Conrail ZTS maps (1986/87) show PS&N track on the south side of the PRR main as in service on the east side of the Shawmut wye and some team tracks on the west side of the wye.

When did this track stop being used and when was it ripped out?

Thanks,

Charles
Last edited by nydepot on Fri Jun 01, 2018 1:02 pm, edited 1 time in total.
nydepot
 
Posts: 2103
Joined: Fri Mar 12, 2004 7:50 am

Re: Conrail, the Shawmut & Olean

Postby jr » Fri Jun 01, 2018 11:43 am

This track was primarily used to serve the Tile Plant for raw materials supply. They put in an unloading shed on the mainline, circa 1980, with a pneumatic pipe running under E. State Street to the Plant.

The remains of the Shawmut were abandoned and torn up shortly thereafter.

JR
jr
 
Posts: 214
Joined: Thu Mar 11, 2004 9:52 pm

Re: Conrail, the Shawmut & Olean

Postby nydepot » Fri Jun 01, 2018 1:05 pm

nydepot
 
Posts: 2103
Joined: Fri Mar 12, 2004 7:50 am

Re: Conrail, the Shawmut & Olean

Postby jr » Fri Jun 01, 2018 4:26 pm

Yes, that's the "new" shed.

JR
jr
 
Posts: 214
Joined: Thu Mar 11, 2004 9:52 pm

Re: Conrail, the Shawmut & Olean

Postby thebigham » Sun Jun 03, 2018 1:27 pm

My pics of the PS&N tracks still in place in Olean in Nov/Dec 1986.
Attachments
IMG_20151210_0004.jpg
Bridge over Olean Creek
IMG_20151210_0005.jpg
IMG_20151210_0003.jpg
East State St. overpass. It has been filled in.
thebigham
 
Posts: 3555
Joined: Fri Mar 12, 2004 2:27 pm
Location: Arcade, NY

Re: Conrail, the Shawmut & Olean

Postby thebigham » Sun Jun 03, 2018 1:32 pm

By September 1987, the PS&N tracks had been pulled up in Olean
Attachments
IMG_20151210_0006.jpg
Former connection with CR
IMG_20151210_0007.jpg
East State St. overpass can hardly be seen
IMG_20151210_0008.jpg
Bridge over Olean Creek
thebigham
 
Posts: 3555
Joined: Fri Mar 12, 2004 2:27 pm
Location: Arcade, NY

Re: Conrail, the Shawmut & Olean

Postby nydepot » Sun Jun 03, 2018 8:37 pm

Thanks Chris and congrats on the new BOD position.

Charles
nydepot
 
Posts: 2103
Joined: Fri Mar 12, 2004 7:50 am

Re: Conrail, the Shawmut & Olean

Postby lvrr325 » Sun Jun 03, 2018 11:28 pm

From what I see on the map images the ROW has become a rail trail, including a portion to the southwest that looks to have served some customers along S. Clinton and Barry St. although the current trail ends before that, at Fulton St. where it meets Adams. The overpass labeled filled in above does not appear to be so.
lvrr325
 
Posts: 4406
Joined: Fri May 13, 2005 5:42 pm
Location: New York State

Re: Conrail, the Shawmut & Olean

Postby nydepot » Mon Jun 04, 2018 1:20 pm

Correct.

lvrr325 wrote:From what I see on the map images the ROW has become a rail trail, including a portion to the southwest that looks to have served some customers along S. Clinton and Barry St. although the current trail ends before that, at Fulton St. where it meets Adams. The overpass labeled filled in above does not appear to be so.
nydepot
 
Posts: 2103
Joined: Fri Mar 12, 2004 7:50 am

Re: Conrail, the Shawmut & Olean

Postby joesbag » Thu Jun 07, 2018 12:33 pm

On the Dresser-Rand property, it looks like one of their large outbuildings was a portion of a roundhouse. Is this the case and was it the Shawmut's? Thanks
joesbag
 
Posts: 77
Joined: Sun Aug 12, 2007 12:54 pm
Location: small middle Tennessee town on the former Tennessee Central

Re: Conrail, the Shawmut & Olean

Postby nydepot » Thu Jun 07, 2018 12:49 pm

That was the Pennsy shops.

joesbag wrote:On the Dresser-Rand property, it looks like one of their large outbuildings was a portion of a roundhouse. Is this the case and was it the Shawmut's? Thanks
nydepot
 
Posts: 2103
Joined: Fri Mar 12, 2004 7:50 am

Re: Conrail, the Shawmut & Olean

Postby jr » Fri Jun 08, 2018 10:05 am

Thanks to several friends, we have developed some more definite dates for the Tile Plant / Shawmut trackage in the earlier posts.

The new Tile Plant siding, at MP 72.1 on the mainline, went into service on September 1, 1977. (ref. Conrail General Order 115)

The Shawmut trackage to the back side of the TIle Plant was in service until approximately late 1982 or early 1983 (ref. the recollections and photos of at least two people who were "right there")

Therefore my recollection of them abandoning the former Shawmut "shortly" after the new siding went in, was not correct.