Postby GP40MC1118 » Wed Aug 24, 2016 10:27 am

The 2004 got to Area 52...i.e. Rochester yesterday. Took a unique routing this time:
Into Framingham on CSX Q436, then B725 to Attleboro, B726 to Middleboro, Mass Coastal
to Rochester.

This is the first time a HSP got routed this way. The 2034 went to Worcester, then PW to
Pawtucket, Keolis/T to Readville, then to Middleboro.

D
GP40MC1118
 
Posts: 3162
Joined: Thu Mar 11, 2004 8:06 pm

Re: New MBTA Locomotive Order Discussion (MPI HSP-46)

Postby BandA » Thu Sep 15, 2016 2:28 pm

It is interesting to compare the specifications boxes on Wikipedia between the MPI HSP-46 and the Siemens SC-44 Charger. The HSP-46 appears to have twice the displacement of the SC-44 for almost exactly the same horsepower, despite HSP-46 only having to meet less stringent emissions. Both locomotives are about the same size, but HSP-46 is 8.6% heavier, has a hard-to-believe 38% longer wheelbase and 15% larger minimum curve radius. SC-44 Charger has more powerful HEP provision (longer consists+dining cars).

The "T" should be thinking about what to order next for replacement/expansion given the long lead times (assuming the coach shortage is addressed, lol). Assuming the SC-44's Cummins QSK-95 becomes proven, an ideal order would be something like the Siemens with de-rated trucks to meet a cheaper price point that the T could afford.
BandA
 
Posts: 1505
Joined: Thu Oct 11, 2012 11:47 am

Re: New MBTA Locomotive Order Discussion (MPI HSP-46)

Postby DutchRailnut » Thu Sep 15, 2016 6:16 pm

the SC-44 engine having half displacement but twice RPM.
If Conductors are in charge, why are they promoted to be Engineer???

Retired Triebfahrzeugführer
User avatar
DutchRailnut
 
Posts: 20960
Joined: Thu Mar 11, 2004 8:02 pm
Location: released from Stalag 13

Re: New MBTA Locomotive Order Discussion (MPI HSP-46)

Postby BandA » Fri Sep 16, 2016 2:03 pm

Right, that's the magic sauce and we will know in 2? 5? 10? years whether they hold up. They can always replace the prime mover with a turbine :wink: I didn't look up the cost figures but I think the SC-44 is more $$ than the HSP-46, but that is apples and oranges since the orders were years apart and stuff like included spares differ and the HSP-46 can't be built new.
BandA
 
Posts: 1505
Joined: Thu Oct 11, 2012 11:47 am

Re: New MBTA Locomotive Order Discussion (MPI HSP-46)

Postby F-line to Dudley via Park » Sat Sep 17, 2016 8:28 am

GEVO-12 prime movers are ubiquitous in the freight world. The GE ES44AC and ES44C4 freight locos use it, with those two makes selling a combined 1700+ units to-date rostered on every single Class I in the U.S., Canada, and Mexico. And still in production 13 years after first introduction. It's a flexible enough platform to have Tier 4 variants out now, as well as some alternate-fuel test trials for future variants. There'll be a 50-year parts supply for that prime mover, no doubt. Ditto the GE GEB-15 traction motors, the same ones used for 2 decades on the Genesis P32AC-DM, and the GE 5GMG211 AC alternator. The traction motor replacements when they were first delivered was an installation screw-up, not a component problem.

The only thing custom about the HSP-46 is the component selection/integration, carbody, and software...not the components themselves. It's that systems integration where they're having extended teething problems. Everything else is as generic as it gets. Even if no other railroad buys this make, they will be fully supportable through multiple rebuilds because the component supply is inexhaustible. And you can find second-source vendors to build to the spec if MPI says "no mas". It just may be the same guts in a different carbody with different computers and such, depending on what vendors offer what. We don't have to worry about these becoming dead-end white elephants, and they aren't necessarily consigned to real-world fleet fragmentation if the next loco order has to be something other than a rote HSP-46 refresh. It'll probably be another GEVO-12 / GEB-15 / etc. -derived platform, unless the Chargers/F125's/etc. are so hands-down better an off-shelf buy than another GEVO that systems fragmentation proves too small a concern to worry about.

We also don't have to worry about general build quality making them razorblade fodder at less-than rebuild age like the Brokem coaches because the component selection is tried-and-true. Whether they're long-term worthy is all about success in debugging the integration...particularly the computers. The GP40MC's weren't pieces of crap because the GP40 platform is a piece of crap; Geeps are some of the 20th century's most successful and reliable makes, in both freight and passenger variants. The T just went way too far off-script with the quirky 'MC' computer mods and saddled otherwise bulletproof locos with a "garbage in, garbage out" situation at the control stand. That's the hurdle the HSP's newfangled systems integration has to clear, and stay permanently cleared of without further bug regressions.
F-line to Dudley via Park
 
Posts: 6617
Joined: Fri Mar 11, 2005 7:26 pm
Location: North Cambridge

Re: New MBTA Locomotive Order Discussion (MPI HSP-46)

Postby Arlington » Sun Sep 18, 2016 6:41 am

How ready for winter will the HSPs be?
When I hear the iron horse make the hills echo with his snort like thunder, shaking the earth with his feet, and breathing fire and smoke from his nostrils, it seems as if the earth had got a race now worthy to inhabit it. --H.D. Thoreau, Walden, 1854
Arlington
 
Posts: 3053
Joined: Wed Jun 02, 2004 7:51 am
Location: Medford MA (was Arlington MA and Arlington VA)

Re: New MBTA Locomotive Order Discussion (MPI HSP-46)

Postby DutchRailnut » Mon Sep 19, 2016 8:10 am

as ready as last few winters ?
If Conductors are in charge, why are they promoted to be Engineer???

Retired Triebfahrzeugführer
User avatar
DutchRailnut
 
Posts: 20960
Joined: Thu Mar 11, 2004 8:02 pm
Location: released from Stalag 13

Re: New MBTA Locomotive Order Discussion (MPI HSP-46)

Postby Arlington » Fri Nov 04, 2016 9:05 pm

Hopefully much better (which Is why I asked), because a lot of the trouble seemed to be software/integration issues as F-Line described upthread.
When I hear the iron horse make the hills echo with his snort like thunder, shaking the earth with his feet, and breathing fire and smoke from his nostrils, it seems as if the earth had got a race now worthy to inhabit it. --H.D. Thoreau, Walden, 1854
Arlington
 
Posts: 3053
Joined: Wed Jun 02, 2004 7:51 am
Location: Medford MA (was Arlington MA and Arlington VA)

Re: New MBTA Locomotive Order Discussion (MPI HSP-46)

Postby BandA » Fri Nov 04, 2016 10:08 pm

How is Keolis doing managing BET?
BandA
 
Posts: 1505
Joined: Thu Oct 11, 2012 11:47 am

Re: New MBTA Locomotive Order Discussion (MPI HSP-46)

Postby Trinnau » Sat Nov 05, 2016 9:34 am

Arlington wrote:
DutchRailnut wrote:as ready as last few winters ?

Hopefully much better (which Is why I asked), because a lot of the trouble seemed to be software/integration issues as F-Line described upthread.


Remember 2014-2015 there were only a handful in service, and 2015-2016 was very mild, but they were able to learn enough and have made a lot of the necessary adjustments. So indeed they will be much better. The better question is the learning curve for both the train crews and the mechanics. There have been many times an HSP has "died" line of road, been assisted to Boston, put in the shop and they find nothing wrong with the engine - other than that the crew and trouble desk were unable to resolve the issue due to lack of familiarity. The more these run the better they'll be, but they aren't experts yet like they are with the EMD products that have roamed the system over the last 30 years.

BandA wrote:How is Keolis doing managing BET?


That's a different topic for a different thread. But firing 9 people for stealing time and hiring a whole bunch indicates they are making an effort.
Trinnau
 
Posts: 306
Joined: Thu Sep 16, 2010 7:27 pm

Re: New MBTA Locomotive Order Discussion (MPI HSP-46)

Postby F-line to Dudley via Park » Sat Nov 05, 2016 11:32 am

How are the HSP's holding up after warranty mods? Bugs pounded out? Looking more solid for the long haul? Or still jitters and/or moderate disappointment that they aren't going to live up to the hype?
F-line to Dudley via Park
 
Posts: 6617
Joined: Fri Mar 11, 2005 7:26 pm
Location: North Cambridge

Re: New MBTA Locomotive Order Discussion (MPI HSP-46)

Postby MBTA F40PH-2C 1050 » Wed Nov 16, 2016 1:44 pm

the HSP's are falling apart, little things, but it is very sad to see how these were built. Dials breaking off, chairs broken, bell buttons not working correctly, horn toggles breaking off, door handles breaking off, HVAC not working properly, and let alone how they handle with moisture on the rails....give me an F40 any day
MBTA F40PH-2C 1050
 
Posts: 3473
Joined: Thu Mar 11, 2004 7:57 pm

Re: New MBTA Locomotive Order Discussion (MPI HSP-46)

Postby MEC407 » Wed Nov 16, 2016 6:25 pm

Ouch. Hope that stuff is covered under warranty, and that they get those items repaired/replaced before the warranty runs out...
MEC407
Moderator:
Pan Am Railways — Boston & Maine/Maine Central — Delaware & Hudson
Central Maine & Quebec/Montreal, Maine & Atlantic/Bangor & Aroostook
Providence & Worcester — New England — GE Locomotives
User avatar
MEC407
 
Posts: 10478
Joined: Thu Mar 11, 2004 8:15 pm
Location: Maine, USA

Re: New MBTA Locomotive Order Discussion (MPI HSP-46)

Postby 8th Notch » Wed Nov 16, 2016 10:41 pm

Unfortunately the poor performance under wet conditions is not... I remember all of the hype on how much better the AC traction would perform on them in wet conditions before they arrived, once they arrived big disappointment!
8th Notch
 
Posts: 466
Joined: Fri Jan 17, 2014 1:23 pm

Re: New MBTA Locomotive Order Discussion (MPI HSP-46)

Postby BostonUrbEx » Mon Mar 27, 2017 11:35 pm

Keolis plagued by train, coach issues

Problems not all firm’s fault, but T officials losing patience

http://commonwealthmagazine.org/transpo ... ch-issues/



Snipet of relevance to this particular thread:

... Brian Shortsleeve, the T’s acting general manager and chief administrator, said seven of the T’s new locomotives have suffered turbocharger failures this year. He said those trains are under warranty and repairs will not cost the T anything, but their loss has led to trip cancellations and been disruptive to passengers.

Leslie Aun, the spokeswoman for Keolis, said another new locomotive suffered turbocharger failure on Monday, bringing the total since the beginning of the year to eight. She said the turbochargers, which inject oxygen into the engine, were failing because their fan blades were shattering and they were leaking oil into the engine. Aun said Keolis is repairing the eight turbochargers and plans to change out all of them. ...
User avatar
BostonUrbEx
 
Posts: 3468
Joined: Thu Dec 03, 2009 9:55 pm
Location: Winn to MPT 8, Boston to MPN 38, and Hat to Bank