19 million $$$ for expanded Fitchburg line service

Post by trainhq » Tue Jun 01, 2004 8:30 am

Article today says the T is looking for 19 million to improve Fitchburg line service; maybe even as far
as Gardner! This would be a welcome improvement
for people along Route 2.

http://www.harvardhillside.com/Stories/ ... 13,00.html

RailBus63
Posts: 1877
Joined: Tue May 04, 2004 1:48 pm

19 million $$$ for expanded Fitchburg line service

Post by RailBus63 » Wed Jun 02, 2004 11:23 am

Isn't the single-track section through Waltham the major bottleneck on the line? I don't see how that section can be double-tracked very easily - I think they'd have to take some homes to do that.

JD

caduceus
Posts: 321
Joined: Thu Mar 11, 2004 7:43 pm
Contact:

Post by caduceus » Wed Jun 02, 2004 12:14 pm

They could be talking about Acton-to-Ayer as well, or possibly further out (not sure if its single futher down).

Acton-to-Ayer is doable I think, at least through Littleton, with a possible tight fit at West Acton.

"...upgrading the five miles of antiquated track between Concord and Fitchburg..." It's a bit longer than that... :)
First Law of Public Transportation: You can never be early, but you can always be late.

GP40MC1118
Posts: 3546
Joined: Thu Mar 11, 2004 8:06 pm

Bottleneck

Post by GP40MC1118 » Wed Jun 02, 2004 6:01 pm

The single track through Waltham is not even close to the
bottleneck that S.Acton to CPF-WL (Willows) is. And what
compounds the problem is that S.Acton station is on the
single track.

Dave

TomNelligan
Posts: 3298
Joined: Fri Mar 12, 2004 5:43 pm
Location: Massachusetts

Post by TomNelligan » Wed Jun 02, 2004 8:06 pm

The Waltham single track section is less than a mile long and seldom causes delays of more than a minute or two. The eight miles between South Acton and Willows were formerly double track (until the 1960s) so unless there's been right-of-way encroachment there should be room to restore the second main.

caduceus
Posts: 321
Joined: Thu Mar 11, 2004 7:43 pm
Contact:

Post by caduceus » Wed Jun 02, 2004 9:01 pm

I assume the notch right before S. Acton going outbound, where it intially turns single track, will be a bottleneck - I'm not sure there's room for two there, but I've only seen it from inside the train.

Part of the pain of the single track is that S. Acton is also a terminus for several of the trains - thus blocking all traffic while waiting for turnaround, lmiting the schedule. There is no outbound train between 1:20pm (or therabouts) and 4:40pm that goes past S. Acton.

They'd probably have to rebuild the platform at Littleton again to push it back, or finally move it like they've been talking about.

I did take a late outbound train that had to halt at Waltham due to a signal - for quite a while. Apparently the controller forgot about us...
First Law of Public Transportation: You can never be early, but you can always be late.

atkelly

Post by atkelly » Thu Jun 10, 2004 12:59 pm

I imagine some of the money in the bond would go to Build the Littleton/495 station that keeps getting talked about. When the last itteration of that plan was being pushed, the design called for extending the double track from South Acton to the new station. The South Acton turn would also have been pushed out to Littleton.

eddiebear

19 million for expanded Fitchburg Line service

Post by eddiebear » Thu Jun 10, 2004 1:16 pm

That Waltham section was double track until about 1960. Single track and centered to accomodate autoracks (B & M carried American Motors cars into Boston for a few yrs. to KAT Yard - Kenosha Auto Transport.) Piggybacks had already run through there for a few yrs. and they were growing larger too.
The South Acton-Willows section was single tracked about 1965-66 after the big reduction in service west of South Acton. There was a lengthy middle siding, 110 cars or so, South Acton-West Acton that ran through both the Martin and Central Street crossings.
I seem to think a consultant has already done some very preliminary engineering regarding restoration of a second main track west of South Acton. My friends in railroad engineering departments have told me that restoring a double track is fairly easy. Engineering a double on a line built as single is much more difficul.