Merrimack River Bridge in Haverhill

Discussion relating to commuter rail, light rail, and subway operations of the MBTA.

Moderators: CRail, sery2831

Re: Merrimack River Bridge in Haverhill

Postby Trinnau » Wed May 02, 2018 5:22 pm

swist wrote:Is thing done? I crossed on the upriver track again for the first time in a while.


Yes, at least as far as the riding public is concerned. Still work to do underneath, but two tracks back in service full-time.
Trinnau
 
Posts: 425
Joined: Thu Sep 16, 2010 7:27 pm

Re: Merrimack River Bridge in Haverhill

Postby swist » Tue May 15, 2018 8:04 am

And it would appear they've lifted the 15mph speed restriction on the bridge (Not that it would ever go over 30 with a station stop in Haverhill and a 30 or slower limit through the Bradford yard on the other side).

But every bit helps.
swist
 
Posts: 223
Joined: Fri May 09, 2014 4:01 pm
Location: Westport Island, ME

Re: Merrimack River Bridge in Haverhill

Postby jbvb » Thu Jun 28, 2018 9:17 pm

On June 11, looking upstream from The Tap's deck, I could see equipment and a cofferdam on the RR-west (Bradford) pier of the through truss span. Access appeared to be via temporary bridging from the Haverhill side. The former Island Track through girder over Washington St. has been removed, leaving little beside the stone abutment to remember it by. All the steelwork sports shiny, fresh black paint. The stair at the west end of Haverhill's upstream platform remains blocked off.
jbvb
 
Posts: 1300
Joined: Mon Nov 12, 2007 3:50 pm
Location: Rockingham Co., NH

Previous

Return to Massachusetts Bay Transportation Authority (MBTA)

Who is online

Users browsing this forum: BigUglyCat and 7 guests