Track Quality

Postby johnpbarlow » Tue Aug 09, 2016 6:54 am

Had the opportunity to ride a track car with NEREX group on P&W between Worcester and Plainfield/Versailles (Saturday 8/6/16) and Central Falls (Sunday 8/7/16). In general, although P&W has little CWR installed, track quality is excellent with obvious signs of recent tie replacements and ballast/surfacing work on both of these lines, including the 10 mile piece of the Willimantic line we rode. Unfortunately, there are many rusty and/or disconnected sidings along the way. But P&W continues to find and build business. Interestingly, just north of Valley Falls is a partially built, rusting siding built on concrete ties. The siding appears to be about 2 miles long but isn't connected at the south end. Does anyone know the story re: why it was started but not completed?
johnpbarlow
 
Posts: 1616
Joined: Fri Mar 12, 2004 12:50 pm

Re: Track Quality

Postby MBTA F40PH-2C 1050 » Thu Aug 18, 2016 4:56 pm

The siding that you are referring to was built when business was booming and Valley Falls yard was having a tough time holding all the car loads. The concrete ties used are old ties given/sold to the P&W from the MBTA. Freight is on the downward trend the last few months with gas prices tanking, and said siding hasn't been put to full use
MBTA F40PH-2C 1050
 
Posts: 3498
Joined: Thu Mar 11, 2004 7:57 pm