Beverly Draw- Failure Discussion

Discussion relating to commuter rail, light rail, and subway operations of the MBTA.

Moderators: CRail, sery2831

Re: Beverly Draw- Failure Discussion

Postby jboutiet » Mon Sep 26, 2016 9:26 am

Backshophoss wrote:That 2nd link is a "secure bid" site,that needs a "LOG IN" to see the files,not a "public access" site. :( :( :(
The documents at the right of the page can be downloaded without logging in.
jboutiet
 
Posts: 64
Joined: Mon Jan 29, 2007 1:59 pm

Re: Beverly Draw- Failure Discussion

Postby StefanW » Sat Oct 01, 2016 11:04 am

Backshophoss wrote:That 2nd link is a "secure bid" site,that needs a "LOG IN" to see the files,not a "public access" site. :( :( :(



https://www.bidx.com/mbta/proposal?contid=H62CN02


Screen Shot 2016-10-01 at 11.59.54 AM.png



:-)
User avatar
StefanW
 
Posts: 490
Joined: Wed Aug 18, 2004 8:27 pm
Location: Lynn, MA / MP 11.53

Re: Beverly Draw- Failure Discussion

Postby StefanW » Fri May 26, 2017 11:22 am

Just in case someone finds this old thread, it seems that we should call this one finished and continue further discussion on the new thread:
http://www.railroad.net/forums/viewtopic.php?f=65&t=165123
User avatar
StefanW
 
Posts: 490
Joined: Wed Aug 18, 2004 8:27 pm
Location: Lynn, MA / MP 11.53

Re: Beverly Draw- Failure Discussion

Postby CRail » Sat May 27, 2017 12:25 pm

They're two separate conversations about the same structure, and this one probably wouldn't have resurfaced if it hadn't been brought back up.
Moderator: Massachusetts Bay Transportation Authority
Avatar:3679A (since wrecked)/3623B (now in service as 3636B).
User avatar
CRail
 
Posts: 2132
Joined: Tue May 18, 2004 8:27 am
Location: Eastie

Previous

Return to Massachusetts Bay Transportation Authority (MBTA)

Who is online

Users browsing this forum: blackcap and 5 guests