Assembly Square Orange Line Station Discussion

Discussion relating to commuter rail, light rail, and subway operations of the MBTA.

Moderators: CRail, sery2831

Re: Upcoming Orange Line Shuttle

Postby rethcir » Tue Apr 05, 2011 1:40 pm

This seems like an unacceptably long service disruption that would be a huge negative to the transit system, far outweighing the benefit of the one new stop. Headways are so long on the orange line anyway I don't know why a single track couldn't be kept live and suffice.
rethcir
 
Posts: 182
Joined: Fri Nov 30, 2007 9:51 am

Re: Upcoming Orange Line Shuttle

Postby gallja02 » Tue Apr 05, 2011 9:23 pm

And what would happen with Wellington? How could they sever the whole line from the maintenance/storage base for 3 years?
gallja02
 
Posts: 48
Joined: Thu Apr 14, 2005 7:27 pm
Location: PA/MA

Re: Upcoming Orange Line Shuttle

Postby dieciduej » Wed Apr 06, 2011 2:48 am

The only things I have heard is that they will be running nighttime and weekend bus shuttles while the Assembly Sq station is being constructed. This is like the process for wiring the north side of the Orange Line for ATO. There is a possibility of the third/test track being used for operation, taking the southbound out of service, in other words shifting. Nothing has been finalized since the IKEA project seems to be in a state of suspended animation or extreme slow-mo. A shuttle that massive will usually require it to start at the time of the next rating, middle/end of June, beginning of September and so on and as far as I can tell nothing is on the radar screen for the summer rating.

JoeD
User avatar
dieciduej
 
Posts: 549
Joined: Tue May 09, 2006 9:37 am

Re: Upcoming Orange Line Shuttle

Postby CRail » Thu Apr 07, 2011 4:34 pm

Quote from another thread:
BostonUrbEx wrote:Assembly Sq will be built from scratch in a projected 3 years with only night/weekend shutdowns.

Where did you hear this?
Moderator: Massachusetts Bay Transportation Authority
Avatar:3679A (since wrecked)/3623B (now in service as 3636B).
User avatar
CRail
 
Posts: 2122
Joined: Tue May 18, 2004 8:27 am
Location: Eastie

Re: Upcoming Orange Line Shuttle

Postby BostonUrbEx » Thu Apr 07, 2011 5:07 pm

CRail wrote:Quote from another thread:
BostonUrbEx wrote:Assembly Sq will be built from scratch in a projected 3 years with only night/weekend shutdowns.

Where did you hear this?


Basing it purely off whatever word someone in this thread has heard, simply for the sake of bashing a 3 year shutdown of Government Center. Cannot locate the particular post at the moment.
User avatar
BostonUrbEx
 
Posts: 3587
Joined: Thu Dec 03, 2009 9:55 pm
Location: Winn to MPT 8, Boston to MPN 38, and Hat to Bank

Re: Upcoming Orange Line Shuttle

Postby CRail » Thu Apr 07, 2011 7:06 pm

I ask out of interest, because I'm curious as to how the shuttle will work myself, not to challenge the integrity of your statement. I was just wondering if it was hearsay or if that was stated in an article or announcement somewhere.
Moderator: Massachusetts Bay Transportation Authority
Avatar:3679A (since wrecked)/3623B (now in service as 3636B).
User avatar
CRail
 
Posts: 2122
Joined: Tue May 18, 2004 8:27 am
Location: Eastie

Re: Upcoming Orange Line Shuttle

Postby Arlington » Wed Sep 07, 2011 11:25 am

dieciduej wrote:The only things I have heard is that they will be running nighttime and weekend bus shuttles while the Assembly Sq station is being constructed. This is like the process for wiring the north side of the Orange Line for ATO. There is a possibility of the third/test track being used for operation, taking the southbound out of service, in other words shifting. Nothing has been finalized since the IKEA project seems to be in a state of suspended animation or extreme slow-mo. A shuttle that massive will usually require it to start at the time of the next rating, middle/end of June, beginning of September and so on and as far as I can tell nothing is on the radar screen for the summer rating.


So the Assembly Square station was put out to bid in May, with responses due August 24th...any update on what's next? How many responses did they get?

Original solicitation of bids (from May '11) found here:
http://www.mbta.com/business_center/bid ... /?cbid=193
"Trying to solve congestion by making roadways wider is like trying to solve obesity by buying bigger pants."--Charles Marohn
Arlington
 
Posts: 3209
Joined: Wed Jun 02, 2004 7:51 am
Location: Medford MA (was Arlington MA and Arlington VA)

Re: Upcoming Orange Line Shuttle

Postby SM89 » Wed Sep 07, 2011 12:43 pm

Arlington wrote:
dieciduej wrote:The only things I have heard is that they will be running nighttime and weekend bus shuttles while the Assembly Sq station is being constructed. This is like the process for wiring the north side of the Orange Line for ATO. There is a possibility of the third/test track being used for operation, taking the southbound out of service, in other words shifting. Nothing has been finalized since the IKEA project seems to be in a state of suspended animation or extreme slow-mo. A shuttle that massive will usually require it to start at the time of the next rating, middle/end of June, beginning of September and so on and as far as I can tell nothing is on the radar screen for the summer rating.


So the Assembly Square station was put out to bid in May, with responses due August 24th...any update on what's next? How many responses did they get?

Original solicitation of bids (from May '11) found here:
http://www.mbta.com/business_center/bid ... /?cbid=193


Looks like they got 9 bidders with the apparent low bidder being S&R at $29.2 million. The estimate was $32.8 million

http://www.mbta.com/business_center/bid ... er=S32CN01
SM89
 
Posts: 347
Joined: Wed Nov 17, 2010 12:45 pm
Location: Mission Hill, MA

Re: Upcoming Orange Line Shuttle

Postby BostonUrbEx » Wed Sep 07, 2011 4:34 pm

Has S&R done work for the MBTA before (if so, what projects? so we can take a look at their quality)? I've not heard of them before.
User avatar
BostonUrbEx
 
Posts: 3587
Joined: Thu Dec 03, 2009 9:55 pm
Location: Winn to MPT 8, Boston to MPN 38, and Hat to Bank

Re: Upcoming Orange Line Shuttle

Postby Arlington » Wed Sep 07, 2011 4:43 pm

BostonUrbEx wrote:Has S&R done work for the MBTA before (if so, what projects? so we can take a look at their quality)? I've not heard of them before.

I think that's the next step: starting at the bottom and knocking people off based on qualifications until they get to the lowest qualified bidder. Conti (at $46m) is clearly there just to make the other ones look good ;-)
"Trying to solve congestion by making roadways wider is like trying to solve obesity by buying bigger pants."--Charles Marohn
Arlington
 
Posts: 3209
Joined: Wed Jun 02, 2004 7:51 am
Location: Medford MA (was Arlington MA and Arlington VA)

Re: Upcoming Orange Line Shuttle

Postby obienick » Thu Sep 08, 2011 12:25 am

You want to take a look at their quality? Drive down Rte 62 in North Reading. Curves are banked in the wrong direction, incorrect surveying of electric poles, sections of road in multiple places designed for a third turning lane were not built wide enough so they had to be repainted so it looks like you have one of Kramer's "executive lanes", huge swath of bumps in pavement only of which about a quarter was repaired by them, and the new bridge over the Ipswich River failed its concrete test on one side of the bridge twice before the Rep. Brad Jones placed a phone call, and it miraculously passed the next day. Over budget. Delay after delay.

Concerning work on the T, they're currently working on the stations on the Fairmont Line. They are the modern Modern Continental. It's sad they keep getting chosen and it's even sadder there is not quality requirement on these bids.
obienick
 
Posts: 380
Joined: Mon May 21, 2007 7:30 pm
Location: NY

Re: Upcoming Orange Line Shuttle

Postby SM89 » Thu Sep 08, 2011 9:46 am

Arlington wrote:
BostonUrbEx wrote:Has S&R done work for the MBTA before (if so, what projects? so we can take a look at their quality)? I've not heard of them before.

I think that's the next step: starting at the bottom and knocking people off based on qualifications until they get to the lowest qualified bidder. Conti (at $46m) is clearly there just to make the other ones look good ;-)


In this economy, I don't see how some of these contractors expected to get the job bidding more than the estimate, as it's based on today's average costs.
SM89
 
Posts: 347
Joined: Wed Nov 17, 2010 12:45 pm
Location: Mission Hill, MA

Re: Upcoming Orange Line Shuttle

Postby Arlington » Thu Sep 08, 2011 10:16 am

SM89 wrote:In this economy, I don't see how some of these contractors expected to get the job bidding more than the estimate, as it's based on today's average costs.
It makes me question the estimate. These are serious, hungry competitors looking to keep the machines busy. I think it is fairly telling that none but S&R felt they could bid under the estimate. What did they see in the work description that the MBTA didn't? Given S&R's bad highway work, I might pick someone at the $34m-ish mark and ask them to do some value engineering.
"Trying to solve congestion by making roadways wider is like trying to solve obesity by buying bigger pants."--Charles Marohn
Arlington
 
Posts: 3209
Joined: Wed Jun 02, 2004 7:51 am
Location: Medford MA (was Arlington MA and Arlington VA)

Re: Upcoming Orange Line Shuttle

Postby rethcir » Thu Sep 08, 2011 11:18 am

Why does this work block the use of the tracks? Can't they keep one track open at a time while they work on the other platform?

Also, does anyone know if this project is going to take away the express track (and as such any hope of a sensible modern express service to wakefield/reading)? The way the T does things, I'm guessing yes.
rethcir
 
Posts: 182
Joined: Fri Nov 30, 2007 9:51 am

Re: Upcoming Orange Line Shuttle

Postby SM89 » Thu Sep 08, 2011 12:31 pm

Arlington wrote:
SM89 wrote:In this economy, I don't see how some of these contractors expected to get the job bidding more than the estimate, as it's based on today's average costs.
It makes me question the estimate. These are serious, hungry competitors looking to keep the machines busy. I think it is fairly telling that none but S&R felt they could bid under the estimate. What did they see in the work description that the MBTA didn't? Given S&R's bad highway work, I might pick someone at the $34m-ish mark and ask them to do some value engineering.


Actually the bid comparison is listed there too. It shows the engineer's estimate and what every bidder bid for each item. http://www.mbta.com/business_center/bid ... 32CN01.pdf

EDIT: and of course the station was lump sum...
SM89
 
Posts: 347
Joined: Wed Nov 17, 2010 12:45 pm
Location: Mission Hill, MA