Re: NEC Portal Bridge Thread - Operation, Replacement Etc.

Postby Arlington » Tue Oct 23, 2018 11:27 am

daybeers wrote:
Arlington wrote:Could some generous soul update https://en.wikipedia.org/wiki/Portal_Bridge based on recent funding information?

What would you like updated? Also, does anyone have a good picture of the bridge that they're willing to upload to Wikimedia Commons? The current picture used for the Wikipedia article is terrible quality.


Wikipedia says of New Jersey:
It is the policy of the state of New Jersey that all documents originating from web sites of executive departments and non-independent agencies are "available to the public and anyone may view, copy or distribute State information found here without obligation to the State" unless the document specifically states otherwise.[19] Likewise, all records obtain from state, county, or local government entities in New Jersey via the state's Open Public Records Act (OPRA), per a 2009 decision of the New Jersey Supreme Court, may be reproduced including for commercial purposes.[20]

According to the New Jersey Open Data Initiative Act (N.J.S.A 52:18A-234.5[21]), all information listed on state agencies open data web portals, "shall be treated as license free, subject to reuse, and not subject to copyright restrictions". This effectively makes data published under this act in the public domain.


Between US and NJ, seems like that would make it worth uploading the Portal Bridge images
"Trying to solve congestion by making roadways wider is like trying to solve obesity by buying bigger pants."--Charles Marohn
Arlington
 
Posts: 3680
Joined: Wed Jun 02, 2004 7:51 am
Location: Medford MA (was Arlington MA and Arlington VA)

Re: NEC Portal Bridge Thread - Operation, Replacement Etc.

Postby Acela150 » Tue Oct 30, 2018 6:28 pm

Portal Bridge failed today in the heat of the PM Rush Hour. Funding can't come soon enough for a replacement.
Acela150
 
Posts: 129
Joined: Wed Feb 12, 2014 12:00 am

Re: NEC Portal Bridge Thread - Operation, Replacement Etc.

Postby east point » Tue Oct 30, 2018 6:51 pm

North Portal Bridge is reported to meet milestone however this piece seems to be lacking ?

https://www.njspotlight.com/stories/18/ ... -in-place/
east point
 
Posts: 1088
Joined: Tue Feb 16, 2016 1:50 pm

Re: NEC Portal Bridge Thread - Operation, Replacement Etc.

Postby JamesRR » Wed Oct 31, 2018 4:31 pm

Every time I read a story on Portal Bridge I'm confused. I thought there was a singular project to simply rebuild the existing bridge, outside of Gateway - Portal Bridge North. Then I thought there was a second Portral Bridge project (two more tracks on a separate span) that is a part of Gateway, which includes a 4-track approach to the new tunnels to improve capacity.

And I thought it was the former that had funding to begin work. Which is what this article mentions.
User avatar
JamesRR
 
Posts: 358
Joined: Thu Jul 10, 2008 3:31 pm

Re: NEC Portal Bridge Thread - Operation, Replacement Etc.

Postby east point » Wed Oct 31, 2018 5:50 pm

Portal north is a new high level fixed span that is now under consideration and some preliminary work is underway. Portal south also high level fixed on other side (?) of swing bridge is just proposed. Swing bridge is just having major maintenance occurring every week. After Portal north is built different sources say it will be either kept until Portal south is built and in service, until Portal south construction is started since Portal south is going in on same alignment as swing bridge (?), or immediately scrapped once Portal north is in service . Take your best guess ?
east point
 
Posts: 1088
Joined: Tue Feb 16, 2016 1:50 pm

Re: NEC Portal Bridge Thread - Operation, Replacement Etc.

Postby EuroStar » Thu Nov 01, 2018 8:11 am

Acela150 wrote:Portal Bridge failed today in the heat of the PM Rush Hour. Funding can't come soon enough for a replacement.

The bridge actually failed twice on Tuesday. Once immediately after the morning Rush Hour and once in the afternoon. I wonder whether it was the same boat going up the river and then later down the river.

east point wrote:After Portal north is built different sources say it will be either kept until Portal south is built and in service, until Portal south construction is started since Portal south is going in on same alignment as swing bridge (?), or immediately scrapped once Portal north is in service . Take your best guess ?


The current plans do not envision keeping the existing bridge in operation after the completion of Portal North. This is because there is no point in keeping the existing span given than there is no extra capacity east or west of it justifying 4 tracks over the river. The current plans are to move the steel span off-site, possibly for historical preservation and demolition of the central pier in order to provide a wider navigable channel in the river.

While it is possible that a decision "could" be made to preserve and rehab the existing span as a cost saving measure for the follow up phases of the Gateway Project, such a decision has NOT been made and anything in regards to that is pure railfan speculation.
EuroStar
 
Posts: 576
Joined: Fri Oct 19, 2012 8:26 pm
Location: Middle of Nowhere

Re: NEC Portal Bridge Thread - Operation, Replacement Etc.

Postby gokeefe » Sat Nov 03, 2018 2:57 pm

At this point it looks as though the project is on a "build it now, we'll come up with the money as it goes along". High stakes but also makes it much harder for it to fail. Voters simply won't tolerate it.
gokeefe
User avatar
gokeefe
 
Posts: 10874
Joined: Sat Feb 16, 2008 12:28 pm
Location: Winthrop, Maine

Re: NEC Portal Bridge Thread - Operation, Replacement Etc.

Postby ThirdRail7 » Fri Nov 16, 2018 10:33 am

EuroStar wrote:
Acela150 wrote:Portal Bridge failed today in the heat of the PM Rush Hour. Funding can't come soon enough for a replacement.

The bridge actually failed twice on Tuesday. Once immediately after the morning Rush Hour and once in the afternoon. I wonder whether it was the same boat going up the river and then later down the river.


It was.

How many years would it take to build this new structure?
I want my road foreman!
ThirdRail7
 
Posts: 4040
Joined: Sat Oct 01, 2011 7:07 pm

Re: NEC Portal Bridge Thread - Operation, Replacement Etc.

Postby R&DB » Sat Nov 17, 2018 10:56 am

How long would it take to craft legislation to outlaw marine traffic through that area that requires bridge openings except at night, say 9pm to 4am?
Harry
User avatar
R&DB
 
Posts: 500
Joined: Thu Jan 16, 2014 12:55 pm
Location: Sou.Sec. MP 53.6

Re: NEC Portal Bridge Thread - Operation, Replacement Etc.

Postby EuroStar » Mon Nov 19, 2018 9:10 am

On November 14th, NJT board had an item to proceed with the purchase of environmental credits for the bridge. For all the complaining about the federal delays, why is NJT doing this only now? It is not that they will close on the purchase for another 6 months due to all the bureaucracy. It is an agency that is obviously not in a hurry to get much done ...
EuroStar
 
Posts: 576
Joined: Fri Oct 19, 2012 8:26 pm
Location: Middle of Nowhere

Re: NEC Portal Bridge Thread - Operation, Replacement Etc.

Postby benboston » Mon Nov 19, 2018 4:07 pm

This is strange considering that so many of their trains go over this bridge.
benboston
 
Posts: 95
Joined: Sun Feb 25, 2018 3:44 pm

Re: NEC Portal Bridge Thread - Operation, Replacement Etc.

Postby electricron » Mon Nov 19, 2018 7:54 pm

Why does any state agency have to buy environmental credits to build a replacement of an existing bridge within an existing train corridor? It’s these stupid and unneeded procedural costs that makes building anything new so expensive today!
electricron
 
Posts: 4349
Joined: Tue Aug 25, 2009 8:35 pm

Re: NEC Portal Bridge Thread - Operation, Replacement Etc.

Postby gokeefe » Mon Nov 19, 2018 7:56 pm

Wetlands replacement.
gokeefe
User avatar
gokeefe
 
Posts: 10874
Joined: Sat Feb 16, 2008 12:28 pm
Location: Winthrop, Maine

Re: NEC Portal Bridge Thread - Operation, Replacement Etc.

Postby MaRoFu » Sun Dec 02, 2018 8:17 pm

This is priceless.

Someone started a $920 million GoFundMe page for the Portal Bridge.
Really shows how desperate and frustrated commuters are getting at this point.

https://www.gofundme.com/replace-the-portal-bridge
Train systems ridden (excl. airport trains): Amtrak, CTA Loop, D.C. Metro, JR (Central, East, West), Keisei, M&Erie, NJ Transit (NLR & HBLR), NYC Subway, Osaka City Subway, PATH, Shizutetsu, TDR Monorail, Tokyo Metro, TTC Metro/Streetcar
MaRoFu
 
Posts: 53
Joined: Sat Dec 17, 2016 11:14 am
Location: New Jersey

Re: NEC Portal Bridge Thread - Operation, Replacement Etc.

Postby east point » Sun Dec 02, 2018 9:34 pm



Never noticed but the present Portal bridge waterway direction is not perpendicular to the Amtrak tracks. That certainly is a more difficult navigation problem for barges. Wonder if this is tidal influenced ? If so transit times might belimited by tides ?
east point
 
Posts: 1088
Joined: Tue Feb 16, 2016 1:50 pm