Re: South Station Expansion Project Discussion

Postby trainhq » Wed Mar 27, 2013 8:50 am

Well, I think the real question about South Station expansion is, how much more can actually
be done without FR/NB CR added in? I mean, what else is really important here; can they
get in a few more Worcester trains without it? Could they put in a wye (not cheap, obviously,
but still doable) and have some Indigo line trains turn at Back Bay? The point of it is, if FR/NB
is the driving element here,that's another $800 million on top of $2 billion, which is like, not
going to happen.
trainhq
 
Posts: 774
Joined: Mon Mar 15, 2004 12:07 pm

Re: South Station Expansion Project Discussion

Postby F-line to Dudley via Park » Wed Mar 27, 2013 9:44 am

trainhq wrote:Well, I think the real question about South Station expansion is, how much more can actually
be done without FR/NB CR added in? I mean, what else is really important here; can they
get in a few more Worcester trains without it? Could they put in a wye (not cheap, obviously,
but still doable) and have some Indigo line trains turn at Back Bay? The point of it is, if FR/NB
is the driving element here,that's another $800 million on top of $2 billion, which is like, not
going to happen.


FR/NB is most definitely not the driving element. The schedule today has so many conflicting movements in and out on the lead tracks that many trains have to hog the platforms as de facto layovers between runs. It puts a very low ceiling on non-revenue moves in/out of Widett Circle during peak hours, the potential Fairmount schedule, the minor branch schedules, and even Worcester when Amtrak and Providence/Stoughton have to fan out into other lines' usual platform slots. They won't be able to realize full >2020 Amtrak, Providence/points-south, Worcester, and Fairmount service levels without it. The expanded station and additional crossovers help things the most by eliminating conflicting movements. I don't know how many simultaneous moves that allows...the proposed track charts will tell that story...but you can pretty much have an Old Colony or Fairmount in-transit from a platform at the same time as a Widett equipment move, an NEC, and a Worcester without any of them ever having to use the same track or pause for a conflicting movement. 4-6 simultaneous unimpeded movements or something like that where they'd be hard-pressed to have half that today.

The capacity increase will future-proof for full-blast Cape service, FR/NB, Foxboro, increased Franklin service if it went to Milford...and up to 1 more TBD branchline (Northboro-via-Framingham?). But the design isn't predicated on that because those are all branchlines. All the spoils could go to the existing alpha dog routes for dizzyingly frequent schedules. The goal of the expansion is realizing the theoretical max capacity of all the mainlines feeding the station--NEC, Worcester, Fairmount, Old Colony--and de-clogging the layover situation so equipment moves can shuttle at-will out of Widett/Southampton without having to lay over on the platforms because of conflicts on the lead tracks. Where the traffic fans out on the mains, what % gets allocated to the branches or Amtrak...that has nothing to do with SS. This just allows them to throw all the traffic at the mains (including restored tri/quad-tracking on the NEC out to Canton Jct., restored full double-track on the OC main, etc.) that those mains can truly handle...something SS was originally designed to do but hasn't been able to since it was chopped in half.
F-line to Dudley via Park
 
Posts: 6919
Joined: Fri Mar 11, 2005 7:26 pm
Location: North Cambridge

Re: South Station Expansion Project Discussion

Postby Teamdriver » Wed Mar 27, 2013 11:45 am

They have to knock out the PO , put a rail bridge over the channel , take over whatever Gillett doesnt use on A street, and create a transportation complex, all the way down to Summer street. Lock it up, its progress!
User avatar
Teamdriver
 
Posts: 953
Joined: Sat Jul 19, 2008 3:18 pm

Re: South Station Expansion Project Discussion

Postby 3rdrail » Wed Mar 27, 2013 12:14 pm

Teamdriver wrote:They have to knock out the PO , put a rail bridge over the channel , take over whatever Gillett doesnt use on A street, and create a transportation complex, all the way down to Summer street. Lock it up, its progress!

In the 1800's ! We've gone three steps backward, now we're going one step forward !
~Paul Joyce~
[i]Moderator: Toy Trains, Model Railroading, Outdoor and Live Steam

Paul Joyce passed away in August, 2013. We honor his memory and his devotion at railroad.net.
User avatar
3rdrail
 
Posts: 5641
Joined: Thu Jun 29, 2006 11:10 pm
Location: Boston

Re: South Station Expansion Project Discussion

Postby Teamdriver » Sun Apr 14, 2013 8:45 am

Dont know really where to place this , but on CBS this morning was a segment of the expansion of the subway in Manhattan, and here is the link to the pictures, submitted as a comparative to whatever could happen in Boston ...

Building NYC's Second Ave. Subway

http://www.cbsnews.com/2300-3445_162-10013078.html
User avatar
Teamdriver
 
Posts: 953
Joined: Sat Jul 19, 2008 3:18 pm

Re: South Station Expansion Project Discussion

Postby kenmedford » Mon Jun 10, 2013 2:16 pm

The MassDOT blog has a piece with some interesting tidbits about the history of South Station, which once featured a 550-seat cinema that later was converted into Our Lady of Railways Chapel, and a subterranean “ghost terminal” that proved unusable and is now office and storage space.

Link:

http://transportation.blog.state.ma.us/ ... uture.html
kenmedford
 
Posts: 20
Joined: Thu Feb 12, 2009 10:26 pm
Location: Medford, MA

Re: South Station Expansion Project Discussion

Postby R36 Combine Coach » Mon Jun 10, 2013 8:56 pm

Very interesting reading. Now that many historic rail terminals have been reconditioned for commercial use, seeing a movie theater inside one nowadays isn't too far fetched (Washington Union Station had one when renovated in 1988). The lower level loop reminds me of Grand Central's lower level.
Since my friend continues to chain smoke nonstop, she is probably an Alco.
User avatar
R36 Combine Coach
 
Posts: 4808
Joined: Mon Jun 09, 2008 8:51 pm

Re: South Station Expansion Project Discussion

Postby jbvb » Tue Jun 11, 2013 12:14 pm

I explored and photographed the underground parts of the station during the demolition; the loop terminal area looked more like the old Scollay Sq. station than any part of Grand Central: beige tile, tightly curved track in pavement for ground-level boarding. Basically, it was an interurban terminal.
jbvb
 
Posts: 1285
Joined: Mon Nov 12, 2007 3:50 pm
Location: Rockingham Co., NH

South Station Expansion Project Discussion

Postby StefanW » Wed Nov 05, 2014 2:39 pm

The project environmental impact report (which includes lots of great detail) is now out.

MassDOT wrote:The South Station Expansion Draft Environmental Impact Report (DEIR) is now available. MassDOT filed the DEIR with the Massachusetts Environmental Policy Act (MEPA) office on October 31, 2014.

The DEIR summarizes the project’s environmental benefits and impacts. MassDOT, the MBTA, the Federal Railroad Administration, and Amtrak have identified the expansion of rail capacity at South Station as a critical regional and national transportation need. The purpose of the South Station Expansion project is to expand the station’s terminal and related layover capacity to meet current and future high-speed, intercity, and commuter rail service needs. The latest project fact sheet summarizes the main conclusions of the DEIR.


The main site is http://www.massdot.state.ma.us/southstationexpansion/ but these are two good summary PDFs:
http://www.massdot.state.ma.us/Portals/ ... ll2014.pdf
http://www.massdot.state.ma.us/Portals/ ... _F_WEB.pdf

Also the full report is http://www.massdot.state.ma.us/southsta ... /DEIR.aspx
User avatar
StefanW
 
Posts: 468
Joined: Wed Aug 18, 2004 8:27 pm
Location: Lynn, MA / MP 11.53

Re: South Station Expansion Project Discussion

Postby StefanW » Wed Nov 05, 2014 2:41 pm

Here's a shot of the plan:
SouthStationPlan.jpg
User avatar
StefanW
 
Posts: 468
Joined: Wed Aug 18, 2004 8:27 pm
Location: Lynn, MA / MP 11.53

Re: South Station Expansion Project Discussion

Postby F-line to Dudley via Park » Wed Nov 05, 2014 2:52 pm

Pretty much the same as the previous project renderings. Although that diagram doesn't show every tiny little mod to the crossover layout like the really detailed schematics do.
F-line to Dudley via Park
 
Posts: 6919
Joined: Fri Mar 11, 2005 7:26 pm
Location: North Cambridge

Re: South Station Expansion Project Discussion

Postby deathtopumpkins » Thu Nov 06, 2014 9:37 am

I haven't had a chance to read through the report yet, but am I correct in assuming from this plan that they plan to open Dot Ave to the public?
Call me Connor or DTP

Railfan & Roadgeek from the North Shore of Mass.
deathtopumpkins
 
Posts: 911
Joined: Tue Aug 27, 2013 8:56 am
Location: Somerville, MA

Re: South Station Expansion Project Discussion

Postby The EGE » Thu Nov 06, 2014 10:22 am

Dot Ave will be reopened to the public in some form, certainly with an extension of the Harborwalk for pedestrians. Last I heard, it's not been decided whether it will be a two-way public road, one-way public road, or for emergency vehicles/non-motorized modes only.
"Give me an unobstructed right-of-way and I'll show them how to move the earth!"
User avatar
The EGE
 
Posts: 2448
Joined: Wed Feb 16, 2011 6:16 pm
Location: Waiting for the C Branch

Re: South Station Expansion Project Discussion

Postby Arlington » Thu Jan 26, 2017 9:15 am

From GLX via Trump's project list:
F-line to Dudley via Park wrote: [Trump's] GLX move probably bodes well for expediting South Station Expansion and finally un-stuck'ing the USPS relocation to Southie. That's another one that's pretty much locked-and-loaded to be shovels-in-ground within this Admin.'s 1st term where a recommended project-starts rating would be another beneficial leverage card to play with Congress in the coming months as the $1T infrastructure dog-and-pony show gets rolled out.

The Trump list favors (or at least calls out) things with a "revenue stream." (GLX and Chicago's RPM rate "yes, partial", while the hydro generation and river locks rate "yes" (presumably from electricity sales and lock fees))

Would SSX qualify? What share do TOD pay for?
"Trying to solve congestion by making roadways wider is like trying to solve obesity by buying bigger pants."--Charles Marohn
Arlington
 
Posts: 3171
Joined: Wed Jun 02, 2004 7:51 am
Location: Medford MA (was Arlington MA and Arlington VA)

Previous

Return to Massachusetts Bay Transportation Authority (MBTA)

Who is online

Users browsing this forum: No registered users and 3 guests