Rebuild LIRR Bridge at Post Ave in Westbury

Discussion of the past and present operations of the Long Island Rail Road.

Moderator: Liquidcamphor

Rebuild LIRR Bridge at Post Ave in Westbury

Postby Jeff Smith » Thu Nov 17, 2016 1:42 pm

http://www.mta.info/news/2016/11/16/mta ... e-westbury

Government exception to fair-use:

MTA Board Approves Project to Rebuild LIRR Bridge at Post Avenue in Westbury
November 16th, 2016
The Metropolitan Transportation Authority (MTA) Board has approved a contract for the design and construction of a new bridge carrying the Long Island Rail Road tracks over Post Avenue at the Westbury LIRR station.
The new bridge will replace a deteriorated span that has been in service for 102 years. The new span would be safer for vehicular traffic, meeting the latest standards and requirements of the New York State Department of Transportation. The rebuilt bridge will increase the clearance to 14 feet above the roadway, a full two feet and two inches higher than the current clearance of 11 feet, 10 inches.
The increase in clearance is expected to improve train service by reducing the number of instances in which over-height trucks strike the bridge, which can result in train delays for thousands of LIRR customers. The bridge has been struck by trucks between five and nine times per year in each of the past six years.
The contract was packaged as a “design-build” contract, a type of contract that Governor Andrew M. Cuomo has asked the MTA to use whenever possible to reduce the length of time it takes to complete construction projects. Under this type of contract, the same firm that designs a project also builds it to the specifications it has designed.
LIRR President Patrick A. Nowakowski said: “With the award of this contract, we’re working to improve Main Line train service with a modern bridge with a higher clearance that will reduce bridge strikes, and the train delays that can result. And by using the design-build contracting method, we’re doing this in the most efficient, and fastest way possible.”
The contract for the Post Avenue bridge reconstruction was awarded to Halmar International Inc., an engineering and construction concern based in Nanuet, N.Y. There were four other major competitors answering a Request for Proposals, which was issued by the railroad in August. After careful analysis of all the proposals, an LIRR deemed Halmar’s offer the best from both a technical perspective and price. Halmar’s proposal of $9.7 million was $1.6 million below the LIRR’s cost estimate for the project.
LIRR officials said the reconstruction work would require one weekend train service outage on the Main Line, projected for October 2017.
The railroad has carefully managed similar weekend service suspension, most recently for the demolition and reconstruction of the Ellison Avenue Bridge along the same route in Westbury and the replacement of the Colonial Road Bridge on the Port Washington Branch near Great Neck station.
Under terms of the contract, the LIRR and Halmar have set a goal of having 17 percent of the subcontracting work performed by minority-owned, woman-owned and disadvantaged business enterprises, an initiative that Governor Cuomo has made a priority for state agencies as well as the operating agencies of the MTA.
In addition to improving conditions for LIRR customers, motorists and truckers, the new bridge will also be able to accommodate a third Main Line track, in line with other infrastructure improvements in the corridor over the years and also in line with Governor Cuomo's proposed LIRR Expansion project.
Next stop, Willoughby
~Jeff Smith (fka "Sarge") :: RAILROAD.NET Site Administrator
Jeff Smith
Site Admin
 
Posts: 7057
Joined: Tue Nov 07, 2006 9:28 am
Location: MP 67.2 Georgia Southern Railway

Re: Rebuild LIRR Bridge at Post Ave in Westbury

Postby MattAmity90 » Fri Nov 18, 2016 3:04 am

Never realized that the Post Avenue bridge was that worn out, and yeah it's time to not just replace it but increase the clearance.

Wouldn't be surprised if the closed off 2 car lengths on the West end of the platforms, along with ramps and stairs.
This station is Babylon, this is the train to Penn Station. Stopping at: Lindenhurst, Copiague, Amityville, Massapequa Park, Massapequa, Seaford, Wantagh, Bellmore, Merrick, Freeport, Baldwin, Rockville Centre, Lynbrook, Valley Stream, Jamaica, Kew Gardens, Forest Hills, Woodside, Penn Station.
User avatar
MattAmity90
 
Posts: 499
Joined: Sat Apr 21, 2012 4:46 pm
Location: Easton, PA

Re: Rebuild LIRR Bridge at Post Ave in Westbury

Postby Head-end View » Fri Nov 18, 2016 8:04 pm

Why would they need to do that? I don't know that they're raising the tracks, maybe just putting in a bridge with a slimmer structure than the old one, so the bottom is 2 feet higher?
Head-end View
 
Posts: 2235
Joined: Thu Mar 11, 2004 10:00 pm
Location: The second row on a SEPTA Silverliner V