Re: Kawasaki Rebuild Program at Alstom Discussion

Postby sonicdoommario » Mon Jan 28, 2019 5:21 pm

755 is going to be the next car sent out to Alstom. First one since I believe the 1720 this past summer.
sonicdoommario
 
Posts: 96
Joined: Fri Jun 10, 2016 8:14 pm

Re: Kawasaki Rebuild Program at Alstom Discussion

Postby Mbtagp40mc » Tue Feb 05, 2019 8:40 am

Saw 1706 back in service this morning at south station. Couldn’t snap a picture unfortunately.
Mbtagp40mc
 
Posts: 50
Joined: Wed May 24, 2017 3:47 pm

Re: Kawasaki Rebuild Program at Alstom Discussion

Postby sonicdoommario » Tue Feb 05, 2019 10:36 am

Is it in service just for the day or is it good to go? The MBTA mentioned that they are using every car in service today for the Patriots parade. Does that include the Kawasakis that were in testing, and if so, would they go back into testing after today?
sonicdoommario
 
Posts: 96
Joined: Fri Jun 10, 2016 8:14 pm

Re: Kawasaki Rebuild Program at Alstom Discussion

Postby sonicdoommario » Thu Feb 07, 2019 5:19 pm

I saw 1706 last night. It got a big assignment out of the gate, and was put onto one of Providence's 8-double car set (it did have 1815 attached behind it though).

Also, it looks like 723 has returned and is now in testing.
sonicdoommario
 
Posts: 96
Joined: Fri Jun 10, 2016 8:14 pm

Re: Kawasaki Rebuild Program at Alstom Discussion

Postby johnpbarlow » Fri Feb 08, 2019 8:40 am

sonicdoommario wrote:755 is going to be the next car sent out to Alstom. First one since I believe the 1720 this past summer.


I'm guessing this is coach 755 heading west on Pan Am freight POED at South Royalston on Monday 2/4/19. I though it odd that the MBTA double decker was placed as car #6 in the consist with most of the train tonnage on its drawbar, as opposed to being placed on the rear of the train trailed by a single car hosting the EOT.
Attachments
PAS POED S Royalston 020419 5 small.jpg
johnpbarlow
 
Posts: 1999
Joined: Fri Mar 12, 2004 12:50 pm

Re: Kawasaki Rebuild Program at Alstom Discussion

Postby sonicdoommario » Thu Feb 14, 2019 7:09 pm

I saw 744 back in service tonight. It was on train 823 tonight.
sonicdoommario
 
Posts: 96
Joined: Fri Jun 10, 2016 8:14 pm

Re: Kawasaki Rebuild Program at Alstom Discussion

Postby sonicdoommario » Wed Feb 20, 2019 6:18 pm

724 is also back in service too.

What's the deal with 757 and 767 remaining in testing? Looking at the web archive of NETransit, they've been in testing for quite a long time now. Are they waiting for the 700-749 series to completely finish before releasing these two?
sonicdoommario
 
Posts: 96
Joined: Fri Jun 10, 2016 8:14 pm

Re: Kawasaki Rebuild Program at Alstom Discussion

Postby sonicdoommario » Fri Mar 01, 2019 5:33 pm

723 now back in service. 757 and 767 however, are no longer being shown as in-testing. Did they fail and were sent back to Alstom?
sonicdoommario
 
Posts: 96
Joined: Fri Jun 10, 2016 8:14 pm

Re: Kawasaki Rebuild Program at Alstom Discussion

Postby trains18 » Sun Mar 03, 2019 11:29 pm

Nope they are back in service :)
Last edited by CRail on Mon Mar 04, 2019 12:22 am, edited 1 time in total.
Reason: Unnecessary quote removed.
trains18
 
Posts: 31
Joined: Sat Feb 09, 2019 10:21 am

Re: Kawasaki Rebuild Program at Alstom Discussion

Postby CRail » Mon Mar 04, 2019 12:26 am

If you do not have accurate information, do not post any.

757 and 767 were returned stripped and used for testing out of Rochester (finished rebuilds were tested with them in train, they were not being tested themselves). They have been sent back to Alstom.
Moderator: Massachusetts Bay Transportation Authority
Avatar:3679A (since wrecked)/3623B (now in service as 3636B).
User avatar
CRail
 
Posts: 2329
Joined: Tue May 18, 2004 8:27 am
Location: Eastie

Re: Kawasaki Rebuild Program at Alstom Discussion

Postby GP40MC1118 » Tue Mar 05, 2019 12:19 am

Thanks for the clarification on those two. I was wondering why my records showed
them out to Alstom and back, but then sent out again.

D
GP40MC1118
 
Posts: 3524
Joined: Thu Mar 11, 2004 8:06 pm

Re: Kawasaki Rebuild Program at Alstom Discussion

Postby trains18 » Sat Mar 09, 2019 3:19 pm

Anyone know when 1716 and 1720 are returning? The last two control cars to be rebuilt.
trains18
 
Posts: 31
Joined: Sat Feb 09, 2019 10:21 am

Re: Kawasaki Rebuild Program at Alstom Discussion

Postby sonicdoommario » Sat Mar 09, 2019 9:01 pm

Between the two, I'd guess that 1716 would be the first of the two to come back. I think 1716 was sent last June while 1720 was sent in August I think. I tried piecing this together using the archived pages of NETransit at web.archive.org.

An average rebuild takes around a year, right?
sonicdoommario
 
Posts: 96
Joined: Fri Jun 10, 2016 8:14 pm

Re: Kawasaki Rebuild Program at Alstom Discussion

Postby sonicdoommario » Sat Apr 06, 2019 5:31 pm

769 quietly went to NY per NETransit.

Also, 1722, which is rebuilt and has been out of service for a while, is now at Delaware Car to get repaired.
sonicdoommario
 
Posts: 96
Joined: Fri Jun 10, 2016 8:14 pm

Re: Kawasaki Rebuild Program at Alstom Discussion

Postby sonicdoommario » Thu Apr 11, 2019 9:37 pm

709 has returned and in testing now.
sonicdoommario
 
Posts: 96
Joined: Fri Jun 10, 2016 8:14 pm