Work Trains / Equipment Moves

Discussion relating to commuter rail, light rail, and subway operations of the MBTA.

Moderators: CRail, sery2831

Re: Work Trains / Equipment Moves

Postby Arborwayfan » Tue Apr 04, 2017 8:28 am

I think it's a solar panel to power the remote-controlled hopper doors.
Arborwayfan
 
Posts: 655
Joined: Thu Jul 15, 2004 11:27 am
Location: Terre Haute, Indiana

Re: Work Trains / Equipment Moves

Postby dieciduej » Tue Apr 04, 2017 5:23 pm

Arborwayfan wrote:I think it's a solar panel to power the remote-controlled hopper doors.


Since it is not in a most efficient place for a solar panel. In the words of Chief Brody "You're gonna need a bigger solar panel." I hope they have are air powered or some other backup.

JoeD
User avatar
dieciduej
 
Posts: 557
Joined: Tue May 09, 2006 9:37 am

Re: Work Trains / Equipment Moves

Postby MBTA3247 » Tue Apr 04, 2017 10:14 pm

I believe the solar panels power solenoids that control pneumatic actuators on the doors. Not much power is needed for those.
"The destination of this train is [BEEP BEEP]" -announcement on an Ashmont train.
User avatar
MBTA3247
 
Posts: 2609
Joined: Tue Jul 11, 2006 6:01 pm
Location: Milton

Previous

Return to Massachusetts Bay Transportation Authority (MBTA)

Who is online

Users browsing this forum: BigUglyCat and 3 guests