Increase Worcester service start-up date.

Discussion relating to commuter rail, light rail, and subway operations of the MBTA.

Moderators: CRail, sery2831

Re: Increase Worcester service start-up date.

Postby NaDspr » Fri Aug 16, 2013 9:00 am

How is the on time performance now that MBCR has taken over the dispatching of the Worcester Line?
NaDspr
 
Posts: 155
Joined: Sat Mar 13, 2004 1:46 pm
Location: In a chair in front of the computer

Re: Increase Worcester service start-up date.

Postby MBTA F40PH-2C 1050 » Fri Aug 16, 2013 11:33 am

everything has been running great so far. There have been no problems at all, atleast dispatching wise. As for an update for the layover tracks in the P&W, I heard yesterday that there are 2 tracks nearing completion. The ground air needs to be installed and that should be it. The location is near the WYE and engine house in the yard??? I'm not qualified down in there, but from the way it was explained, it is a straight shot to get up the hill to access CP 45 and then the controlled siding.
MBTA F40PH-2C 1050
 
Posts: 3507
Joined: Thu Mar 11, 2004 7:57 pm

Re: Increase Worcester service start-up date.

Postby Komarovsky » Fri Aug 16, 2013 4:41 pm

Is Amtrak still dispatching between south station and cove? In the past few days a new 5-10mph speed restriction has gone in between yawkey and cove for some reason.
Komarovsky
 
Posts: 493
Joined: Thu Jul 07, 2011 10:11 pm

Re: Increase Worcester service start-up date.

Postby MBTA F40PH-2C 1050 » Fri Aug 16, 2013 9:56 pm

Komarovsky wrote:Is Amtrak still dispatching between south station and cove? In the past few days a new 5-10mph speed restriction has gone in between yawkey and cove for some reason.


There have been no other changes with Amtrak TD's. The Terminal TD is in charge of South Station's TOWER 1 and COVE interlockings. The Worcester Main Line TD is in control between COVE (exclusive) and CP 45 (exclusive).There is a 10 mph speed restriction within CP 3 interlocking limits. I noticed fresh wooden ties under the mass pike near CP 3, assuming the two are connected.
MBTA F40PH-2C 1050
 
Posts: 3507
Joined: Thu Mar 11, 2004 7:57 pm

Re: Increase Worcester service start-up date.

Postby boatsmate » Mon Aug 19, 2013 1:07 pm

Where is the Worcester TD antenna at?? I have put the radio frequency in my scanner but have not heard anything on it in the Worcester area... I used to hear the NA dispatcher fine as well as some of the trains and on a good day I could hear the Grafton Detector.

Thanks in advance

Bill
boatsmate
 
Posts: 514
Joined: Sat Jul 08, 2006 4:57 pm
Location: Boylston, Ma

Re: Increase Worcester service start-up date.

Postby frrc » Mon Aug 19, 2013 2:29 pm

boatsmate wrote:Where is the Worcester TD antenna at?? I have put the radio frequency in my scanner but have not heard anything on it in the Worcester area... I used to hear the NA dispatcher fine as well as some of the trains and on a good day I could hear the Grafton Detector.

Thanks in advance

Bill


I recall their used (?) to be an antenna on a hill in Paxton, Anebusket(?) hill or a similar name. And an antenna in the main yards.

JoeF
Avatar: Self Portrait, Railroad Office
Renaissance Restorations LLC
Leominster, MA 01453

My Sites: Architectual Restorations
User avatar
frrc
 
Posts: 778
Joined: Thu Dec 23, 2004 11:31 am
Location: Leominster, MA

Re: Increase Worcester service start-up date.

Postby KB1KVD » Mon Aug 19, 2013 7:20 pm

The Worcester TD is operated from the South Station CETC. There's a base radio in Worcester, Grafton, Wellesley, Cove and inside Back Bay. MBCR didn't take any of the CSX radio sites due to coverage issues along the mainline. One of the big issues CSX had was if the radio in Paxton went down they lost a lot of territory due to the nature of VHF with all the hills.
C&S R103, Keolis communications roadmaster out....
User avatar
KB1KVD
 
Posts: 44
Joined: Sun Feb 06, 2005 10:30 pm
Location: Rehoboth,Ma

Re: Increase Worcester service start-up date.

Postby NaDspr » Sat Aug 24, 2013 7:42 am

CSX had radio bases at Beacon Park, Framingham and Worcester along the commuter rail route. Paxton covered a lot of the NA Dispatching territory. Even if Paxton went down, the other bases still worked. Paxton is still in service for CSX as is Worcester and Framingham. Not sure about Beacon Park.
NaDspr
 
Posts: 155
Joined: Sat Mar 13, 2004 1:46 pm
Location: In a chair in front of the computer

MBTA Dispatching Boston-Worcester Yet?

Postby CPF363 » Sat Aug 24, 2013 5:33 pm

Does anyone know if the MBTA is dispatching the Boston to Worcester line as of yet? The CSX NB dispatcher seems to be running the line all of the way up to Worcester now. If this is true, what is the furthest western point where the MBTA dispatcher cuts off and the NB dispatcher begins? What radio frequency is being used on the MBTA portion of the line? CSX seems to still be using both 160.680MHz and 160.800MHz.
CPF363
 
Posts: 649
Joined: Mon Apr 20, 2009 9:00 pm

Re: MBTA Dispatching Boston-Worcester Yet?

Postby AEM7AC920 » Sat Aug 24, 2013 7:44 pm

Yes MBCR dispatchers now control out to CP45, went into effect the beginning of August.
AMTRAK HAWK DETECTOR TRACK 1 NOOO DEFECTS OUT!
AEM7AC920
 
Posts: 2582
Joined: Fri Mar 12, 2004 4:51 pm
Location: Unkown.....

Re: MBTA Dispatching Boston-Worcester Yet?

Postby KB1KVD » Sat Aug 24, 2013 8:42 pm

MBTA Worcester dispatcher controls up to but not including CP45 on AAR 20-20 (160.410). CSX NB (formerly NA) handed over to the mbta dispatching back on Aug 3.
C&S R103, Keolis communications roadmaster out....
User avatar
KB1KVD
 
Posts: 44
Joined: Sun Feb 06, 2005 10:30 pm
Location: Rehoboth,Ma

Re: Increase Worcester service start-up date.

Postby ns3010 » Sat Aug 24, 2013 9:00 pm

NaDspr wrote:How is the on time performance now that MBCR has taken over the dispatching of the Worcester Line?


MBCR and the T were very pleased to report several days of 100% OTP during the first week of the dispatching takeover. I noticed at least two or three days during that week where they took to Twitter to brag about their success.
User avatar
ns3010
 
Posts: 1961
Joined: Sun Dec 21, 2008 12:53 pm
Location: MP 226.5

Re: Increase Worcester service start-up date.

Postby KB1KVD » Mon Aug 26, 2013 4:34 pm

Even though the other bases still worked, there was still a several mile gap in radio coverage. Mostly between Auburndale and Natick where the coverage became spotty.
C&S R103, Keolis communications roadmaster out....
User avatar
KB1KVD
 
Posts: 44
Joined: Sun Feb 06, 2005 10:30 pm
Location: Rehoboth,Ma

Re: Increase Worcester service start-up date.

Postby The EGE » Sat Nov 16, 2013 1:00 pm

The full 40 Worcester one-way trips (increase from the current 33) will take place in December or January, reports the Telegram. Buried under all the SCR nonsense has been $15M in track upgrades for the line, half next year and half the year after. That sounds a lot like Beacon Park 2nd main plus 79mph running west of Framingham to me.
User avatar
The EGE
 
Posts: 2521
Joined: Wed Feb 16, 2011 6:16 pm
Location: Waiting for the N Judah

Re: Increase Worcester service start-up date.

Postby MBTA F40PH-2C 1050 » Sat Nov 16, 2013 4:22 pm

we can barely operate as it is currently, every piece of equipment is being used. idk how they are going to fit these extra trains in...
MBTA F40PH-2C 1050
 
Posts: 3507
Joined: Thu Mar 11, 2004 7:57 pm

PreviousNext

Return to Massachusetts Bay Transportation Authority (MBTA)

Who is online

Users browsing this forum: No registered users and 6 guests