Guilford Rail System changed its name to Pan Am Railways in 2006. Discussion relating to the current operations of the Boston & Maine, the Maine Central, and the Springfield Terminal railroads (as well as the Delaware & Hudson while it was under Guilford control until 1988). Official site can be found here: PANAMRAILWAYS.COM.

Moderator: MEC407

Re: Pan Am Railways (PAR) Maintenance of Way (MoW) Activity

Postby johnpbarlow » Sun Oct 08, 2017 7:16 am

Apparently the borrowed MoW brigade was last spotted at Erving/Wendell area.
johnpbarlow
 
Posts: 1646
Joined: Fri Mar 12, 2004 12:50 pm

Re: Pan Am Railways (PAR) Maintenance of Way (MoW) Activity

Postby BM6569 » Sat Oct 14, 2017 9:00 am

Track panel is being constructed at Hampshire St in Auburn. Two new pieces of stick rail laid on top of the ties.
User avatar
BM6569
 
Posts: 1250
Joined: Wed Oct 27, 2004 12:19 pm
Location: Hebron, Maine

Re: Pan Am Railways (PAR) Maintenance of Way (MoW) Activity

Postby Safetee » Wed Oct 18, 2017 5:05 pm

on the west end various equipment of r j corman has been observed doing a variety of mow between zoar and deerfield. unclear what work is being done but their work in conjunction with a small par gang has interrupted normal train movements for the past week.
Safetee
 
Posts: 176
Joined: Sat Oct 16, 2010 8:07 am

Re: Pan Am Railways (PAR) Maintenance of Way (MoW) Activity

Postby johnpbarlow » Thu Oct 19, 2017 4:56 pm

FI-1 jockeyed 5 more company gons loaded with ties to the House track at Gardner today (turns out 5 gons is the House track's max capacity). Lots of white pick-up trucks (including one hi-rail) parked at Gardner yard today as well.
johnpbarlow
 
Posts: 1646
Joined: Fri Mar 12, 2004 12:50 pm

Re: Pan Am Railways (PAR) Maintenance of Way (MoW) Activity

Postby BostonUrbEx » Thu Oct 19, 2017 6:24 pm

Looks like there's a panel at Shawsheen St in Tewksbury. Perhaps they'll be doing this over the weekend, while the MBTA is tearing up CPW WJ and working out cutting over CPF LJ.
User avatar
BostonUrbEx
 
Posts: 3603
Joined: Thu Dec 03, 2009 9:55 pm
Location: Winn to MPT 8, Boston to MPN 38, and Hat to Bank

Re: Pan Am Railways (PAR) Maintenance of Way (MoW) Activity

Postby jaymac » Sat Oct 21, 2017 6:36 am

Following up on johnpbarlow's of 10-19, predawn 10-21-2017 there were 2 major loose-tie stacks along 2 in Gardner, 1 by the air plant, the other just west. The House was filled with track equipment, and there were 2 utility trailers between the Heywood and MART fence.
"A white SUV with a roof antenna just might not be a company van."
jaymac
 
Posts: 3417
Joined: Wed Mar 04, 2009 1:08 pm

Re: Pan Am Railways (PAR) Maintenance of Way (MoW) Activity

Postby newpylong » Wed Oct 25, 2017 8:29 am

Contractor installing rail and ties in D3. Replaced rail starting in Pownal working east around Charlemont now. Ties started in Erving nearly to Gardner now.
newpylong
 
Posts: 3939
Joined: Thu Jun 28, 2007 12:32 pm
Location: NH

Re: Pan Am Railways (PAR) Maintenance of Way (MoW) Activity

Postby jaymac » Wed Oct 25, 2017 11:58 am

Is the goal to get to 40 or just to get rid of the 10s?
"A white SUV with a roof antenna just might not be a company van."
jaymac
 
Posts: 3417
Joined: Wed Mar 04, 2009 1:08 pm

Re: Pan Am Railways (PAR) Maintenance of Way (MoW) Activity

Postby newpylong » Wed Oct 25, 2017 2:48 pm

Never will be 40 again with the "PA" in PAS.
newpylong
 
Posts: 3939
Joined: Thu Jun 28, 2007 12:32 pm
Location: NH

Re: Pan Am Railways (PAR) Maintenance of Way (MoW) Activity

Postby johnpbarlow » Thu Oct 26, 2017 6:30 am

johnpbarlow
 
Posts: 1646
Joined: Fri Mar 12, 2004 12:50 pm

Re: Pan Am Railways (PAR) Maintenance of Way (MoW) Activity

Postby jaymac » Thu Oct 26, 2017 9:12 am

by newpylong » Wed Oct 25, 2017 2:48 pm
Never will be 40 again with the "PA" in PAS.

Thanks for the reality recalibration...
"A white SUV with a roof antenna just might not be a company van."
jaymac
 
Posts: 3417
Joined: Wed Mar 04, 2009 1:08 pm

Re: Pan Am Railways (PAR) Maintenance of Way (MoW) Activity

Postby CPF363 » Thu Oct 26, 2017 6:16 pm

Surprising that Pan Am dropped welded rail on the straight portions of the line and not just the curves and jointed portions of the line. There is a section of jointed rail between CPF-303 and West Chelmsford, one would have thought that those locations would be where the new rail would be eventually installed. Also, along one straight section of tangent track west of CPF-309, the existing 132lb rail is being replaced with new smaller 115lb, wonder why they are not using the same size rail?
CPF363
 
Posts: 630
Joined: Mon Apr 20, 2009 9:00 pm

Re: Pan Am Railways (PAR) Maintenance of Way (MoW) Activity

Postby neman2 » Tue Oct 31, 2017 4:12 pm

RJ Corman installing the welded rail between CPF 312 and 309 today. Too bad Pan Am didn't replace more ties last year .

Photo by Jonelle DeFelice on NeRail-

http://photos.nerail.org/showpic/?photo ... ex=0&key2=
neman2
 
Posts: 137
Joined: Sun Apr 01, 2012 4:16 pm

Re: Pan Am Railways (PAR) Maintenance of Way (MoW) Activity

Postby neman2 » Thu Nov 09, 2017 8:50 pm

Work continues between CPF 312 and 309 on rail installation by Corman. Equipment is stored at night on track 2 at Graniteville. Crossings are "stop and protect" due to rusty rail.
neman2
 
Posts: 137
Joined: Sun Apr 01, 2012 4:16 pm