Re: Upcoming Orange Line Shuttle

Postby Ron Newman » Sat Apr 02, 2011 11:36 pm

If this is going to be a side-platform station, would they need to disrupt service at all?
Ron Newman
 
Posts: 2772
Joined: Mon Apr 26, 2004 7:04 pm
Location: Davis Square, Somerville, MA

Re: Upcoming Orange Line Shuttle

Postby sery2831 » Sat Apr 02, 2011 11:46 pm

All the diagrams I have seen show it as a center platform.
Moderator: MBTA Rail Operations
User avatar
sery2831
 
Posts: 5127
Joined: Fri Mar 12, 2004 2:15 pm
Location: Manchester, NH

Re: Upcoming Orange Line Shuttle

Postby Disney Guy » Sun Apr 03, 2011 6:43 am

This shuttle arrangement would be a lot less disruptive it they would run the trains much more frequently during the off hours. Including every six minutes instead of 13.5 minuts all day and evening Sunday. Go to two car trains if needed.

Buses would then need to run just from Sullivan Square to Wellington in this example.
(To the theater stage manager) Quit twiddling the knob and flickering the lights while the audience is entering and being seated. (To the subway motorman) Quit twiddling the knob and dinging the doors while passengers are getting off and others are waiting to board.
User avatar
Disney Guy
 
Posts: 785
Joined: Thu Apr 19, 2007 9:10 am
Location: Nashua, NH

Re: Upcoming Orange Line Shuttle

Postby dieciduej » Sun Apr 03, 2011 10:20 am

I think the IKEA/Assembly Sq project has to get going first before there is bustitution on the Orange Line. From what I am seeing and hearing the project has slowed with the economy being what it is. I would want to see some building taking place before a station is started otherwise it would be a station like Bowdoin with little traffic.

And why three years this is IKEA they should be able to make an easy to assemble transit station!

JoeD
User avatar
dieciduej
 
Posts: 549
Joined: Tue May 09, 2006 9:37 am

Re: Upcoming Orange Line Shuttle

Postby diburning » Sun Apr 03, 2011 8:39 pm

What ever happened to building the Ikea and the Assembly Square station? They leveled the buildings and now it's just an empty field that's breeding weeds.
User avatar
diburning
 
Posts: 2964
Joined: Sat Feb 09, 2008 7:37 pm
Location: Practicing safe CSX by using Three-Step Protection

Re: Upcoming Orange Line Shuttle

Postby dieciduej » Mon Apr 04, 2011 3:05 am

Economy! The original plans were drawn up in the boom period now its the bust period, much like the Filene's project in Downtown Crossing. It has slowed down considerably but as far as I can tell it is not dead, yet. One benefit for Somerville was that they used the land to dump this winter's snows. Funny when approach the Wellington Bridge on the Somerville side the little of the hugh snow mounds left show, a park bench, a few battered metal recycling container like you would find on a street corner, some bikes and so on. They are more aggressive in Somerville with snow removal.

Like I said earlier I hope they do not build the new station then have IKEA or the project backers pull out of the deal. Sort of a station to now where.

JoeD
User avatar
dieciduej
 
Posts: 549
Joined: Tue May 09, 2006 9:37 am

Re: Upcoming Orange Line Shuttle

Postby Disney Guy » Mon Apr 04, 2011 7:05 am

Aren't there some private funds in the Assembly Square station project, such as from IKEA?

If so, that could establish a timetable where the construction has to take place even though the commercial development isn't there yet.

But that would be an advantage because if the project backers don't follow through, then they leave money behind in the station and others will enjoy the station.
(To the theater stage manager) Quit twiddling the knob and flickering the lights while the audience is entering and being seated. (To the subway motorman) Quit twiddling the knob and dinging the doors while passengers are getting off and others are waiting to board.
User avatar
Disney Guy
 
Posts: 785
Joined: Thu Apr 19, 2007 9:10 am
Location: Nashua, NH

Re: Upcoming Orange Line Shuttle

Postby diburning » Mon Apr 04, 2011 7:35 am

Even if Ikea backs out, the Assembly Square Mall is a block away.
User avatar
diburning
 
Posts: 2964
Joined: Sat Feb 09, 2008 7:37 pm
Location: Practicing safe CSX by using Three-Step Protection

Re: Upcoming Orange Line Shuttle

Postby BostonUrbEx » Mon Apr 04, 2011 9:11 am

This isn't all about Ikea, either, as hundreds of thousands of square feet of retail and offices (maybe some residential???) are going to built. Ikea is only thrown out there because their the largest company to "promise" they'll open. If the offices are to be built because of the station, I doubt they'll care if Ikea backs out, people will rent the offices still whether or not Ikea is there.
User avatar
BostonUrbEx
 
Posts: 3587
Joined: Thu Dec 03, 2009 9:55 pm
Location: Winn to MPT 8, Boston to MPN 38, and Hat to Bank

Re: Upcoming Orange Line Shuttle

Postby FP10 » Mon Apr 04, 2011 3:46 pm

I wish instead of ploping the ikea behind the home depot in that corner the MBTA would give them the air rights over the tracks. It would really be a win-win. The MBTA would get a shell to build a station inside of, the assembly square project would get more land to build mixed use buildings on, and the weedy mess around the tracks that is there will be covered up. Ikeas tend to be built on sticks over parking anyway, so I dont really see how much of a difference it would make whether it is built over train tracks or a parking garage.

Image

^You can see the ikea could just be moved back over the tracks. Also as mentioned, there is apparently plans to have retail and residential in the works. Although seeing how blah the existing stuff they have put up is, I dont really know who would want to live there.
"even a money tree would draw opposition in Boston "
FP10
 
Posts: 340
Joined: Wed Apr 23, 2008 9:09 am

Re: Upcoming Orange Line Shuttle

Postby BostonUrbEx » Mon Apr 04, 2011 4:42 pm

IMO, right where Ikea is, somebody should be utilizing the great freight access that is there. Those two old stubs do nothing but hold work train cars, and with the Green Line extension, the work train staging area has got to move, so the tracks will be opened up. One could be turned into a path (as Somerville has been trying to do, I think) and the other used to serve whatever goes in where Ikea is supposed to. Ikea seems to just be passing up the opportunity without even noticing.

But I don't think Ikea would prefer to move to air rights at all, access would probably be a lot harder. They could have escalators and elevators, but I'm sure they want to keep as much on the first floor as possible.
User avatar
BostonUrbEx
 
Posts: 3587
Joined: Thu Dec 03, 2009 9:55 pm
Location: Winn to MPT 8, Boston to MPN 38, and Hat to Bank

Re: Upcoming Orange Line Shuttle

Postby SM89 » Mon Apr 04, 2011 9:34 pm

ugh 3 years would be horrible. they should open oak grove to commuter rail if they do.
Last edited by SM89 on Tue Apr 05, 2011 1:28 pm, edited 1 time in total.
SM89
 
Posts: 347
Joined: Wed Nov 17, 2010 12:45 pm
Location: Mission Hill, MA

Re: Upcoming Orange Line Shuttle

Postby Stmtrolleyguy » Tue Apr 05, 2011 2:47 am

BostonUrbEx wrote:IMO, right where Ikea is, somebody should be utilizing the great freight access that is there. Those two old stubs do nothing but hold work train cars, and with the Green Line extension, the work train staging area has got to move, so the tracks will be opened up. One could be turned into a path (as Somerville has been trying to do, I think) and the other used to serve whatever goes in where Ikea is supposed to. Ikea seems to just be passing up the opportunity without even noticing.

But I don't think Ikea would prefer to move to air rights at all, access would probably be a lot harder. They could have escalators and elevators, but I'm sure they want to keep as much on the first floor as possible.



Have you been to the Ikea in Stoughton before?
Just FYI, the entire store is built over the parking garage. The garage is ground level, the checkout/warehouse/shopping floor is above that, and the display floor is on top of that. Ikea is no stranger to building up, or using elevators and escalators.

It would be kinda neat to be able to shop for furniture and look through a window in the floor and see and orange line train rumbling through though. . . . . .


I'd also wonder if in some future time, the Orange Line itself might move over a little bit, to where the staging/freight car storage tracks are to allow the commuter rail to gain a track or two to allow easier access to/from North Station?
Stmtrolleyguy
 
Posts: 214
Joined: Mon Jun 11, 2007 4:48 pm
Location: Boston, MA

Re: Upcoming Orange Line Shuttle

Postby diburning » Tue Apr 05, 2011 10:59 am

Yes, I have been to that Ikea. It's larger than a Wal Mart Supercenter. If you get lost, you'll be tired by the time you find your way out!
User avatar
diburning
 
Posts: 2964
Joined: Sat Feb 09, 2008 7:37 pm
Location: Practicing safe CSX by using Three-Step Protection

Re: Upcoming Orange Line Shuttle

Postby FP10 » Tue Apr 05, 2011 12:27 pm

BostonUrbEx wrote:But I don't think Ikea would prefer to move to air rights at all, access would probably be a lot harder. They could have escalators and elevators, but I'm sure they want to keep as much on the first floor as possible.


I guess I said it badly, but as mentioned most ikeas showrooms are on the second, if not third floor of the complex. Of the three I've been to they are all set up this way.

I like the idea of the space being used for some kind of industrial use, but once the station is built that land will probably become too valuable for that use.
"even a money tree would draw opposition in Boston "
FP10
 
Posts: 340
Joined: Wed Apr 23, 2008 9:09 am