Re: North/South Side Connection

Postby BostonUrbEx » Thu Feb 25, 2010 8:16 am

jamesinclair wrote:
MBTA3247 wrote:
BostonUrbEx wrote:I believe most Grand Junction activity is nearly unpredictable. But CSX brings produce to a market Chelsea every day. I believe you'd catch it 6-7 AM, not sure. But it is definitely daily.


The return trip of that train is (or was a few years ago) around 4-5PM.


It still is.


Yep, it still is. Forgot to mention that. Occasionally I see them returning since I go home later on Tuesdays/Thursdays (4:00-4:30 I'll be going through Sullivan Square) and I'll see a couple CSX locos, but I've never seen them taking anything back.
User avatar
BostonUrbEx
 
Posts: 3603
Joined: Thu Dec 03, 2009 9:55 pm
Location: Winn to MPT 8, Boston to MPN 38, and Hat to Bank

Re: North/South Side Connection

Postby diburning » Thu Feb 25, 2010 6:30 pm

CSX also pulls into the grand junction branch while switching
User avatar
diburning
 
Posts: 2970
Joined: Sat Feb 09, 2008 7:37 pm
Location: Practicing safe CSX by using Three-Step Protection

Re: North/South Side Connection

Postby Finch » Thu Feb 25, 2010 8:22 pm

Thanks for the info guys. And the radio frequency used for moves on that line?
User avatar
Finch
 
Posts: 834
Joined: Fri Nov 11, 2005 4:44 pm
Location: Cambridge, MA

Re: North/South Side Connection

Postby CRail » Thu Feb 25, 2010 8:42 pm

Probably 161.070 which is the CSX Yard channel. 160.800 is the road.
Moderator: Massachusetts Bay Transportation Authority
Avatar:3679A (since wrecked)/3623B (now in service as 3636B).
User avatar
CRail
 
Posts: 2132
Joined: Tue May 18, 2004 8:27 am
Location: Eastie

Re: North/South Side Connection

Postby BostonUrbEx » Fri Mar 05, 2010 4:04 pm

Some people were talking about the freight line running up Atlantic Ave earlier. Stumbled on this after 3rd Rail posted the Arlington signs for sale:

http://www.wardmaps.com/viewasset.php?aid=9627

It is the dashed line running along the streetcar tracks at about South Station, then running between the streetcars at double track after High St and Broad St.

Not very detailed, unfortunately.



EDIT: And here it is running up Causeway Street:

http://www.wardmaps.com/viewasset.php?aid=9628

Seems to end just after Portland, or at least according to this.



2nd EDIT: And the missing link of the above 2 maps, the run through the North End:

http://www.wardmaps.com/viewasset.php?aid=9629
User avatar
BostonUrbEx
 
Posts: 3603
Joined: Thu Dec 03, 2009 9:55 pm
Location: Winn to MPT 8, Boston to MPN 38, and Hat to Bank

Re: North/South Side Connection

Postby MBTA3247 » Fri Mar 05, 2010 4:44 pm

Curious that it doesn't show the actual connection along the east side of North Station. The page for the South End (sheet 30) shows the UFRR heading off the street towards the tracks into South Station.
"The destination of this train is [BEEP BEEP]" -announcement on an Ashmont train.
User avatar
MBTA3247
 
Posts: 2603
Joined: Tue Jul 11, 2006 6:01 pm
Location: Milton

Re: North/South Side Connection

Postby jaymac » Fri Mar 05, 2010 6:28 pm

Surprisingly or not-so-surprisingly, maybe, the 1903 Boston and 1946 Boston South USGS topos at UNH don't show the UFRR, with the possible exception of a spur stopping at Causeway on the 1946. But maybe that was a delivery track for the large bakery that was there into the mid-50s.
"A white SUV with a roof antenna just might not be a company van."
jaymac
 
Posts: 3417
Joined: Wed Mar 04, 2009 1:08 pm

Some historical perspective

Postby djlong » Sun Mar 07, 2010 2:34 pm

I just found a scrapbook I'd been keeping back in the 1990s that has stories concerning the North/South Rail Link among all the other articles I kept.

In order...

2/1/93 - Boston Globe - Amtrak Tries High-Speed Train [The X2000]

2/1/93 - Boston Globe - MBTA officials say they'll consider expansion north [plan call for a new Blue Line branch north of Airport and, get this, possible extension of the Revere terminus all the way to NEWBURYPORT]

4/21/93 - Boston Globe front page - Artery Rail Link proposal expected [says it will cost "up to $1.6B"]

5/6/93 - Boston Globe page 16 - TaskForce: Link stations [article says it'll take 20,000 cars off the road, full plan includes electrifying all commuter rail which would balloon the cost to $3B]

5/8/93 - Boston Herald page 9 - Few changes needed to tie artery, rail link [$93M in engineering changes to the Big Dig will allow for the rail link, Kerasiotes says he won't do it if it slows down Big Dig construction]

5/16/93 - Boston Globe page 21 - Full color proposed map of how the MBTA's commuter rail will be restructured with "run through" lines - Fitchburg to Lakeville, Lowell to Soughton (with arrows to Concord NH and Fall River/New Bedford), Haverhill to Providence (with routing via the Wildcat Junction), North Wilmington to Needham Heights, Newburyport to Worcester, Beverly Depot to Forge Park/Franklin, Rockport to Plymouth. Only the Greenbush and Readville lines don't go beyond South Station. Accompanying story says Gov. Weld appears to want to "go slow"

5/17/93 - Boston Globe page 14 - Centray Artery rai link feasible, federal study says [Federal Transit Administration says it's "technically feasible", meaning there aren't any technical showstoppers]

That's all I have in the notebook but it's an interesting look back.
djlong
 
Posts: 686
Joined: Wed Jan 05, 2005 10:29 am

Re: North/South Side Connection

Postby Diverging Route » Wed Jun 16, 2010 5:50 am

...
In today's Boston Globe article, this comment from Lt. Gov. Murray:

Currently, the Worcester-Framingham line terminates at South Station. But because the state will own transfer facilities in the Allston rail yard, Boston-bound trains could also be redirected to North Station, Murray said, to form a closer connection between the world-class hospitals, universities, and private laboratories in both cities.


Passenger trains over the Grand Junction? Even if the track was upgraded to passenger standards, how long would it take to go over the GJ, navigate BET, and reverse into North Station? I would think the status quo of taking the Orange Line from Back Bay to North Station would be a lot faster.
User avatar
Diverging Route
 
Posts: 1562
Joined: Sat Mar 13, 2004 3:35 pm

Re: North/South Side Connection

Postby BostonUrbEx » Wed Jun 16, 2010 7:34 am

What reverse move? It's a straight shot right into the Fitchburg Line.

Still, the speed restrictions would probably be heavy, and as you said, Orange Line from Back Bay to North Station is probably faster.
User avatar
BostonUrbEx
 
Posts: 3603
Joined: Thu Dec 03, 2009 9:55 pm
Location: Winn to MPT 8, Boston to MPN 38, and Hat to Bank

Re: North/South Side Connection

Postby sully » Wed Jun 16, 2010 9:31 am

Chances are they would do some track upgrades, especially since the grade crossings need to be upgraded. Any work at all will be better than the current speed limit of 20mph.
sully
 
Posts: 11
Joined: Sat Jan 19, 2008 9:15 pm
Location: Boston

Re: North/South Side Connection

Postby frrc » Wed Jun 16, 2010 11:01 am

From reading an article in the Worcester Telegram, the State is intent on purchasing the Grand Junction track, and upgrading it, to allow commuter trains to go to/from the South Side to the North Side in 2012 or so. Trains on the Worcester line will be allowed to goto North Station.

J
Avatar: Self Portrait, Railroad Office
Renaissance Restorations LLC
Leominster, MA 01453

My Sites: Architectual Restorations
User avatar
frrc
 
Posts: 778
Joined: Thu Dec 23, 2004 11:31 am
Location: Leominster, MA

Re: North/South Side Connection

Postby sery2831 » Wed Jun 16, 2010 11:52 am

BostonUrbEx wrote:What reverse move? It's a straight shot right into the Fitchburg Line.


No it's not, it's a straight shot into BET but not the Fitchburg Main. Otherwise your option is going outbound to the Eastern or Western Routes.
Moderator: MBTA Rail Operations
User avatar
sery2831
 
Posts: 5134
Joined: Fri Mar 12, 2004 2:15 pm
Location: Manchester, NH

Re: North/South Side Connection

Postby octr202 » Wed Jun 16, 2010 12:08 pm

Still difficult to see what the advantage to going to a less centrally located station (relative to downtown) than the two currently served, unless its solely a move to free up capacity at South Station. A lot more people work close to BBY and South Station than North Station.

I suspect that the work necessary to upgrade the Grand Junction to passenger standards (track rehab, grade crossing improvements (likely quad gates), probably sound walls in a lot of places near residential properties, and let's not forget PTC (and signals to begin with!) would make putting a direct connection between the GJ and the Fitchburg main inbound look like peanuts in the end. But still doesn't seem to warrant spending the money. The only plus I could think of it adding a Kendall Square area station to serve Cambridge, but that doesn't seem worth making everyone else go around the long way to get to downtown.
Wondering if I'll see the Haverhill double-tracking finished before I retire...
Photo: Melbourne W7 No. 1019 on Route 78, Bridge & Church Streets, Richmond, Victoria. 10/21/2010
User avatar
octr202
 
Posts: 4142
Joined: Fri Mar 12, 2004 8:13 am
Location: In the land of the once and future 73 trackless trolley.

Re: North/South Side Connection

Postby frrc » Wed Jun 16, 2010 1:02 pm

Here's the article/link regarding the Grand Junction Branch proposal:

http://www.telegram.com/article/20100614/NEWS/6140386
Avatar: Self Portrait, Railroad Office
Renaissance Restorations LLC
Leominster, MA 01453

My Sites: Architectual Restorations
User avatar
frrc
 
Posts: 778
Joined: Thu Dec 23, 2004 11:31 am
Location: Leominster, MA