Work on Valley Road crossing?

Postby greyhairedpete » Wed Aug 05, 2015 3:24 pm

Looks like work is being done on the OOS Valley Road crossing in Hillsborough, (the one that goes into the Hercules Enterprises plant). Anyone have any info? Is NS going to serve this business?
greyhairedpete
 
Posts: 57
Joined: Thu Aug 09, 2012 8:35 pm

Re: Work on Valley Road crossing?

Postby ccutler » Thu Aug 06, 2015 9:55 am

It would be interesting. That siding has never been active in my memory...no use since before 1983
ccutler
 
Posts: 766
Joined: Thu Mar 18, 2010 10:17 pm

Re: Work on Valley Road crossing?

Postby BigDell » Thu Aug 06, 2015 12:16 pm

What kind of work are they doing? Hopefully not paving it over? Hope it's something fruitful. Any pics?
User avatar
BigDell
 
Posts: 775
Joined: Sat Mar 13, 2004 11:42 am
Location: NY & NJ

Re: Work on Valley Road crossing?

Postby greyhairedpete » Thu Aug 06, 2015 6:28 pm

I'll get a picture tomorrow. On the south side of the crossing, the brush has been removed, and some excavating has been completed.
greyhairedpete
 
Posts: 57
Joined: Thu Aug 09, 2012 8:35 pm

Re: Work on Valley Road crossing?

Postby greyhairedpete » Sat Aug 08, 2015 7:09 am

Brush cut, and excavation on the South side:
Image
The existing track on the North side:
Image
greyhairedpete
 
Posts: 57
Joined: Thu Aug 09, 2012 8:35 pm

Re: Work on Valley Road crossing?

Postby ccutler » Sat Aug 08, 2015 3:56 pm

That does not look like a good indication of future service.
ccutler
 
Posts: 766
Joined: Thu Mar 18, 2010 10:17 pm

Re: Work on Valley Road crossing?

Postby 908rails » Tue Aug 25, 2015 7:15 am

Since these photos were taken, NS has now laid gravel on top of the dirt in the ROW that has been cut out of the woods.
908rails
 
Posts: 7
Joined: Sun Aug 23, 2015 5:46 pm
Location: CP STONE

Re: Work on Valley Road crossing?

Postby pumpers » Tue Aug 25, 2015 9:14 am

908rails wrote:Since these photos were taken, NS has now laid gravel on top of the dirt in the ROW that has been cut out of the woods.

So there were no existing rails on the south side in the woods, unlike the rails visible in the north side photos?
Seems promising!
Jim S
pumpers
 
Posts: 1850
Joined: Mon Oct 25, 2004 1:56 pm

Re: Work on Valley Road crossing?

Postby 908rails » Tue Aug 25, 2015 12:35 pm

pumpers wrote:
908rails wrote:Since these photos were taken, NS has now laid gravel on top of the dirt in the ROW that has been cut out of the woods.

So there were no existing rails on the south side in the woods, unlike the rails visible in the north side photos?
Seems promising!
Jim S


Correct, it appears the south side of this crossing has had the ROW completely excavated up to the Lehigh Line just west of CP Sully(old Royce Runner) and the Aeropres Corporation switch currently served by Allentown based local H74/76 delivering tank cars a few days a week.

The Hercules Enterprises Corp also has a sign at the entrance to the property on Valley Road that says Sea Box. Intermodal supplies/equipment are built/assembled here.

More to come?
908rails
 
Posts: 7
Joined: Sun Aug 23, 2015 5:46 pm
Location: CP STONE

Re: Work on Valley Road crossing?

Postby ccutler » Tue Aug 25, 2015 3:08 pm

I rode past there on my bike on Sunday and took a close look. I believe the ballast there is from the construction of the original siding. There was even an old tie plate laying in the middle of the ballast. So unless something happened on Monday or Tuesday, I don't think they are relaying the siding.

Hopefully I am wrong.

I also noticed some blue markings from the water company in the area, and was wondering if the track removal work was related to water pipework in the area.
ccutler
 
Posts: 766
Joined: Thu Mar 18, 2010 10:17 pm

Re: Work on Valley Road crossing?

Postby rr503 » Tue Aug 25, 2015 7:33 pm

The photos above don't show any ballast...
rr503
 
Posts: 519
Joined: Sat May 02, 2015 4:13 pm
Location: North by Northwest

Re: Work on Valley Road crossing?

Postby ccutler » Wed Aug 26, 2015 6:28 am

Sorry to disappoint, but the photo does show a de minimis amount of old, brownish ballast. That's what I saw on Sunday.

I would love to see that spur being rehabbed and used. I believe the facility repairs seagoing shipping containers, but I'm not sure.
ccutler
 
Posts: 766
Joined: Thu Mar 18, 2010 10:17 pm

Re: Work on Valley Road crossing?

Postby CTL10D » Thu Aug 27, 2015 6:59 am

"....I also noticed some blue markings from the water company in the area, and was wondering if the track removal work was related to water pipework in the area..."

I work for NJ American water in Hillsborough, and as far as I know we have nothing going on over there, although I`ll dig into it. The markout isn`t neccessarily for water work, any utility company could be doing work there, they have to call for a markout to know where all the utilities are. However if NS was indeed doing track/crossing work there, they too would have to call for a markout. We`ll see what happens I suppose....
CTL10D
 
Posts: 302
Joined: Tue Sep 27, 2005 3:29 pm

Re: Work on Valley Road crossing?

Postby Ken W2KB » Thu Aug 27, 2015 10:55 am

CTL10D wrote:"....I also noticed some blue markings from the water company in the area, and was wondering if the track removal work was related to water pipework in the area..."

I work for NJ American water in Hillsborough, and as far as I know we have nothing going on over there, although I`ll dig into it. The markout isn`t neccessarily for water work, any utility company could be doing work there, they have to call for a markout to know where all the utilities are. However if NS was indeed doing track/crossing work there, they too would have to call for a markout. We`ll see what happens I suppose....


To supplement, NJ law, with a few limited exceptions none of which are applicble in this instance, requires everyone digging anywhere to a depth of more than 6 inches, a few days before starting the dig to call telephone number 811 to notify and requiring all utilities to prompty mark out any underground facilities using specific colors.
~Ken :: Fairmont ex-UP/MP C436 MT-14M1 :: Cessna 177B Cardinal N16019
Black River Railroad Historical Trust :: My Personal Site
User avatar
Ken W2KB
 
Posts: 5651
Joined: Thu Mar 11, 2004 9:27 pm
Location: Lebanon Township, Hunterdon County, New Jersey & Tiverton, RI USA

Re: Work on Valley Road crossing?

Postby trackwelder » Tue Sep 15, 2015 2:33 am

Ken W2KB wrote:
CTL10D wrote:"....I also noticed some blue markings from the water company in the area, and was wondering if the track removal work was related to water pipework in the area..."

I work for NJ American water in Hillsborough, and as far as I know we have nothing going on over there, although I`ll dig into it. The markout isn`t neccessarily for water work, any utility company could be doing work there, they have to call for a markout to know where all the utilities are. However if NS was indeed doing track/crossing work there, they too would have to call for a markout. We`ll see what happens I suppose....


To supplement, NJ law, with a few limited exceptions none of which are applicble in this instance, requires everyone digging anywhere to a depth of more than 6 inches, a few days before starting the dig to call telephone number 811 to notify and requiring all utilities to prompty mark out any underground facilities using specific colors.



6 inches? my dog digs deeper than that.
shipbuilder
rail maintainer, 1st class
FEBT volunteer

TWU 234---WE MOVE PHILADELPHIA!!!
trackwelder
 
Posts: 422
Joined: Tue Nov 09, 2010 10:00 pm