LIRR Model Layouts

Discussion of the past and present operations of the Long Island Rail Road.

Moderator: Liquidcamphor

Re: LIRR Model Layouts

Postby deandremouse » Thu Aug 10, 2017 9:14 pm

Ðauntless wrote:Image

Those bogies came out real nice. Great job can't wait to see the finished product
-DeAndre W.
Volunteer Conductor
(MTA) Railroads
Electrical Engineering Tech
deandremouse
 
Posts: 597
Joined: Sat Nov 22, 2008 9:46 pm

Re: LIRR Model Layouts

Postby Ðauntless » Fri Aug 11, 2017 5:12 pm

Thanks. Still have 4 more intermediates to do..
"Mulligan I said 3 minutes!"
User avatar
Ðauntless
 
Posts: 232
Joined: Sat Mar 27, 2010 7:14 pm
Location: Lake Wazzapamani

Re: LIRR Model Layouts

Postby ConstanceR46 » Fri Aug 18, 2017 6:54 pm

Grabbed a IHC EL coach to patch up for the LIRR.
ConstanceR46
 
Posts: 234
Joined: Tue Feb 28, 2017 10:57 pm

Re: LIRR Model Layouts

Postby Steamfan77 » Fri Sep 01, 2017 7:31 pm

I completed the road work for the junction at Mineola. If you look at my post from 7/8, you'll see Main St is missing as it crosses the tracks. Below is the finished product. I used joint compound mixed with black paint, and finished with weathering powders. I'm pretty happy with the results.

Andy
Attachments
Mineola junction NW.jpg
Mineola junction NE.jpg
Mineola junction N.jpg
Steamfan77
 
Posts: 7
Joined: Wed Feb 15, 2017 10:48 pm

Re: LIRR Model Layouts

Postby Ðauntless » Tue Oct 03, 2017 12:20 pm

Image
"Mulligan I said 3 minutes!"
User avatar
Ðauntless
 
Posts: 232
Joined: Sat Mar 27, 2010 7:14 pm
Location: Lake Wazzapamani

Re: LIRR Model Layouts

Postby mirrodie » Mon Dec 04, 2017 9:43 pm

edflyerssn007 wrote:A couple videos of one of my GP-38's pulling two F&C P72's that I just put together. It's my first time actually painting a car.

https://www.youtube.com/watch?v=iBjmnNOZn4M
https://www.youtube.com/watch?v=GcRZ_sCOslw

2nd video has a paint scheme that I made up that's LIRR inspired, maybe something the P72's would have worn if they had continued farther into the C3 era.

Also here's some WIP pictures.

http://imgur.com/a/mfhD2

Image
Image
Image


Nice looking cars! I’ve got 4 F&C P72 cars that Ive had for over a decade..seems like I only get to work on them little by little during the holidays. (With kids and a tons of other things always popping up, they are a long term work in progress)

How did the cars come out? How are the trucks? And the couplers?
All you need is faith
To hear the diesels humming
mirrodie
 
Posts: 471
Joined: Mon Mar 15, 2010 9:23 am

Re: LIRR Model Layouts

Postby RGlueck » Tue Dec 05, 2017 8:30 am

Oh yeah? Try telling that to this Bogie!
Attachments
Bogie.jpg
Bogie.jpg (6.17 KiB) Viewed 1900 times
RGlueck
 
Posts: 591
Joined: Sat Oct 01, 2011 3:59 pm

Re: LIRR Model Layouts

Postby scopelliti » Fri Feb 23, 2018 12:40 pm

Question: inside the Morris Park engine house (between the roundhouse and the first transfer table), were there work pits between the rails, or was it all flat concrete?
Pat
User avatar
scopelliti
 
Posts: 516
Joined: Thu Mar 11, 2004 10:35 pm
Location: Big Flats, NY

Re: LIRR Model Layouts

Postby nyandw » Fri Feb 23, 2018 10:40 pm

Pat, I've been poking around for any inside the Roundhouse info/photos... None thus far. But, here's my take on your question as followings:

As the major steam loco facility for the LIRR with a "good sized roundhouse" it would seem that all stalls be created equal so as not to require locos already serviced underneath via the work pit having to be backed our into another non-pit' stall to allow another loco access. As far as 'flat concrete' I don't see how the would service/lube the running gear/underbody/trucks/etc. Every photo/model I have seen has all the full repair/service stalls with pits. Yes, I'm sure there are proto exceptions (always 'a prototype' for everything in modeling land! :-) Best, Steve
User avatar
nyandw
 
Posts: 3330
Joined: Fri Mar 19, 2004 12:41 am

Re: LIRR Model Layouts

Postby scopelliti » Sat Feb 24, 2018 3:52 pm

I also asked on Facebook and Steven Torborg responded that apparently about half had a pit (he feels most of the pits were on the northern side). Yeah, I've looked at every photo I can find...nothing really shows much of the floor area.
Pat
User avatar
scopelliti
 
Posts: 516
Joined: Thu Mar 11, 2004 10:35 pm
Location: Big Flats, NY

Re: LIRR Model Layouts

Postby scopelliti » Mon Feb 26, 2018 1:25 pm

Go the answer on Facebook... in the image below the red box is the outline of what was once the engine house. The roundhouse is to the right, the first transfer table was to the left. The arrows that indicate the first two of what appears to be new concrete filling in the old inspection pits. My model has six stalls,so the first two (or three) will have pits.
Morris Park engine house.JPG
The cement floor of what was once the engine house.
Pat
User avatar
scopelliti
 
Posts: 516
Joined: Thu Mar 11, 2004 10:35 pm
Location: Big Flats, NY

Re: LIRR Model Layouts

Postby nyandw » Mon Feb 26, 2018 9:04 pm

Nice, Pat... I stand corrected as I was referring to the Roundhouse stalls.
User avatar
nyandw
 
Posts: 3330
Joined: Fri Mar 19, 2004 12:41 am

Re: LIRR Model Layouts

Postby mirrodie » Tue Feb 27, 2018 12:09 pm

happy to help! I guess I should add cartography to my hobby list ;)
All you need is faith
To hear the diesels humming
mirrodie
 
Posts: 471
Joined: Mon Mar 15, 2010 9:23 am

Previous

Return to Long Island Rail Road (LIRR)

Who is online

Users browsing this forum: scopelliti and 10 guests