Track 200 - GCT

Postby JamesRR » Thu Jan 12, 2017 10:37 am

Searching through the forum, I couldn't find much discussion on this. Track 200 in GCT is the lower level loop return track. From looking at diagrams, was this a lone tunnel bored through the bedrock - meaning, it wasn't in the middle of a large excavation? It was bored simply to bring the loop tracks back around to the approach ladder?

If so - how did one access this from within - were there emergency exit shafts? And what has become of it due to the ESA severing the loop and Mad. Avenue yard?
User avatar
JamesRR
 
Posts: 281
Joined: Thu Jul 10, 2008 3:31 pm

Re: Track 200 - GCT

Postby DutchRailnut » Thu Jan 12, 2017 12:48 pm

track 200 is on eastside and can be reached via service walkways from track 100 all workshops are in between for B&B
If Conductors are in charge, why are they promoted to be Engineer???

Retired Triebfahrzeugführer
User avatar
DutchRailnut
 
Posts: 21202
Joined: Thu Mar 11, 2004 8:02 pm
Location: released from Stalag 13

Re: Track 200 - GCT

Postby Penn Central » Tue Jan 17, 2017 12:35 am

Although the lower level loop has been out of service for many years, track 200 is still in service and was being used frequently when I was still working at Metro-North 10 years ago. There is a platform on the west side of track 200 that is adjacent to the B&B shops that makes the track easily accessible.
User avatar
Penn Central
 
Posts: 466
Joined: Wed Dec 15, 2004 8:19 pm

Re: Track 200 - GCT

Postby JamesRR » Tue Jan 17, 2017 1:26 pm

In the image in the link below, an old Lower Level track plan, I see a huge white square to the left - is that the shop area adjacent to track 200?

And is Track 200 mostly (to the north of that) just running in a tunnel? It doesn't appear to have anything alongside it.

http://www.american-rails.com/images/NYCLOWGCT.jpg
User avatar
JamesRR
 
Posts: 281
Joined: Thu Jul 10, 2008 3:31 pm

Re: Track 200 - GCT

Postby RearOfSignal » Wed Jan 18, 2017 7:29 pm

Yes.
Hurry up and wait at the signal!
User avatar
RearOfSignal
 
Posts: 2519
Joined: Tue Aug 09, 2005 2:31 pm

Re: Track 200 - GCT

Postby CP-4070 » Tue Feb 14, 2017 11:41 am

I think I have read somewhere that it can only be used by trains from the north and not from the south anymore. Therfore it may only be used for storage.
User avatar
CP-4070
 
Posts: 112
Joined: Mon Apr 23, 2012 8:25 am
Location: Munich, Germany

Re: Track 200 - GCT

Postby DutchRailnut » Tue Feb 14, 2017 12:15 pm

you are correct, as all loop tracks on lower level are out of service, the west side of loop tracks is all gone, it is future terminal hall for LIRR.
If Conductors are in charge, why are they promoted to be Engineer???

Retired Triebfahrzeugführer
User avatar
DutchRailnut
 
Posts: 21202
Joined: Thu Mar 11, 2004 8:02 pm
Location: released from Stalag 13

Re: Track 200 - GCT

Postby CP-4070 » Wed Feb 22, 2017 3:10 am

Another thing that came to my mind is a platform that I see between tracks 53 and 53. It is called Adams Platform. What is/was the purpose of it?
User avatar
CP-4070
 
Posts: 112
Joined: Mon Apr 23, 2012 8:25 am
Location: Munich, Germany

Re: Track 200 - GCT

Postby DutchRailnut » Wed Feb 22, 2017 12:06 pm

removed, off topic.
Last edited by DutchRailnut on Thu Feb 23, 2017 7:42 am, edited 1 time in total.
If Conductors are in charge, why are they promoted to be Engineer???

Retired Triebfahrzeugführer
User avatar
DutchRailnut
 
Posts: 21202
Joined: Thu Mar 11, 2004 8:02 pm
Location: released from Stalag 13

Re: Track 200 - GCT

Postby CP-4070 » Thu Feb 23, 2017 3:32 am

Sorry, I meant 53 and 54. I thought that the famous platform is between 61 and 63 and that there is a less famous platform between 53 and 54. Thus, I guess that they both had the same purpose and looked similar?
User avatar
CP-4070
 
Posts: 112
Joined: Mon Apr 23, 2012 8:25 am
Location: Munich, Germany

Re: Track 200 - GCT

Postby DutchRailnut » Thu Feb 23, 2017 7:33 am

so how did this conversation go from 200 on lower level to same old sh*t show of waldorf platform ??
http://www.columbia.edu/~brennan/abandoned/gct61.html
If Conductors are in charge, why are they promoted to be Engineer???

Retired Triebfahrzeugführer
User avatar
DutchRailnut
 
Posts: 21202
Joined: Thu Mar 11, 2004 8:02 pm
Location: released from Stalag 13

Re: Track 200 - GCT

Postby JamesRR » Tue Feb 28, 2017 4:04 pm

Yes - you're on the wrong level!

My post was about Track 200 on the lower level.
User avatar
JamesRR
 
Posts: 281
Joined: Thu Jul 10, 2008 3:31 pm

Re: Track 200 - GCT

Postby andegold » Sun Mar 05, 2017 10:47 am

Well, speaking of sh!tshows, local CBS news this morning rehashed the whole thing while covering the closing of the Waldorf Astoria for renovations and condominium conversion.
andegold
 
Posts: 361
Joined: Tue Nov 18, 2008 12:37 pm