CSX-Oak Point/Fremont

Discussion of the operations of CSX Transportation, from 1980 to the present. Official site can be found here: CSXT.COM.

Moderator: MBTA F40PH-2C 1050

Re: CSX-Oak Point/Fremont

Postby AlKaLI » Fri Oct 12, 2018 2:06 pm

Took a later train into the city today due to the rain and was rewarded. NB CSX freight apparently stopped over the LIRR main. COFC with green trash containers and as my train neared Woodside caught the head-end. Two CSX engines, first unit looked like a SD40-2 and possibly the second. Around 7:10 AM this morning. Have not seen a CSX freight for a while and remember that trash cars usually are at the end of the train.
AlKaLI
 
Posts: 202
Joined: Mon Jan 21, 2013 8:08 pm

Re: CSX-Oak Point/Fremont

Postby gregorygrice » Fri Oct 12, 2018 7:07 pm

AlKaLI wrote:Took a later train into the city today due to the rain and was rewarded. NB CSX freight apparently stopped over the LIRR main. COFC with green trash containers and as my train neared Woodside caught the head-end. Two CSX engines, first unit looked like a SD40-2 and possibly the second. Around 7:10 AM this morning. Have not seen a CSX freight for a while and remember that trash cars usually are at the end of the train.



Should be Y102. Also the Fremont Secondary runs East/West.
User avatar
gregorygrice
 
Posts: 1011
Joined: Fri Jan 29, 2010 4:39 pm
Location: Queens, NY

Re: CSX-Oak Point/Fremont

Postby DogBert » Wed Nov 28, 2018 9:39 am

No mention of that extended siding here? 🤔

The 'double track' that was installed when the new BQE overpass opened is being extended (south/east), from just past Roosevelt avenue to what appears to be somewhere north of Grand Avenue. I believe the idea will be for CSX to drop inbound cars here, and retrieve cars from fremont quicker without the run around through the yard (which limits capacity there). I assume NY&A would then run up to this siding and grab the inbound cars.

If the new siding is to go further south than grand ave, it looks like they'll have to realign the existing track off center and back to where it was originally installed (when the whole route was two track).
DogBert
 
Posts: 1755
Joined: Mon Mar 15, 2004 7:08 pm

Re: CSX-Oak Point/Fremont

Postby ccutler » Wed Nov 28, 2018 5:55 pm

Thanks for the update! I moved out of NYC a year ago and appreciate the reports DogBert. The siding sounds like a sensible capacity-enhancing and cost-control move by CSX. I'm sure the neighbors will enjoy seeing freight cars parked along the BQE ;-)
ccutler
 
Posts: 851
Joined: Thu Mar 18, 2010 10:17 pm

Re: CSX-Oak Point/Fremont

Postby AlKaLI » Thu Nov 29, 2018 12:44 pm

I'll second the thanks to Dogbert for his updates!

Finally, I have something for this thread as well.
Westbound CSX freight to Oak Point crossing over the LIRR main this morning at 7:00 AM. Didn't see the head end power. Large cut of about 20-25 loaded CDEX cars trailing green containers of waste on flatcars heading to Hell Gate.

There are some ties scattered to the west of the current railbed near the LIRR main. I don't know if these are for the new siding or if replacement on the current track.
AlKaLI
 
Posts: 202
Joined: Mon Jan 21, 2013 8:08 pm

Re: CSX-Oak Point/Fremont

Postby DogBert » Fri Nov 30, 2018 12:00 pm

Those ties might be either. They have slowly replaced ties here and there in the last year. A bunch were replaced up at Bowery Bay.
DogBert
 
Posts: 1755
Joined: Mon Mar 15, 2004 7:08 pm

Re: CSX-Oak Point/Fremont

Postby Backshophoss » Fri Nov 30, 2018 6:25 pm

CSX is just putting "gauge" ties so the track doesn't spread apart under a loaded car or loco.
just very basic track maintenance.
Backshophoss
 
Posts: 5586
Joined: Mon Mar 05, 2012 7:58 pm

Re: CSX-Oak Point/Fremont

Postby AlKaLI » Thu Dec 06, 2018 3:00 pm

Yesterday at about 1:20 PM, as my EB train sped under the line, I spotted two MofW trucks on the tracks. Appeared to be doing routine maintenance as Backshophoss said.
AlKaLI
 
Posts: 202
Joined: Mon Jan 21, 2013 8:08 pm

Re: CSX-Oak Point/Fremont

Postby DogBert » Sat Dec 08, 2018 10:23 pm

They are installing the siding track right at that spot. If I get a chance I'll post a photo. There's a nice clear view over queens blvd viaduct & past the LIRR overpass 1 block north of queens blvd.
DogBert
 
Posts: 1755
Joined: Mon Mar 15, 2004 7:08 pm

Re: CSX-Oak Point/Fremont

Postby DogBert » Tue Dec 11, 2018 9:52 am

Measured the approximate distance of the new rail + existing siding over the BQE. When it's complete, it'll measure roughly 1.5 miles. Should be enough park your average sized oak point->FP train, with a bit of buffer.

The attached map is approximated, but here's where the the new siding will be. Looked like the track was being laid from the south to the north (east/west), with ties and rails up to the Queens blvd. viaduct at the moment.

A longer siding would mean realigning track from grand ave south, or better stabilizing the embankment north towards bowery bay (which has decayed a bit around the east edge over the years). Both would have been more expensive, so this looks like the cheapest spot to do it, while also avoiding the NIMBYs closer to fresh pond.

CSXNewSiding.png
DogBert
 
Posts: 1755
Joined: Mon Mar 15, 2004 7:08 pm

Re: CSX-Oak Point/Fremont

Postby Backshophoss » Tue Dec 11, 2018 8:31 pm

Might be used to lay up FPCH with the P&W's power laid up at NY&A's engine house at Fresh Pond.
CSX doesn't like P&W hogging yard space at Oak Point due to Crews out of hours to run on MN's New Haven line. :wink:
Backshophoss
 
Posts: 5586
Joined: Mon Mar 05, 2012 7:58 pm

Previous