they be replaced soon.
If Conductors are in charge, why are they promoted to be Engineer???

Retired Triebfahrzeugführer
User avatar
DutchRailnut
 
Posts: 21699
Joined: Thu Mar 11, 2004 8:02 pm
Location: released from Stalag 13

Re: New Metro North locos

Postby GirlOnTheTrain » Sun Jan 28, 2018 11:04 am

Why on earth would you need the WOH engines to be dual mode? It's not like they run anywhere that requires electrification.
(Not that it stops NJT from running ALP45s on the Pascack Valley line...)
"I am no longer just a girl on the train, going back and forth without point or purpose."

Moderator: Amtrak, MTA Metro-North, MTA New York City Subway/PATH/NYC Area Light Rail
User avatar
GirlOnTheTrain
 
Posts: 471
Joined: Mon May 25, 2015 7:19 pm

Re: New Metro North locos

Postby Backshophoss » Sun Jan 28, 2018 8:42 pm

For WOH,Whatever NJT orders as their GP40P replacement loco,or a batch of SC-44 Chargers.
Backshophoss
 
Posts: 5419
Joined: Mon Mar 05, 2012 7:58 pm

Re: New Metro North locos

Postby SecaucusJunction » Sun Jan 28, 2018 9:17 pm

Gateway tunnel and Bergen Loop
I think it may be possible that NJ Transit might not be the perfect, infallible organization that most people assume it is.
SecaucusJunction
 
Posts: 3053
Joined: Mon Apr 26, 2004 9:40 pm
Location: NS Watchdog

Re: New Metro North locos

Postby DutchRailnut » Sun Jan 28, 2018 9:26 pm

stop fantasizing nothing in planning for WofH , its NJT's problem of maintaining the locomotives.
If Conductors are in charge, why are they promoted to be Engineer???

Retired Triebfahrzeugführer
User avatar
DutchRailnut
 
Posts: 21699
Joined: Thu Mar 11, 2004 8:02 pm
Location: released from Stalag 13

Re: New Metro North locos

Postby SecaucusJunction » Sun Jan 28, 2018 9:46 pm

Ok but it was Metro North who said their plan is for a one-seat ride to Manhattan. With however long this whole process takes, they should probably start thinking about it soon.
I think it may be possible that NJ Transit might not be the perfect, infallible organization that most people assume it is.
SecaucusJunction
 
Posts: 3053
Joined: Mon Apr 26, 2004 9:40 pm
Location: NS Watchdog

Re: New Metro North locos

Postby DutchRailnut » Mon Jan 29, 2018 9:45 am

why the tunnel will take at least another locomotive cycle to be completed.
If Conductors are in charge, why are they promoted to be Engineer???

Retired Triebfahrzeugführer
User avatar
DutchRailnut
 
Posts: 21699
Joined: Thu Mar 11, 2004 8:02 pm
Location: released from Stalag 13

Re: New Metro North locos

Postby F-line to Dudley via Park » Mon Jan 29, 2018 4:13 pm

Tadman wrote:
DutchRailnut wrote:how can there be bidders when a RFP has not been issued yet.


Usually before the RFP, there is an RFI - Request for Information - or RFQ - Request for Qualifications. Those serve to find and narrow down a pool of prospective bidders. At the time the RFP is issued on a major project, there is usually a set pool of bidders out there already. Technically, there aren't officially bidders until the RFP closes, because you don't submit a bid the day the RFP is issued. Usually there's a 90 day window to prepare the bid, and it's not turned in until the last day to keep information from leaking out.

But I'm sure you knew that.


The RFI for the Empire/MNRR/LIRR triple-order was already done 4 years ago. Siemens (dual-mode Charger), Bombardier (third-rail ALP-45DP), and MPI (HSP-46 -derived dual-mode) were the bidders who submitted RFI packages. MPI is almost certainly out of it today because the HSP-46 was such a disaster it pretty much killed their whole passenger biz in the process. So it's effectively a one-on-one Siemens v. BBD duel for the...uh, "dual"...going forward as the technical specs are just too stiff for some other dark horse vendor to plausibly come out of the woodwork with any surprise bid come RFP time.

The RFP has not been issued, nor is it likely to be seen this calendar year. Albany hasn't appropriated any money for it yet. And there are key logistical decisions that have to be made for each road made before they can set target quantities (base + options) for the real RFP...namely: (1) is NYSDOT going to get out of doing engine swaps @ Albany for Empire trains because of new PRIAA ownership rules and thus need to order more duals to cover all schedules end-to-end; (2) how is LIRR going to split its duals vs. straight-diesel quantities, since both EMD fleets are up for simultaneous retirement; and (3) what is MNRR projecting for Penn Station Access-Hudson fleet requirements since the options on this order will have to cover eventual service starts. FY2019 is what they have to aim for on issuing all that documentation if they want to get this procurement in the pipeline before the P32's are ridden completely to dust, but there's still some major existential stuff that has to be decided in the meantime.


People might be confusing this order with the MTA RFP just issued for LIRR work locos and freight fleet replacements for NYAR. The work loco order is badly needed on Long Island, so that's a decent bit of good news. But it's wholly unrelated to the big triple-agency passenger procurement.
F-line to Dudley via Park
 
Posts: 7355
Joined: Fri Mar 11, 2005 7:26 pm
Location: North Cambridge

Re: New Metro North locos

Postby Traingeek3629 » Sat Mar 24, 2018 9:33 am

I'd like new dual-mode locos for the Danbury and Waterbury branches (and SLE if they can't get M8s) with a side of more service to GCT instead of fries and service cuts. :P
TRAIN APPROACHING, PLEASE REMAIN BEHIND THE YELLOW LINE
Traingeek3629
 
Posts: 89
Joined: Sun Feb 18, 2018 9:00 am

Next

Return to MTA Metro-North Railroad and CtDOT Passenger Rail

Who is online

Users browsing this forum: No registered users and 1 guest