GO Transit / Metrolinx Toronto, ON

Discussion of Canadian Passenger Rail Services such as AMT (Montreal), Go Transit (Toronto), VIA Rail, and other Canadian Railways and Transit

Moderator: Ken V

Re: GO Transit / Metrolinx Toronto, ON

Postby mdvle » Fri Oct 13, 2017 5:31 pm

The EPR (Environmental Project Report) for the GO network electrification has been completed and is now in its public comment period (Oct 11 to Nov 9).

Covered parts of the network are:

    Union Station corridor
    Lakeshore West corridor (Union to Burlington)
    Kitchener corridor (UPExpress spur @ 427 to Bramalea)
    Barrie corridor
    Stouffville corridor
    Lakeshore East corridor

Lots of documentation can be found at http://www.gotransit.com/electrification
mdvle
 
Posts: 119
Joined: Sun Jul 23, 2017 1:48 pm

Re: GO Transit / Metrolinx Toronto, ON

Postby dowlingm » Sun Nov 12, 2017 8:50 am

GO 667 completed by MotivePower, apparently. (First GO loco with AC traction)
https://mobile.twitter.com/diesel_expre ... 1695714305
dowlingm
 
Posts: 1072
Joined: Mon Apr 16, 2012 12:42 pm
Location: Toronto, ON

Re: GO Transit / Metrolinx Toronto, ON

Postby dowlingm » Tue Nov 28, 2017 1:13 pm

667 appears to be headed for the TTCI testing track https://cptdb.ca/topic/4666-go-transit/ ... ent=788453
dowlingm
 
Posts: 1072
Joined: Mon Apr 16, 2012 12:42 pm
Location: Toronto, ON

Previous

Return to Canadian Passenger Operations: AMT, Go Transit, VIA, etc.

Who is online

Users browsing this forum: No registered users and 3 guests