Re: New CR Station for New Balance in Brighton

Postby ns3010 » Mon Dec 07, 2015 4:54 pm

It could also be equipment related to the electric switch lock.
User avatar
ns3010
 
Posts: 1961
Joined: Sun Dec 21, 2008 12:53 pm
Location: MP 226.5

Re: New CR Station for New Balance in Brighton

Postby dbperry » Tue Dec 08, 2015 9:34 am

Monday night (12/7/15), there was a temporary 30 mph speed restriction from CP 4 (QB 4.85) to QB 4.26 (Franklin St / Regina Pizzeria). I didn't hear if that temp speed restriction has been lifted as of this AM.

There is a new 3 light signal tower for CP 4 track 2 eastbound. Not sure why they went from 2 light to 3 light signal? The old 2 light signal tower has been removed. And I don't think they changed the tower for track 1 eastbound - I think it is still 2 lights. The westbound single track CP 4 signal is the 2 light dwarf signal that was previously / originally the signal for the connection from the freight / yard lead into CP 4.

The temporary stop boards on either side of the work zone (eastbound at QB 5.09, Market Street overpass, westbound at QB 4.26) are still in place as of this AM. Track foreman gives permission past them without any trains actually having to stop at them, so they haven't resulted in delays (except for the first day they existed, when they created all sorts of havoc).
Known to Keolis and the MBTA as "Twitter Dave"
Frequently posting about the MBTA Framingham-Worcester line on Twitter: https://twitter.com/FramWorMBTA
Owner of Framingham-Worcester Blog: http://FramWorMBTA.weebly.com/
Maintainer of MBTA schedule archive: http://www.dbperry.net/MBTA/
User avatar
dbperry
 
Posts: 793
Joined: Mon Mar 27, 2006 9:28 pm
Location: Suburbs of Boston

Re: New CR Station for New Balance in Brighton

Postby The EGE » Thu Mar 24, 2016 11:55 pm

Construction is moving fast on the station:
Image
User avatar
The EGE
 
Posts: 2460
Joined: Wed Feb 16, 2011 6:16 pm
Location: Waiting for the N Judah

Re: New CR Station for New Balance in Brighton

Postby Rockingham Racer » Fri Mar 25, 2016 6:12 am

Agreed, and thanks for the update!
User avatar
Rockingham Racer
 
Posts: 2911
Joined: Wed Mar 17, 2004 9:25 pm

Re: New CR Station for New Balance in Brighton

Postby jamesinclair » Mon Mar 28, 2016 10:03 am

Only 2 tracks will be at this location?
jamesinclair
 
Posts: 2164
Joined: Wed Jun 21, 2006 5:22 pm

Re: New CR Station for New Balance in Brighton

Postby The EGE » Mon Mar 28, 2016 11:00 am

That's not entirely clear. The 2007 scoping study definitively included a third track (next to the Pike), but that was also before Beacon Park was vacated. My guess is that the current single track is not in its final position - it is further from the platform to make construction easier - and that a third track can then be added next to it.
User avatar
The EGE
 
Posts: 2460
Joined: Wed Feb 16, 2011 6:16 pm
Location: Waiting for the N Judah

Re: New CR Station for New Balance in Brighton

Postby dbperry » Fri Aug 19, 2016 10:54 am

I spoke to a senior MBTA manager last night and we chatted about Boston Landing. Full write-up here:

viewtopic.php?f=65&t=84242&p=1397641#p1397641

highlights:

Yes, there will be a third track for freight service alongside Boston Landing.

Station stops for Boston Landing will incorporated into Spring 2017 schedule.
Known to Keolis and the MBTA as "Twitter Dave"
Frequently posting about the MBTA Framingham-Worcester line on Twitter: https://twitter.com/FramWorMBTA
Owner of Framingham-Worcester Blog: http://FramWorMBTA.weebly.com/
Maintainer of MBTA schedule archive: http://www.dbperry.net/MBTA/
User avatar
dbperry
 
Posts: 793
Joined: Mon Mar 27, 2006 9:28 pm
Location: Suburbs of Boston

Re: New CR Station for New Balance in Brighton

Postby The EGE » Wed Aug 24, 2016 1:39 pm

A lot of progress since this thread has been active. Steel for all three elevator shafts is up, as is the pedestrian bridge at the west end. The platform is fully in place, and butterfly canopies are up.
User avatar
The EGE
 
Posts: 2460
Joined: Wed Feb 16, 2011 6:16 pm
Location: Waiting for the N Judah

Re: New CR Station for New Balance in Brighton

Postby Rockingham Racer » Thu Aug 25, 2016 7:40 am

Thanks! Keep us posted, if you can! :wink:
User avatar
Rockingham Racer
 
Posts: 2911
Joined: Wed Mar 17, 2004 9:25 pm

Re: New CR Station for New Balance in Brighton

Postby YamaOfParadise » Thu Aug 25, 2016 12:06 pm

Have to say I was a little skeptical/pessimistic about such a private interest doing something like this at first - in no small part because the more public-private kind of deals have a tendency to reek of corruption, or otherwise involve the private entity trying to profit as much off of public $$$ as possible (including doing a sub-par job on the project from contractors). But this really just shows the kind of effectiveness a private entity can accomplish when acting in good faith! Especially with the Beacon Park project being right next door for comparison to something moving at a less than stellar pace.
Consider contributing detailed railway data to OpenStreetMap for use in OpenRailwayMap!
User avatar
YamaOfParadise
 
Posts: 373
Joined: Fri Dec 06, 2013 5:36 pm
Location: Middlesex County, Connecticut

Re: New CR Station for New Balance in Brighton

Postby dbperry » Mon May 22, 2017 9:03 am

Sorry, I'm going to cross-post this three times since it relates to three different threads, and I want folks to be able to find it if searching for particular information.

New blog post: All about Boston Landing grand opening, including track charts, pictures, and some trivia.

http://framwormbta.weebly.com/blog/bost ... ening-more

Regards

Dave
Known to Keolis and the MBTA as "Twitter Dave"
Frequently posting about the MBTA Framingham-Worcester line on Twitter: https://twitter.com/FramWorMBTA
Owner of Framingham-Worcester Blog: http://FramWorMBTA.weebly.com/
Maintainer of MBTA schedule archive: http://www.dbperry.net/MBTA/
User avatar
dbperry
 
Posts: 793
Joined: Mon Mar 27, 2006 9:28 pm
Location: Suburbs of Boston

Previous

Return to Massachusetts Bay Transportation Authority (MBTA)

Who is online

Users browsing this forum: Bing [Bot] and 3 guests