F40PH-2C/F40PHM-2C overhaul program

Discussion relating to commuter rail, light rail, and subway operations of the MBTA.

Moderators: CRail, sery2831

Re: F40PH-2C/F40PHM-2C overhaul program

Postby GP40MC1118 » Tue Mar 27, 2018 9:29 pm

I think the HSP T logo is way too big. I'd prefer a slightly smaller version, but the big
circle T is certainly better than the anemic small subway sized logo.

D
GP40MC1118
 
Posts: 3437
Joined: Thu Mar 11, 2004 8:06 pm

Re: F40PH-2C/F40PHM-2C overhaul program

Postby Bramdeisroberts » Tue Mar 27, 2018 9:51 pm

Mbtagp40mc wrote:Still have the rendering?


Here it is:
Image

And I agree, the giant T is too big on the HSP's, while the T on the lightning stripe design is so small that it looks like an afterthought. That said, it's a piece of graphic design that scales well and I'd rather see it too big than too small, as there's at least precedent with the size of the logo on more recent stations like the Southwest Corridor and the Red Line extensions. Too bad they can't find that goldilocks zone for it, though.
Bramdeisroberts
 
Posts: 349
Joined: Sat Feb 15, 2014 2:45 pm

Re: F40PH-2C/F40PHM-2C overhaul program

Postby nomis » Wed Mar 28, 2018 7:19 am

And yet, the people have voted for the big T on the HSP. :-)
Moderator: Metro-North (with CDOT), Photography & Video

Avatar: An overnight trip on Girard Ave. stumbles upon 6 PCC's and an LRV stuck within two blocks.
User avatar
nomis
 
Posts: 2077
Joined: Fri Jan 02, 2009 1:52 pm
Location: MRS 43 (was QA 9 & QB 2)

Re: F40PH-2C/F40PHM-2C overhaul program

Postby Bramdeisroberts » Wed Mar 28, 2018 7:47 am

Only because the other T was microscopic. They needed something in the middle!
Bramdeisroberts
 
Posts: 349
Joined: Sat Feb 15, 2014 2:45 pm

Re: F40PH-2C/F40PHM-2C overhaul program

Postby Mbtagp40mc » Sun May 06, 2018 9:55 pm

Anyone have updates on where in the rebuilding process these are? The first locomotive was scheduled to be back in March. I wonder if the units were in worse shape than originally thought.
Mbtagp40mc
 
Posts: 34
Joined: Wed May 24, 2017 3:47 pm

Re: F40PH-2C/F40PHM-2C overhaul program

Postby GP40MC1118 » Mon May 07, 2018 11:27 am

None show on various traces. All of them except the 1075 got to Boise in November.
No privy to what kind of backlog or where they stand in the queue at MPI.

D
GP40MC1118
 
Posts: 3437
Joined: Thu Mar 11, 2004 8:06 pm

Re: F40PH-2C/F40PHM-2C overhaul program

Postby chrisf » Mon May 21, 2018 1:49 pm

I heard a passing mention in today's FMCB meeting that these engines aren't due to return until October. That date seems pretty ridiculously slow to me, but in the absence of other information, I guess that's what we have to go with.
chrisf
 
Posts: 303
Joined: Sat Apr 24, 2004 9:35 pm

Re: F40PH-2C/F40PHM-2C overhaul program

Postby GP40MC1118 » Mon May 21, 2018 5:02 pm

The 1035 snuck out on CSX last week and on the way to MPI/Boise.

D
GP40MC1118
 
Posts: 3437
Joined: Thu Mar 11, 2004 8:06 pm

Re: F40PH-2C/F40PHM-2C overhaul program

Postby Mbtagp40mc » Thu Aug 30, 2018 7:07 am

Any idea on the status of these?
Mbtagp40mc
 
Posts: 34
Joined: Wed May 24, 2017 3:47 pm

Re: F40PH-2C/F40PHM-2C overhaul program

Postby Type 7 3684 » Thu Aug 30, 2018 5:25 pm

NETransit says the first unit is due back in September.
Type 7 3684
 
Posts: 358
Joined: Fri Sep 25, 2015 3:36 pm
Location: Newton, MA

Re: F40PH-2C/F40PHM-2C overhaul program

Postby GP40MC1118 » Mon Sep 03, 2018 3:15 pm

Nothing on the traces, not even waybill reported...

D
GP40MC1118
 
Posts: 3437
Joined: Thu Mar 11, 2004 8:06 pm