LIRR Mainline Third Track Project

Discussion of the past and present operations of the Long Island Rail Road.

Moderator: Liquidcamphor

Re: LIRR Mainline Third Track Project

Postby MACTRAXX » Thu Dec 20, 2018 12:15 pm

LB, Norton and Everyone:

The Meadowbrook Parkway Bridge once carried a long-removed siding track which began right on
the bridge structure itself - and explains why the south part was built at an angle. Will construction
call for a "wedge" to be built for the third track addition or will the extra section be removed and
replaced with a completely new single track bridge section?

MACTRAXX
EXPRESS TRAIN TO NEW YORK PENN STATION-NO JAMAICA ON THIS TRAIN-PLEASE STAND CLEAR OF THE CLOSING TRAIN DOORS
MACTRAXX
 
Posts: 3997
Joined: Mon Feb 07, 2005 11:55 am
Location: Islandia,Long Island,NY

Re: LIRR Mainline Third Track Project

Postby LB » Thu Dec 20, 2018 12:25 pm

Not sure which option will be used for the Meadowbrook PKWY. They'll probably just build a 3rd trestle.
LB
 
Posts: 476
Joined: Fri Sep 07, 2007 12:13 pm
Location: Callaway, MD

Re: LIRR Mainline Third Track Project

Postby MattAmity90 » Thu Dec 20, 2018 10:52 pm

Head-end View wrote:Matt, are you sure about the track numbering scheme in item #4? LIRR doesn't normally number tracks that way. At least not in the 4-track area. Normally the inside tracks are 1-2. And the outside tracks are 3-4. Are they going to have a separate numbering scheme just for the stretch from Floral Park to Hicksville? :(


I don't know about that, but I already knew that the Northernmost track that sees service is always TRACK 1. What I applied was that at Woodside the two Northernmost tracks (Port Washington Branch ONLY) are TRACK 1 and TRACK 2. For the four tracks to the South of the Island platform, TRACK 3 is designated the Northernmost of the four since the island platform services it. TRACK 4 is the Southernmost track because it is serviced, and TRACK 5 and TRACK 6 are the two express tracks in between with 5 being next to 3 and 6 being next to 4.

WoodsideMap.jpg
This station is Babylon, this is the train to Penn Station. Stopping at: Lindenhurst, Copiague, Amityville, Massapequa Park, Massapequa, Seaford, Wantagh, Bellmore, Merrick, Freeport, Baldwin, Rockville Centre, Lynbrook, Valley Stream, Jamaica, Kew Gardens, Forest Hills, Woodside, Penn Station.
User avatar
MattAmity90
 
Posts: 809
Joined: Sat Apr 21, 2012 4:46 pm
Location: Easton, PA

Re: LIRR Mainline Third Track Project

Postby gamer4616 » Fri Dec 21, 2018 10:13 am

At Woodside, the tracks are numbered as follows, from North to South:

Port Washington 1
Port Washington 2
Mainline 3
Mainline 1
Mainline 2
Mainline 4



All parts of the system with 4 tracks, are numbered 3,1,2,4 from North to South. There hasn't been any official documents I've seen as far as the new third track. I don't know if it will be 1,2,3 or 1,3,2.
gamer4616
 
Posts: 47
Joined: Mon Dec 19, 2016 6:49 pm

Re: LIRR Mainline Third Track Project

Postby Head-end View » Fri Dec 21, 2018 8:34 pm

gamer4616 is correct re: the normal LIRR track numbering in 4-track areas. The tracks at Woodside Station could be numbered as MattAmity90 suggested as LIRR does number station tracks differently at major stations like Jamaica and Hicksville. Don't know if that applies at Woodside or not. Maybe 'cause you couldn't have two different tracks numbered 1 and 2 at a station as far as the public is concerned. Anyone here who can confirm?
Head-end View
 
Posts: 2603
Joined: Thu Mar 11, 2004 10:00 pm
Location: The second row on a SEPTA Silverliner V

Re: LIRR Mainline Third Track Project

Postby gamer4616 » Fri Dec 21, 2018 8:41 pm

Yes, I can confirm.

At Woodside, the tracks are numbered as follows, from North to South:

Port Washington 1
Port Washington 2
Mainline 3
Mainline 1
Mainline 2
Mainline 4


I am qualified on the physical characteristics of the LIRR
gamer4616
 
Posts: 47
Joined: Mon Dec 19, 2016 6:49 pm

Re: LIRR Mainline Third Track Project

Postby Head-end View » Fri Dec 21, 2018 9:20 pm

Thanks gamer4616 for the authoritative info. I guess the other poster misunderstood the diagram. LOL. I just realized the duplicate track numbers are not an issue at Woodside as the Mainline platform tracks are 3-4, not 1-2. Thanks again.

Getting back to Mineola, wouldn't the LIRR style numbering have to be either 3-1-2 or 1-2-4 from north to south unless they plan on doing something different from past practice?
Head-end View
 
Posts: 2603
Joined: Thu Mar 11, 2004 10:00 pm
Location: The second row on a SEPTA Silverliner V

Re: LIRR Mainline Third Track Project

Postby Backshophoss » Sat Dec 22, 2018 7:58 pm

LIRR was a ward of the PRR for a long time, so this was a PRR practice, with the 3rd track, the convention at Mineola will be:
# 3 track, westbound local
# 1 track, center track, bidirectional Express
#2 track, eastbound local
As is the current practice, all tracks will be CTC 261,ie any track, any time, any direction.

That should cover the entire distance of the 3rd Main all the way to Divide Tower.
Backshophoss
 
Posts: 5950
Joined: Mon Mar 05, 2012 7:58 pm

Re: LIRR Mainline Third Track Project

Postby Head-end View » Sat Dec 22, 2018 9:30 pm

Well that's the most logical set-up. They could number them 1-2-4, but no sense having a track-4 when there's only three tracks. :wink:
Head-end View
 
Posts: 2603
Joined: Thu Mar 11, 2004 10:00 pm
Location: The second row on a SEPTA Silverliner V

Re: LIRR Mainline Third Track Project

Postby Jeff Smith » Sun Dec 23, 2018 12:04 am

PRR was similar in track numbering to the NYNH&HRR AFAIK. NH line trains were 3, 1, 2, 4 east to west (inbound). NYC I think was 1, 2, 3, 4...
Next stop, Willoughby
~Jeff Smith (fka "Sarge") :: RAILROAD.NET Site Administrator
Jeff Smith
Site Admin
 
Posts: 8137
Joined: Tue Nov 07, 2006 9:28 am
Location: MP 67.2 Georgia Southern Railway

Re: LIRR Mainline Third Track Project

Postby hs3730 » Sun Dec 23, 2018 12:43 am

I arrived at 3-1-2 as the logical outcome a different way: if you continue the tracks from Queens (since the Hempstead branch westbound track is now becoming the Main line eastbound track) they would have the same numbers.
hs3730
 
Posts: 171
Joined: Mon Dec 10, 2007 8:30 pm
Location: Albany NY

Re: LIRR Mainline Third Track Project

Postby ExCon90 » Tue Jan 08, 2019 3:11 pm

Jeff Smith wrote:PRR was similar in track numbering to the NYNH&HRR AFAIK. NH line trains were 3, 1, 2, 4 east to west (inbound). NYC I think was 1, 2, 3, 4...

Just found this thread; both NH and NYC numbered their tracks 3,1,2,4 reading from north to south on east-west lines, meaning that NH trains made a shift at Woodlawn, and I believe still do. NYC had an important exception between Buffalo and west of Albany reading 2,1,3,4 from south to north to preserve numbering for express passenger as 1 and 2, and local and freight 3 and 4 on that unique stretch of trackage. The PRR numbered from south to north on e-w lines and east to west on n-s lines regardless of the direction or type of traffic--with some important exceptions.
ExCon90
 
Posts: 4161
Joined: Thu Sep 18, 2008 1:22 pm

Re: LIRR Mainline Third Track Project

Postby rr503 » Wed Jan 09, 2019 5:27 pm

Dumb trolling elsewhere on this forum aside, Third Track seems to be the nail in the coffin for direct NYC-OB service. If it were to be shuttle-ified, I assume they'd build a new platform at Mineola? This one, IINM, has been studied by the LIRR over the years -- was wondering if anyone could offer more insight.
rr503
 
Posts: 677
Joined: Sat May 02, 2015 4:13 pm
Location: North by Northwest

Re: LIRR Mainline Third Track Project

Postby Jeff Smith » Thu Jan 10, 2019 1:00 am

There will still be only two platforms at Mineola.
Next stop, Willoughby
~Jeff Smith (fka "Sarge") :: RAILROAD.NET Site Administrator
Jeff Smith
Site Admin
 
Posts: 8137
Joined: Tue Nov 07, 2006 9:28 am
Location: MP 67.2 Georgia Southern Railway

Re: LIRR Mainline Third Track Project

Postby rr503 » Thu Jan 10, 2019 7:42 am

Jeff Smith wrote:There will still be only two platforms at Mineola.


For third track, yes. I’m asking whether or not that holds true in assessments of making OB into a shuttle — the new interlocking config at Mineola seems to beg that course of action.
rr503
 
Posts: 677
Joined: Sat May 02, 2015 4:13 pm
Location: North by Northwest