Hidden third rail streetcar?

General discussion of passenger rail proposals and systems not otherwise covered in the specific forums in this category, including high speed rail.

Moderators: gprimr1, mtuandrew

Hidden third rail streetcar?

Postby STrRedWolf » Sun Apr 10, 2016 8:35 am

Isn't there a streetcar system that has a hidden third rail along the middle of the track, and the power is induction? I thought DC Streetcar was that but it's using regular catenary line.
"The last and final stop is BALTIMORE PENN STATION." I can has MARC V?
User avatar
STrRedWolf
 
Posts: 794
Joined: Sat Oct 24, 2015 5:18 pm
Location: Baltimore, MD

Re: Hidden third rail streetcar?

Postby mtuandrew » Sun Apr 10, 2016 11:17 am

The former DC system (Capitol Transit and DC Transit, plus their forerunners) used hidden third rail conduit (see https://en.wikipedia.org/wiki/Conduit_c ... collection, hybrid systems) but the current system uses overhead catenary.
User avatar
mtuandrew
 
Posts: 4289
Joined: Tue Feb 20, 2007 2:59 am
Location: the Manassas Gap Independent Line

Re: Hidden third rail streetcar?

Postby ExCon90 » Sun Apr 10, 2016 2:31 pm

There is a newbuild system in Bordeaux (3 routes), where the city authorities didn't want overhead wires in scenic or traditional areas, particularly on the bridge over the Garonne. The third rail is flush with the pavement and only energized when a car is actually over it; I don't know whether it's by induction or actual contact with a shoe. There were some bugs, but they seem to have been straightened out.
ExCon90
 
Posts: 3579
Joined: Thu Sep 18, 2008 1:22 pm

Re: Hidden third rail streetcar?

Postby dowlingm » Sun Apr 24, 2016 8:05 pm

The Bordeaux system is Alstom's APS.
http://www.alstom.com/products-services ... er-supply/

Bombardier has a system called PRIMOVE which uses induction. I think there is at least 1 or 2 others.

The problem for me with these systems is the implied vendor lock-in.
dowlingm
 
Posts: 1015
Joined: Mon Apr 16, 2012 12:42 pm
Location: Toronto, ON

Re: Hidden third rail streetcar?

Postby Myrtone » Sun Jun 26, 2016 3:23 am

The solution to the problem of vendor lock-in is the licence the power supply technologies out to other manufacturers.
Also known as Myrtonos
Myrtone
 
Posts: 170
Joined: Sat Sep 25, 2010 6:11 pm

Re: Hidden third rail streetcar?

Postby Ken W2KB » Sun Jun 26, 2016 7:20 pm

Myrtone wrote:The solution to the problem of vendor lock-in is the licence the power supply technologies out to other manufacturers.


Why would the owner of the technology not want to keep the monopoly for the life of its patent? It can leverage the patent to be the sole-source vendor.
~Ken :: Fairmont ex-UP/MP C436 MT-14M1 :: Cessna 177B Cardinal N16019
Black River Railroad Historical Trust :: My Personal Site
User avatar
Ken W2KB
 
Posts: 5654
Joined: Thu Mar 11, 2004 9:27 pm
Location: Lebanon Township, Hunterdon County, New Jersey & Tiverton, RI USA

Re: Hidden third rail streetcar?

Postby Myrtone » Sun Jun 26, 2016 7:54 pm

Because that might discourage others for adopting this system.
Also known as Myrtonos
Myrtone
 
Posts: 170
Joined: Sat Sep 25, 2010 6:11 pm


Return to General Discussion - Passenger Rail

Who is online

Users browsing this forum: No registered users and 2 guests