Beacon Park Tracker

Pertaining to all railroading subjects, past and present, in New England

Moderators: MEC407, NHN503

Re: Beacon Park Tracker

Postby nomis » Wed Sep 07, 2016 1:29 pm

The West end switch is currently connected to the 7 leftover tracks on the east end of Beacon Park, and the yard tracks that were not razed were still disconnected with no ladder to access the CP3 / Grand Junction / Houghton Chemical area. This was as of Sun / Monday.
Moderator: Metro-North (with CDOT), Photography & Video

Avatar: An overnight trip on Girard Ave. stumbles upon 6 PCC's and an LRV stuck within two blocks.
User avatar
nomis
 
Posts: 2018
Joined: Fri Jan 02, 2009 1:52 pm
Location: MRS 43 (was QA 9 & QB 2)

Re: Beacon Park Tracker

Postby fsdemasi » Tue Sep 13, 2016 10:08 pm

Photo of east end ladder with new grading to lead from CP 3 west.
Frank D...
fsdemasi
 
Posts: 17
Joined: Mon Apr 21, 2008 11:22 pm

Re: Beacon Park Tracker

Postby Cosmo » Thu Sep 15, 2016 12:34 pm

Ummm, dude? Think you forgot the link.... :wink:
"It belongs in a MUSEUM!"
-Indiana Jones
User avatar
Cosmo
 
Posts: 2319
Joined: Mon Mar 22, 2004 4:55 pm
Location: New London, CT

Previous

Return to New England Railfan

Who is online

Users browsing this forum: Bing [Bot] and 3 guests