Discussion related to commuter rail and rapid transit operations in the Chicago area including the South Shore Line, Metra Rail, and Chicago Transit Authority.

Moderators: metraRI, JamesT4

  by eolesen
 
I would not assume the IRM circuits being tied in. That brings a whole new level of cost and oversight the museum doesn't want to incur. They're a four month operation and that's a 365 day obligation.

Sent from my SM-S911U using Tapatalk

  by justalurker66
 
Zanperk wrote: Sun May 05, 2024 9:09 pmI assume IRM crossings would be tied into the circuits at aligned crossings.
Both Olsen and Seeman roads show up as two dots on their interactive map.